Your SlideShare is downloading. ×
Industrial training presentation
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Saving this for later?

Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime - even offline.

Text the download link to your phone

Standard text messaging rates apply

Industrial training presentation

4,272
views

Published on

Slide for my presentation during internship program at Propel Network Sdn Bhd.

Slide for my presentation during internship program at Propel Network Sdn Bhd.

Published in: Education, Technology, Business

0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
4,272
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
88
Comments
0
Likes
1
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1.  Located in Kota Kemuning, Shah Alam. Established in year of 2009. Founder of this company is Mr. Leong WM. Contain 3 department ; optimization team, site engineer, and rigger department. Sub company for YTL and SAMSUNG.
  • 2.  being part of the conventional 2G and 3G RF network optimization Sub company for SAMSUNG and YTL. experience in network optimization of 2G, 3G, and 4G technologies like WiMax and LTE, as well as having optimized the world first mobile VOIP network. collaborating with renown brands like Accuver, which has developed the world first WiMax RF measurement tools i.e. XCAL-X, XCAP-X.
  • 3.  Assigned into several project: SSV (single Site Verification) Cluster Drive KPI test Benchmarking (for 3G maxis) Assist RiggerHost supervisor : Ryan Gan (Project Manager Propel Network)Site Supervisor : Kenneth Foo C.Y. (Telecommunication Engineer)
  • 4.  Doing SSV test, troubleshoot and attempt to solve the problem if possible. Cluster drive for optimization process. Help other engineer with troubleshooting and office work. Assist rigger with give them all database needed for site audit and tuning. Provide an option of solution according to the problem and requirement.
  • 5.  Cluster = area contain 15-20 antennas.
  • 6. 1. Time Shall be conducted on normal working day from 9am-7pm.2. Speed The speed limit shall be constantly maintain at 70km/h.3. Test measurement tool Shall be done using specified tools.
  • 7.  Work done:1. Site audit2. Site tuning3. Measure tower’s height
  • 8.  Azimuth Angular measurement in a spherical coordinate system. Tilt To cause to slope by raising or lowering the antenna.
  • 9.  Work environment Job scope Engineer responsibility Communication skills Social skills Time management Decision making Think creatively
  • 10.  Industrial training has exposed the student for real working environment as an engineer. Industrial training has developed/improved student creative and critical thinking as well as problem solving ability. Industrial training has exposed student with not only engineering related of works, but also management of works.