Importance of software Software can have a huge impact in any aspect of society.
Where can you findsoftware?
Some popular ones…
Some popular ones…
And even in…
Conclusion   Software is Almost   Everywhere.
Problems in software    development
Common issues •The final Software doesn´t fulfill the needs of the customer. •Hard to extend and improve: if you want to a...
Chaos Report
ConclusionProgramming is NOT enough!   It is not enough to do your best: you must   Know what to do, and THEN do your best...
Solution
Software EngineeringWhat is it? The application of a systematic, disciplined, quantifiable approach to the development, op...
Software EngineeringWhat is it? The study and application of methodologies to develop quality software that fulfill custom...
Software EngineeringObjetive To produce software that is:   • On time: is deliver at the established date.   • Reliable: d...
   Process means the events or tasks a development organization    does, and their sequence    › Again, think about const...
 Major Task Identification Sequencing General model to be tailored
   There are general principles about:    › What we do at various stages of SW development    › How to inject quality int...
Build First Version                 Modify until              Customer satisfied                                   Operati...
   Really Bad   Really Common   Advantages    › No Overhead    › No Expertise   Disadvantages    › No means of assessi...
Requirements  Validate               Design               Verify                        Implementation                    ...
REQUIREMENTS  ANALYSIS          SYSTEM          DESIGN                   PROGRAM                    DESIGN                ...
   Articulated by Win Royce, ~1970   Widely used today   Advantages     › Measurable progress     › Experience applying...
REQUIREMENTS  ANALYSIS          SYSTEM          DESIGN                   PROGRAM                    DESIGN                ...
RequirementsRequirements                                Change  Validate               Design               Verify        ...
RequirementsRapid Prototype                               Change   Validate                  Design                  Verif...
Initial Concept                    Design and                     Implement                  Initial Prototype            ...
   Prototypes used to help develop requirements    specification    › Useful for rapidly changing requirements    › Or wh...
Requirements  Validate     Architectural                  Design                  Verify                               Det...
   Iterations are classified according to feature    sets    › e.g., features 1 and 2 will be delivered      in this iter...
DETERMINE GOALS,                                                                                                          ...
   Proposed by Barry Boehm, ~1986   Similar to Incremental Model, but each iteration    is driven by “risk management” a...
Chapter 1 ASE Slides ppt
Chapter 1 ASE Slides ppt
Upcoming SlideShare
Loading in...5
×

Chapter 1 ASE Slides ppt

421

Published on

Ch No. 1

Published in: Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
421
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
8
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide
  • i. The final Software doesn´t fit the needs of the customer ii. Hard to extend and improve: if you want to add a functionality later is mission impossible Bad documentation, bad software design iii. Bad quality: frequent errors, hard to use... iv. More time and costs than expected
  • Coming back to the Chaos Report 2006, the thing that doesn’t change significantly over all those years is percentage of projects with time or budget overrun. It still oscillates around 50%
  • In simple terms, is the study and application of methodologies to develop quality software that fulfill customer needs.
  • In simple terms, is the study and application of methodologies to develop quality software that fulfill customer needs.
  • On time: deliver at the established date Reliable: doesn´t crash often, etc Complete: good documentation, fulfill customer needs
  • [Royce 1970] - DoD contracts PROS: Focuses attention Easy to explain to customers Intermediate products are made explicit CONS: Does not really reflect how software is produced Imposes PM structure - no explanation of how artifact from one stage is transformed in the next Failure to treat software as problem-solving process
  • [Royce 1970] - DoD contracts PROS: Focuses attention Easy to explain to customers Intermediate products are made explicit CONS: Does not really reflect how software is produced Imposes PM structure - no explanation of how artifact from one stage is transformed in the next Failure to treat software as problem-solving process
  • [Boehm 88] Viewed in light of risks involved Combine development with risk MGT
  • Transcript of "Chapter 1 ASE Slides ppt"

    1. 1. Importance of software Software can have a huge impact in any aspect of society.
    2. 2. Where can you findsoftware?
    3. 3. Some popular ones…
    4. 4. Some popular ones…
    5. 5. And even in…
    6. 6. Conclusion Software is Almost Everywhere.
    7. 7. Problems in software development
    8. 8. Common issues •The final Software doesn´t fulfill the needs of the customer. •Hard to extend and improve: if you want to add a functionality later is mission impossible. •Bad documentation. •Bad quality: frequent errors, hard to use, ... •More time and costs than expected
    9. 9. Chaos Report
    10. 10. ConclusionProgramming is NOT enough! It is not enough to do your best: you must Know what to do, and THEN do your best. -- W. Edwards Deming
    11. 11. Solution
    12. 12. Software EngineeringWhat is it? The application of a systematic, disciplined, quantifiable approach to the development, operation, and maintenance of software, and the study of these approaches; that is, the application of engineering to software. -Wikipedia
    13. 13. Software EngineeringWhat is it? The study and application of methodologies to develop quality software that fulfill customer needs.
    14. 14. Software EngineeringObjetive To produce software that is: • On time: is deliver at the established date. • Reliable: doesn´t crash. • Complete: good documentation, fulfill customer needs.
    15. 15.  Process means the events or tasks a development organization does, and their sequence › Again, think about construction Organizations want a well-defined, well-understood, repeatable software development process. Why? Find and repeat good practices Management: know what to do next; know when we’re done with current task; know if we’re late; estimate time to completion, costs; Etc. New team-members know what to do 17 (CS340 J. Knight & T. Horton 2008)
    16. 16.  Major Task Identification Sequencing General model to be tailored
    17. 17.  There are general principles about: › What we do at various stages of SW development › How to inject quality into SW › How to avoid early problems that cause huge problems later › Recognize that SE is not just writing code No matter what process you end up doing, these general principles are the most important “take-away” from this material 19 (CS340 J. Knight & T. Horton 2008)
    18. 18. Build First Version Modify until Customer satisfied Operations Retirement
    19. 19.  Really Bad Really Common Advantages › No Overhead › No Expertise Disadvantages › No means of assessing progress › Difficult to coordinate multiple programmers Useful for “hacking” single-use/personal-use programs: start with empty program and debug until it works
    20. 20. Requirements Validate Design Verify Implementation Test Operations Retirement
    21. 21. REQUIREMENTS ANALYSIS SYSTEM DESIGN PROGRAM DESIGN CODING UNIT & INTE- GRATION TESTING SYSTEM TESTING ACCEPTANCE TESTING OPERATION & MAINTENANCE
    22. 22.  Articulated by Win Royce, ~1970 Widely used today Advantages › Measurable progress › Experience applying steps in past projects can be used in estimating duration of “similar” steps in future projects › Produces software artifacts that can be re-used in other projects The original waterfall model (as interpreted by many) disallowed iteration › Inflexible › Monolithic › Requirements change over time › Maintenance not handled well The “waterfall with feedback” model was, however, what Royce had in mind
    23. 23. REQUIREMENTS ANALYSIS SYSTEM DESIGN PROGRAM DESIGN CODING UNIT & INTE- GRATION TESTING SYSTEM TESTING ACCEPTANCE TESTING OPERATION & MAINTENANCE
    24. 24. RequirementsRequirements Change Validate Design Verify Implementation Test Operations Retirement
    25. 25. RequirementsRapid Prototype Change Validate Design Verify Implementation Test Operations Retirement
    26. 26. Initial Concept Design and Implement Initial Prototype Refine Prototype Until Acceptance Complete and Release Prototype
    27. 27.  Prototypes used to help develop requirements specification › Useful for rapidly changing requirements › Or when customer won’t commit to specification Once requirements “known”, waterfall (or some other process model) is used Prototypes discarded once design begins › Prototypes should not be used as a basis for implementation, since prototyping tools do not create production quality code › Customer may need to be “educated” about prototypes, a prototype is not 80-90% of the final product (not even 10%)
    28. 28. Requirements Validate Architectural Design Verify Detailed Design, Implement, Test, Deliver Feature Set Operations Retirement
    29. 29.  Iterations are classified according to feature sets › e.g., features 1 and 2 will be delivered in this iteration, features 3 and 4 are next Series of increasingly “complete” releases
    30. 30. DETERMINE GOALS, EVALUATE ALTERNATIVESALTERNATIVES, AND RISKSCONSTRAINTS traints 4 Risk analysis 4 Cons traints 3 Risk analysis 3 4 Cons s t ive na lt er traints 2 Risk analysis 2 A es 3 Cons a tiv rn Alte es 2 Co tiv na ns Risk analysis 1 er tra Proto - Proto - Proto - Alt Alte rna int tive s Prototype type 2 type 3 type 4 Budget 4 Budget 3 Budget Budget s 1 1 1 1 2 start Requirements, Concept of Detailed sig re e nts de ftwa design life-cycle plan operation ar me n ftw ire So De Int vel op So qu e an grat pla men d re date ts dt i es on n t Vali iremen Code tp requ , lan dated ign Vali des fied veri Unit testPLAN System DEVELOP AND TEST test Acceptance Implementation test plan
    31. 31.  Proposed by Barry Boehm, ~1986 Similar to Incremental Model, but each iteration is driven by “risk management” and/or customer feedback  Determine objectives and current status  Identify risks and priorities  Next iteration addresses (current) highest risk and/ or highest priority items  Repeat