RiverFirst Steering Committee, October 11, 2012Scope Areas
RiverFirst Steering Committee, October 11, 2012Team
RiverFirst Steering Committee, October 11, 2012Meeting Schedule
RiverFirst Steering Committee, October 11, 2012Deliverables
RiverFirst Steering Committee, October 11, 2012
RiverFirst Steering Committee, October 11, 2012
R1 Steering Committee 2012 10-11
Upcoming SlideShare
Loading in...5
×

R1 Steering Committee 2012 10-11

262

Published on

TLS/KVA presentation to RiverFirst Steering Committee on team composition, schedule and deliverables for schematic design and feasibility.

Published in: Education
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
262
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
4
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "R1 Steering Committee 2012 10-11"

  1. 1. RiverFirst Steering Committee, October 11, 2012Scope Areas
  2. 2. RiverFirst Steering Committee, October 11, 2012Team
  3. 3. RiverFirst Steering Committee, October 11, 2012Meeting Schedule
  4. 4. RiverFirst Steering Committee, October 11, 2012Deliverables
  5. 5. RiverFirst Steering Committee, October 11, 2012
  6. 6. RiverFirst Steering Committee, October 11, 2012
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×