R1 Steering Committee 2012 10-11

446 views
401 views

Published on

TLS/KVA presentation to RiverFirst Steering Committee on team composition, schedule and deliverables for schematic design and feasibility.

Published in: Education
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
446
On SlideShare
0
From Embeds
0
Number of Embeds
38
Actions
Shares
0
Downloads
7
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

R1 Steering Committee 2012 10-11

  1. 1. RiverFirst Steering Committee, October 11, 2012Scope Areas
  2. 2. RiverFirst Steering Committee, October 11, 2012Team
  3. 3. RiverFirst Steering Committee, October 11, 2012Meeting Schedule
  4. 4. RiverFirst Steering Committee, October 11, 2012Deliverables
  5. 5. RiverFirst Steering Committee, October 11, 2012
  6. 6. RiverFirst Steering Committee, October 11, 2012

×