The Big Picture: Context of Collaboration5.5 Miles of the Mississippi
The Big Picture: Context of Collaboration                                             RiverFIRST Proposal Multi Modal Gree...
The Big Picture: Context of Collaboration                                                           River Projects Multi M...
The Big Picture: Context of Collaboration                                                           River Projects Multi M...
The Big Picture: Context of Collaboration                                                                   River Projects...
MPRB      NMRP                                        The Big Picture: Context of CollaborationMPRB                       ...
The Big Picture: Context of Collaboration  City of Minneapolis
The Big Picture: Context of Collaboration   The Grand Rounds
The Big Picture: Context of Collaboration       The Missing Link
The Big Picture: Context of CollaborationMetropolitan Area
The Big Picture: Context of CollaborationExisting Trails
The Big Picture: Context of CollaborationProposed Connections
The Big Picture: Context of CollaborationINSTITUTION      PROJECT      COMPLETION   FUNDING SOURCE   COST
The Big Picture: Context of CollaborationINSTITUTION      PROJECT        COMPLETION   FUNDING SOURCE       COSTMWMO       ...
The Big Picture: Context of CollaborationINSTITUTION      PROJECT             COMPLETION   FUNDING SOURCE                 ...
The Big Picture: Context of CollaborationINSTITUTION       PROJECT             COMPLETION   FUNDING SOURCE                ...
The Big Picture: Context of CollaborationINSTITUTION           PROJECT                  COMPLETION   FUNDING SOURCE       ...
The Big Picture: Context of CollaborationINSTITUTION           PROJECT                       COMPLETION   FUNDING SOURCE  ...
The Big Picture: Context of CollaborationINSTITUTION           PROJECT                       COMPLETION   FUNDING SOURCE  ...
The Big Picture: Context of CollaborationINSTITUTION           PROJECT                       COMPLETION   FUNDING SOURCE  ...
Upcoming SlideShare
Loading in...5
×

Upper Riverfront Map+Timeline Presentation (24-25 May 2011)

900

Published on

Published in: Design
0 Comments
2 Likes
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
900
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
0
Comments
0
Likes
2
Embeds 0
No embeds

No notes for slide

Transcript of "Upper Riverfront Map+Timeline Presentation (24-25 May 2011)"

  1. 1. The Big Picture: Context of Collaboration5.5 Miles of the Mississippi
  2. 2. The Big Picture: Context of Collaboration RiverFIRST Proposal Multi Modal Green Port Wetland Reclamation Continuous Riverfront Trails Northeast Bluffs Overlook/EcostairsFarview ParkExpansion Floating BioHaven Islands Scherer Park Beach Library Square Park River Connection Spirit Island Remembrance
  3. 3. The Big Picture: Context of Collaboration River Projects Multi Modal Green Port Wetland Reclamation MWMO Headquarters Continuous Riverfront Trails Northeast Bluffs Overlook/EcostairsFarview ParkExpansion Floating BioHaven Islands Scherer Park Beach Library Square Park River Connection Spirit Island Remembrance
  4. 4. The Big Picture: Context of Collaboration River Projects Multi Modal Green Port Wetland Reclamation MWMO Headquarters Continuous Riverfront Trails Hennepin County Lowry Bridge Replacement Northeast Bluffs Overlook/EcostairsFarview ParkExpansion Floating BioHaven Islands Scherer Park Beach Library Square Park River Connection Spirit Island Remembrance
  5. 5. The Big Picture: Context of Collaboration River Projects Multi Modal Green Port Wetland Reclamation MWMO Headquarters Continuous Riverfront Trails Hennepin County Lowry Bridge Replacement Northeast Bluffs Overlook/EcostairsFarview ParkExpansion Floating BioHaven Islands Scherer Park Beach City of Minneapolis Plymouth Bridge Repair City of Minneapolis Cedar Lake Bike Trail Library Square Park River Connection Spirit Island Remembrance
  6. 6. MPRB NMRP The Big Picture: Context of CollaborationMPRB River ProjectsWeber Park Multi Modal Green Port MPRB Marshall Terrace Wetland Reclamation MWMO Headquarters Continuous Riverfront Trails Hennepin County Lowry Bridge Replacement Northeast Bluffs Overlook/Ecostairs Farview Park Expansion MPRB Bottineau MPRB Lighting Floating BioHaven Islands MPRB Sheridan Park MPRB Scherer Scherer Park Beach Acquisition / Cleanup City of Minneapolis Plymouth Bridge Repair MPRB Central River Trails MPRB Boom Island/ BF Nelson MPRB MPRB 4th Avenue Father Hennepin Playground Connections City of Minneapolis Cedar Lake Bike Trail Library Square Park River Connection Spirit Island Remembrance
  7. 7. The Big Picture: Context of Collaboration City of Minneapolis
  8. 8. The Big Picture: Context of Collaboration The Grand Rounds
  9. 9. The Big Picture: Context of Collaboration The Missing Link
  10. 10. The Big Picture: Context of CollaborationMetropolitan Area
  11. 11. The Big Picture: Context of CollaborationExisting Trails
  12. 12. The Big Picture: Context of CollaborationProposed Connections
  13. 13. The Big Picture: Context of CollaborationINSTITUTION PROJECT COMPLETION FUNDING SOURCE COST
  14. 14. The Big Picture: Context of CollaborationINSTITUTION PROJECT COMPLETION FUNDING SOURCE COSTMWMO Headquarters 2015 3,500,000
  15. 15. The Big Picture: Context of CollaborationINSTITUTION PROJECT COMPLETION FUNDING SOURCE COSTMWMO Headquarters 2015 3,500,0003 Rivers 57th Avenue 2015/16 Fed Transport Enhancement 1,500,000 Funds and 3 Rivers Lowry to Broadway 2014 STP 2,000,000
  16. 16. The Big Picture: Context of CollaborationINSTITUTION PROJECT COMPLETION FUNDING SOURCE COSTMWMO Headquarters 2015 3,500,0003 Rivers 57th Avenue 2015/16 Fed Transport Enhancement 1,500,000 Funds and 3 Rivers Lowry to Broadway 2014 STP 2,000,000Hennepin County Lowry Bridge 2012 Hennepin County, State, Federal 100,000,000
  17. 17. The Big Picture: Context of CollaborationINSTITUTION PROJECT COMPLETION FUNDING SOURCE COSTMWMO Headquarters 2015 3,500,0003 Rivers 57th Avenue 2015/16 Fed Transport Enhancement 1,500,000 Funds and 3 Rivers Lowry to Broadway 2014 STP 2,000,000Hennepin County Lowry Bridge 2012 Hennepin County, State, Federal 100,000,000City of Minneapolis Cedar Lake Bike Trail 2011 City, Federal 10,000,000 Plymouth Bridge Repair 2012 City, State 9,000,000
  18. 18. The Big Picture: Context of CollaborationINSTITUTION PROJECT COMPLETION FUNDING SOURCE COSTMWMO Headquarters 2015 3,500,0003 Rivers 57th Avenue 2015/16 Fed Transport Enhancement 1,500,000 Funds and 3 Rivers Lowry to Broadway 2014 STP 2,000,000Hennepin County Lowry Bridge 2012 Hennepin County, State, Federal 100,000,000City of Minneapolis Cedar Lake Bike Trail 2011 City, Federal 10,000,000 Plymouth Bridge Repair 2012 City, State 9,000,000MPRB MRDC, DI, ATF, Central Mississippi, Trails 2015 Legacy, Met Council, Federal 11,418,311 Central River Trails 2011 Lottery 100,000 Sheridan Park 2011 MWMO, Met Council, NRP 1,290,000 Boom Island 2012 Legacy, Met Council, DNR 3,337,000 4th Avenue N 2011 MPF, Sonations, Legacy 400,000 Bottineau 2011 175,000 Marshall Terrace 2011 Capital Levy 100,000 Scherer Clean-up 2011 Hennepin County 1,600,000 Lighting 2011 Legacy 360,000 NMRP 2012 900,000 Father Hennepin Lottery, sf4b, mwmo 1,180,000 Scherer Acquisition 2015 Legacy 5,660,000
  19. 19. The Big Picture: Context of CollaborationINSTITUTION PROJECT COMPLETION FUNDING SOURCE COSTMWMO Headquarters 2015 3,500,0003 Rivers 57th Avenue 2015/16 Fed Transport Enhancement 1,500,000 Funds and 3 Rivers Lowry to Broadway 2014 STP 2,000,000Hennepin County Lowry Bridge 2012 Hennepin County, State, Federal 100,000,000City of Minneapolis Cedar Lake Bike Trail 2011 City, Federal 10,000,000 Plymouth Bridge Repair 2012 City, State 9,000,000MPRB MRDC, DI, ATF, Central Mississippi, Trails 2015 Legacy, Met Council, Federal 11,418,311 Central River Trails 2011 Lottery 100,000 Sheridan Park 2011 MWMO, Met Council, NRP 1,290,000 Boom Island 2012 Legacy, Met Council, DNR 3,337,000 4th Avenue N 2011 MPF, Sonations, Legacy 400,000 Bottineau 2011 175,000 Marshall Terrace 2011 Capital Levy 100,000 Scherer Clean-up 2011 Hennepin County 1,600,000 Lighting 2011 Legacy 360,000 NMRP 2012 900,000 Father Hennepin Lottery, sf4b, mwmo 1,180,000 Scherer Acquisition 2015 Legacy 5,660,000 Total 152,520,311
  20. 20. The Big Picture: Context of CollaborationINSTITUTION PROJECT COMPLETION FUNDING SOURCE COSTMWMO Headquarters 2015 3,500,0003 Rivers 57th Avenue 2015/16 Fed Transport Enhancement 1,500,000 Funds and 3 Rivers Lowry to Broadway 2014 STP 2,000,000Hennepin County Lowry Bridge 2012 Hennepin County, State, Federal 100,000,000City of Minneapolis Cedar Lake Bike Trail 2011 City, Federal 10,000,000 Plymouth Bridge Repair 2012 City, State 9,000,000MPRB MRDC, DI, ATF, Central Mississippi, Trails 2015 Legacy, Met Council, Federal 11,418,311 Central River Trails 2011 Lottery 100,000 Sheridan Park 2011 MWMO, Met Council, NRP 1,290,000 Boom Island 2012 Legacy, Met Council, DNR 3,337,000 4th Avenue N 2011 MPF, Sonations, Legacy 400,000 Bottineau 2011 175,000 Marshall Terrace 2011 Capital Levy 100,000 Scherer Clean-up 2011 Hennepin County 1,600,000 Lighting 2011 Legacy 360,000 NMRP 2012 900,000 Father Hennepin Lottery, sf4b, mwmo 1,180,000 Scherer Acquisition 2015 Legacy 5,660,000Anoka Total 152,520,311

×