Your SlideShare is downloading. ×
TLS/KVA RiverFIRST Project Criteria, 24-25 May
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

TLS/KVA RiverFIRST Project Criteria, 24-25 May

737

Published on

TLS/KVA is the design partner of the Minneapolis Riverfront Development Initiative (MR|DI). In this presentation, the design team outlines their design criteria for identifying priority parks projects …

TLS/KVA is the design partner of the Minneapolis Riverfront Development Initiative (MR|DI). In this presentation, the design team outlines their design criteria for identifying priority parks projects - sites and/or systems - for development along the Upper Riverfront in Minneapolis within the next five years.

Published in: Design, Technology, Travel
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
737
On Slideshare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. RIVERFIRST
    21st Century Riverfront Design Proposal
    PUBLIC MEETING
    25 May 2011
    Minneapolis, MN
    skennedy@kvarch.net
    tom@tomleader.com
    fviolich@kvarch.net KVA TLS Team
     
     
  • 2.
  • 3.
  • 4. RIVERFIRST Proposal Plan
    Minneapolis 21st Century Riverfront
  • 5. COMMUNITY BENEFITS
    MUNICIPAL NEEDS
    TIMING & LAND OWNERSHIP
    DEMONSTRATION CAPACITY
    SITE PRIORITIZATION CRITERIA
  • 6. MPRB PARKLAND
    PRIVATE PROPERTY
    PUBLIC PROPERTY
    ON GRADE PATH
    OVERHEAD PATH
    OVERHEAD PATH + EASEMENT
    OVERHEAD OR EASEMENT
    LINKAGES TO EXISTING
    PUBLIC & PRIVATE LAND OWNERSHIP
  • 7. SCENARIO 1: Broadway District Trail Loop
  • 8. SCENARIO 2: Farview Park & Lowry Trail Loop
  • 9. SCENARIO 3:Trails link Scherer Park and Green Port
  • 10. MPLS Existing Plan
  • 11. PHASE 1: RIVERFIRST Trail Loop & Projects
  • 12. PHASE 2: RIVERFIRST Trail Loop & Projects
  • 13. BRIDGES
    Hawthorne Bridge, Bridge Festival, Portland, OR
  • 14. BRIDGES
    Marsupial Bridge , Milwaukee, WI La & Dallman
  • 15. BRIDGES
    Marsupial Bridge, Milwaukee  
  • 16. BRIDGES
    Lake Place Park Overpass, Duluth, MN
     
  • 17. BRIDGES
    Seneca Freeway Park, Seattle, WA
  • 18. INDUSTRIAL TRANSFORMATIONS
    Warehouse Conversion, Basel ZMIK  
  • 19. INDUSTRIAL TRANSFORMATIONS
    Roof top farming, Brooklyn  
  • 20. Green roof , Eagle St & Newton St Farms NYC  
  • 21. INDUSTRIALTRANSFORMATIONS
    Greenroof installation, Habitat for Humanity  
  • 22. LOW COST INFRASTRUCTURE
    Bike Lane, Low Cost Infrastructure
     
  • 23. Painted Bike Trail  
  • 24. American River Bike Trail, Sacramento, CA
  • 25. Sea Salt Resaturant, Lake Calhoun  
  • 26. River Elevated Trail, Portland , OR  
  • 27. ZERO ENERGY LIGHTING
    MPLS Firefly  
  • 28. ZERO ENERGY LIGHTING
    Luminous Road markers
  • 29. GREEN CONNECTOR STREETS
    Bicycle Path, Copenhagen, Denmark
  • 30. RIVER ENERGY
    MudWatt Microbial Energy & solar road study
  • 31. GREEN CONNECTOR STREETS
    Cobble and Unit Paving
  • 32. GREEN CONNECTOR STREETS
    Bio Garden, 12th Avenue, Portland, OR
  • 33.
  • 34. WATER CONNECTIONS
    Kayak Trip, South Lake Tahoe, CA
  • 35. WATER CONNECTIONS
    Kayak, American River, Sacramento, CA
  • 36. WATER CONNECTIONS
    Platte River, Nebraska Bluffs, NE
  • 37. LOWRY BRIDGE INFO
    PLYMOUTH & BROADWAY BRIDGE
    FARVIEW OVERPASS
    PORT PROGRAM?
    RAILROAD NEGOCIATIONS
    INDUSTRY STAKEHOLDERS
  • 38. PHASE 1: RIVERFIRST Trail Loop & Projects
  • 39. RIVERFIRST Proposal Plan

×