Your SlideShare is downloading. ×
RiverFIRST June 21-22, 2011 presentation of possible projects
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

RiverFIRST June 21-22, 2011 presentation of possible projects

801

Published on

Design team TLS/KVA prepared a substantial review and explanation of possible priority sites in the Mpls Riverfront Development Initiative. This presentation contains many new images of their proposed …

Design team TLS/KVA prepared a substantial review and explanation of possible priority sites in the Mpls Riverfront Development Initiative. This presentation contains many new images of their proposed design work.

Published in: Technology, News & Politics
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
801
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
23
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. RIVERFIRST 21 st Century Riverfront Design Proposal STEERING COMMITEE MEETING 22 JUNE 2011 Minneapolis, MN [email_address] [email_address] fviolich@kvarch.net KVA/TLS Team    
  • 2. 20 Year Master Plan 0-5 Year Master Plan
  • 3. Existing Aerial View, Scherer Park
  • 4. Scherer Park 20 Year Plan
  • 5. Scherer Park 0-5 Year Plan
  • 6. Proposed Plan Scherer Park
  • 7. High Water Plan Scherer Park
  • 8. 100 Year Flood Plan Scherer Park
  • 9. Scherer Park Historic Aerial View
  • 10. Scherer Park Eye View
  • 11. Scherer Park River View
  • 12. Scherer Park Mixed Use Precedents  
  • 13. Scherer Park Aerial  
  • 14.   Plymouth Bridge Pedestrian/Bike Bridge  
  • 15. Broadway Bridge Pedestrian/Bike Bridge  
  • 16. Bio-Haven Sections & Plans  
  • 17. Bio-Haven Cross Section Study  
  • 18. Existing Aerial Farview Connector Sector or
  • 19. Farview Park 20 Year Plan
  • 20. Farview Park 0-5 Year Plan
  • 21. Farview Historic Map 28 27 26
  • 22. Farview Connector Sector Aerial  
  • 23. Farview Urban Agriculture 27 th Ave  
  • 24. Farview Extension Eye View
  • 25. Farview Urban Boat Builders River View  
  • 26. Lowry Bridge Connector  
  • 27. Lowry Bridge Connector  
  • 28. River Talk iPhone App  
  • 29. East Side  
  • 30. River Talk iPhone App  
  • 31. River Talk iPhone App  
  • 32. River Talk iPhone App  
  • 33. River Talk iPhone App  
  • 34. River Talk iPhone App  
  • 35. River Talk iPhone App  
  • 36. Existing Aerial Port
  • 37. Green Port 20 Year Plan
  • 38. Green Port 0-5 Year Plan
  • 39. Wetlands Aerial
  • 40. Wetlands River View
  • 41. Green Port Eye View
  • 42. Wetlands River View
  • 43. Wetlands Soft Structure
  • 44. Wetlands Island berm section studies
  • 45. Wetlands & Green Port: Plan
  • 46. Wetland & Greenport Plan Wetlands & Green Port: Low Water
  • 47. Wetlands & Green Port: Median water
  • 48. Wetlands & Green Port: High Water
  • 49. Wetlands & Green Port: 100 Year Flood

×