R1 Steering Committee 2012 10-11
Upcoming SlideShare
Loading in...5
×
 

R1 Steering Committee 2012 10-11

on

  • 382 views

TLS/KVA presentation to RiverFirst Steering Committee on team composition, schedule and deliverables for schematic design and feasibility.

TLS/KVA presentation to RiverFirst Steering Committee on team composition, schedule and deliverables for schematic design and feasibility.

Statistics

Views

Total Views
382
Views on SlideShare
350
Embed Views
32

Actions

Likes
0
Downloads
4
Comments
0

1 Embed 32

http://riverfirst.com 32

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

R1 Steering Committee 2012 10-11 R1 Steering Committee 2012 10-11 Presentation Transcript

  • RiverFirst Steering Committee, October 11, 2012Scope Areas
  • RiverFirst Steering Committee, October 11, 2012Team
  • RiverFirst Steering Committee, October 11, 2012Meeting Schedule
  • RiverFirst Steering Committee, October 11, 2012Deliverables
  • RiverFirst Steering Committee, October 11, 2012
  • RiverFirst Steering Committee, October 11, 2012