Mutooroo Magnetite Project
      Inferred Resource Estimate of the
   Muster Dam Magnetite Fe Deposit
                2nd December 2011
         Andrew Burtt, Project Geologist
    8th SA Exploration and Mining Conference
                   Adelaide, SA
Maiden JORC Inferred Resource
 1.5 Billion Tonnes @ 15.2% DTR and 18.02% Fe (Head)
                     at   10% DTR cut-off
                               with
          228 Mt of contained magnetite concentrate


Concentrate Grade
Fe    69.8%
Al2O3 0.4%
P2O5 0.002%
S     0.002%
SiO2  2.8%
LOI   -3.3%
Location
Braemar Ironstones
Regional TMI
Heli-magnetics
                           Area 2
Area 1




                                      Area 3


         3,497 line kilometres with flight line
         spacing of 50m and terrain
         clearance of 25m
Muster Dam Magnetic Anomaly
Outcropping steeply east dipping, magnetite-
bearing diamictite and siltstone
Magnetic Modelling


 Muster Dam TMI
   Anomaly -
  3D magnetic
modelling by MIRA
  Geoscience
Magnetic Modelling


Muster Dam TMI
   Anomaly -
  3D magnetic
  inversion by
MIRA Geoscience
Magnetic Modelling
                3D Inversion of Muster
                    Dam anomaly -
                    0.4 SI Magnetic
                     Susceptibility
                      iso surface
2D Forward Modelling
15 Sections Modelled




                                     Section:
                                     MDN001
          Section:
          MDN001




                   Section: MDN001
Planned Resource Drillholes


36 planned RC
 drillholes for
            Section:
 10,600m on
            MDN001
400m sections
 150m apart
Resource Drilling
              49 x RC drillholes for 13,031m
            10 x Diamond drillholes for 2,883m




Section:
             Diamictite
MDN001




             Siltstone
Resource Drilling
   Excellent correlation between modelled and drilling




Section:
MDN001




                 Section MDN001
Resource Drilling
   Excellent correlation between modelled and drilling




Section:
MDN001




                    Section MDN001
Davis Tube Recovery (DTR)
2,355    5m RC composite samples for DTR/XRF at 45µm grind size
558      5m ¼ core samples for DTR/XRF at 45µm grind size
Magnetite concentrate sample recovered (DTR)   Head sample input (20g)




DTR or Mass Recovery
= Wt Mag(g) / Wt Head(g)
QA/QC
Created our own Standard as there are no commercially available magnetite Fe standards


                                                                                                                                                          STD: STD1
          Mutooroo Magnetite Project                                              25
                  Resource Drilling Standards                                     24
         25                                                                       23
                                                                                  22




                                                                        DTR (%)
         20                                                                       21
                                                                                  20
         15
  DTR%




                                                                                  19
                                                Standard 1 (High DTR)
                                                                                  18
         10
                                                                                  17
                                                Standard 2 (Moderate
          5                                     DTR)                              16
                                                                                  15
                                                                                       553920
                                                                                                554140
                                                                                                         554440
                                                                                                                  554620
                                                                                                                           554940
                                                                                                                                    555140
                                                                                                                                             555340
                                                                                                                                                      555620
                                                                                                                                                               555840
                                                                                                                                                                        558120
                                                                                                                                                                                 556540
                                                                                                                                                                                          556740
                                                                                                                                                                                                   556440
                                                                                                                                                                                                            557020
                                                                                                                                                                                                                     557120
                                                                                                                                                                                                                              558240
                                                                                                                                                                                                                                       558420
                                                                                                                                                                                                                                                124040
                                                                                                                                                                                                                                                         558720
                                                                                                                                                                                                                                                                  551540
          0
              0       10        20      30
                        Fe% head                                                                                                                                  Sample ID
QA/QC
13 – 18% QA/QC samples including
standards, blanks, field duplicates and lab check samples

                                                                                        Field Duplicates
                                                                                             DTR%
                                                                        40
                                                                        35




                                                Duplicate Sample DTR%
                                                                        30
                                                                        25
                                                                        20
                                                                        15
                                                                        10
                                                                         5
                                                                         0
                                                                             0   10           20        30   40
                                                                                      Alpha Sample DTR%
QA/QC
Diamond Drillholes
• Twin of RC holes to confirm RC is
  representative
• Confirm dip of sequence – Alpha-Beta
  measurements
• SG measurements

                MDD001 vs MD003 DTR
       45
       40
       35
       30
DTR%




       25
       20                                                  MDD001 DTR%
       15
       10                                                  MD003 DTR%
        5
        0
            0   50   100   150     200   250   300   350
                            Depth (m)
Resource Modelling
H&S Hellman & Schofield Pty Ltd
Independent review by Hellman & Schofield to produce
Inferred Resource:                                            1
• 2,913 x 5m DTR composites from drilling                         2
• 280 estimated from magsus using Conditional
  Expectation statistical technique

• Total of 3,193 x 5m composites used for resource
  estimation

• Due to curved nature of deposit 4 sub-domains modelled              3
• Unconstrained Ordinary Kriging used with 10% DTR
  cutoff and no top cut with a block size of 100 x 50 x 20m

• Av. density of 2.96 g/cm3 estimated from 2,357 x 5m
  downhole geophysics composites with density assigned                4
  to ore blocks

• Only Fresh Rock resource reported
Resource Modelling
H&S Model validation demonstrates that the block model honours the drill hole
composite grades
                                              Section Plot of DTR_Mag                                                                                            Plan Plot of DTR_Mag

                                           Northing slice: 6409100.0 +/- 50.0                                                                                      RL slice: 80.0 +/- 10.0

                                                                                                                    DTR_Mag Range                                                                                         DTR_Mag Range
        400
                                                                                                                          Point Data                                                                                            Point Data


                                                                                                                 0.00 - 6.00                                                                                           0.00 - 6.00


                                                                                                                 6.00 - 10.00                                                                                          6.00 - 10.00


                                                                                                                 10.00 - 14.00                                                                                         10.00 - 14.00

        300                                                                                                      14.00 - 18.00                                                                                         14.00 - 18.00
                                                                                                                   6411000
                                                                                                                 18.00 - 22.00                                                                                         18.00 - 22.00

                                                                                                                 22.00 - 10000.00                                                                                      22.00 - 10000.00




        200
                                                                                                                     DTR_Mag range                                                                                         DTR_Mag range

                                                                                                                     blocks this lay er only                                                                               blocks this lay er only


                                                                                                                   6410000 - 6.00
                                                                                                                       0.00                                                                                                   0.00 - 6.00


                                                                                                                        6.00 - 10.00                                                                                          6.00 - 10.00
        100
                                                                                                                        10.00 - 14.00                                                                                         10.00 - 14.00


                                                                                                                        14.00 - 18.00                                                                                         14.00 - 18.00
 Elev




                                                                                                         North




                                                                                                                        18.00 - 22.00                                                                                         18.00 - 22.00


                                                                                                                        22.00 - 10000.00
                                                                                                                                                                                                                              22.00 - 10000.00
          0
                                                                                                                   6409000 extents
                                                                                                                       model
                                                                                                                                                                                                                              model extents




                                                                                                    UNIVARIATE STATISTICS
                                                                                                                                                                                                               UNIVARIATE STATISTICS

        -100                                                                                            Mean: 12.74425
                                                                                                                                                                                                                   Mean: 12.74425




                                                                                                                                                                                             4
                                                                                                     Variance: 55.66199
                                                                                                                                                                                                                Variance: 55.66199

                                                                                                            CV: 0.58542
                                                                                                                                                                                                                      CV: 0.58542
                                                                                                            6408000
                                                                                                     Minimum: 0.00
                                                                                                                                                                                                                Minimum: 0.00

        -200                                                                                                Q1: 7.2500
                                                                                                                                                                                                                      Q1: 7.2500

                                                                                                      Median: 13.300
                                                                                                                                                                                                                  Median: 13.300

                                                                                                            Q3: 17.4800
                                                                                                                                                                                                                      Q3: 17.4800

                                                                                                    Maximum: 62.1900
                                                                                                                                                                                                               Maximum: 62.1900
        -300                                                                                        No. of Data: 3193
                                                                                                              6407000                                                                                          No. of Data: 3193
               489500   489600   489700   489800          489900         490000   490100   490200
                                                                                                                                               487000   488000            489000             490000   491000
                                                   East
                                                                                                                                                                   East
Resource Modelling
Muster Dam                          Concentrate Grades
             Billion   Magnetite    Fe%      Al2O3 %     P2O5 %    S%       SiO2 %     LOI %
Category     Tonnes     DTR %
Inferred       1.5       15.2       69.8      0.4        0.002     0.002     2.8       -3.3
             DTR Mag Cut Off %     BTonnes    DTR Mag Recovery %     Fe Head Grade %
                    6               1.60               14.84               17.96
                    8               1.58               14.93               18.02
                    10              1.51               15.18               18.20
                    12              1.36               15.64               18.57
                    14              1.02               16.47               19.17
                    16              0.54               17.74               20.01
                    18              0.18               19.38               20.77
Exploration Target
Target Area     No of Strike (km)       Thickness      Volume (Bill m3)    Tonnage (Bt)
                Bands                   (m)
Muster Dam        1       5.5 to 6.5      100 to 325      0.30 to 0.45        1.0 to 1.5
Muster Catch      2       1.7 to 2.3       80 to 150      0.03 to 0.06       0.05 to 0.15
Muster South      1       1.7 to 2.3       80 to 120      0.03 to 0.06       0.05 to 0.15
Duffield 1        1       3.0 to 3.5      100 to 300      0.09 to 0.13        1.0 to 1.5
Duffield 2        2       1.5 to 2.5       80 to 100      0.25 to 0.40        0.1 to 0.3
Surrender Dam     4       3.0 to 3.5      80 to 150       0.10 to 0.15        0.2 to 0.4
                Totals   16.4 to 20.6      80-325         0.80 to 1.25        2.4 to 4.0




                                                                          The term “Exploration Target” should not
                                                                          be misconstrued as an estimate of
                                                                          Mineral Resources and Reserves as
                                                                          defined in the JORC Code (2004), and
                                                                          the term has not been used in that
                                                                          context. The term is conceptual in nature
                                                                          and it is uncertain if further exploration
                                                                          will result in the determination of a
                                                                          Mineral Resource. Refer Clause 18 of
                                                                          the JORC Code (2004).
Future
 JORC statement directly
  comparable to that for
  CAP’s Hawson’s Project
  25km distant
   Grind optimisation &
    Scoping Study
    underway; for
    completion in February
    2012
   Measured resource at
    Muster Dam
   Inferred resource at
    Duffields
Acknowledgements
   Mutooroo Pastoral Company
   Sumitomo Metal and Mining Oceania
   Frank Walsh Drilling
   Macquarie Drilling
   ALS Laboratories
   AMDEL
   Hellman & Schofield
   Euro Exploration
   Minotaur personnel
   Adelaide University students
Disclaimer
This presentation has been prepared by the management of Minotaur Exploration Limited (ASX: MEP) for the general benefit of
analysts, brokers and investors and does not constitute specific advice to any particular party or persons. Information herein is
based on publicly available information, internally developed data and other sources. Where an opinion, projection or forward
looking statement is expressed in this presentation, it is based on the assumptions and limitations mentioned herein and is an
expression of present opinion only. No warranties or representations are made or implied as to origin, validity, accuracy,
completeness, currency or reliability of the information. MEP specifically disclaims and excludes all liability (to the extent permitted
by law) for losses, claims, damages, demands, costs and expenses of whatever nature arising in any way out of or in connection
with the information, its accuracy, completeness or by reason of reliance by any person on any of it. Where MEP expresses or
implies an expectation or belief as to the success of future exploration and the economic viability of future project evaluations,
such expectation or belief is expressed in good faith and is believed to have a reasonable basis. However, such projected
outcomes are subject to risks, uncertainties and other factors which could cause actual results to differ materially from projected
future results. Such risks include, but are not limited to, exploration success, metal price volatility, changes to current mineral
resource estimates or targets, changes to assumptions for capital and operating costs as well as political and operational risks and
government regulatory outcomes. MEP disclaims any obligation to advise any person if it becomes aware of any inaccuracy in or
omission from any forecast or to update such forecast.



Competent Person’s Statement
Information in the foregoing presentation that relates to Exploration Results, Mineral Resources or Ore Reserves is
based on information compiled by Dr A. P. Belperio, who is a Director and full-time employee of the Company and a
Fellow of the Australasian Institute of Mining and Metallurgy. Dr A. P. Belperio has a minimum of 5 years experience,
which is relevant to the style of mineralisation and type of deposit under consideration and to the activity that he is
undertaking, to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves”. Dr A. P. Belperio consents to inclusion in the presentation
of matters based on his information in the form and context in which it appears.

More Related Content

Viewers also liked

A Clubwww1 Tip
A Clubwww1   TipA Clubwww1   Tip
A Clubwww1 TipClubwww1
 
AIESEC mozilla
AIESEC mozillaAIESEC mozilla
AIESEC mozillagmitrev
 
Clubwww1 Training - Session 5
Clubwww1   Training - Session 5Clubwww1   Training - Session 5
Clubwww1 Training - Session 5Clubwww1
 
The Artemis Cu-Au Deposit by A.P.Belperio
The Artemis Cu-Au Deposit by A.P.BelperioThe Artemis Cu-Au Deposit by A.P.Belperio
The Artemis Cu-Au Deposit by A.P.BelperioMinotaur Exploration
 

Viewers also liked (7)

MediaMind Overview June 2010
MediaMind Overview June 2010MediaMind Overview June 2010
MediaMind Overview June 2010
 
A Clubwww1 Tip
A Clubwww1   TipA Clubwww1   Tip
A Clubwww1 Tip
 
AIESEC mozilla
AIESEC mozillaAIESEC mozilla
AIESEC mozilla
 
Steller it business
Steller it businessSteller it business
Steller it business
 
ECCS 2010
ECCS 2010ECCS 2010
ECCS 2010
 
Clubwww1 Training - Session 5
Clubwww1   Training - Session 5Clubwww1   Training - Session 5
Clubwww1 Training - Session 5
 
The Artemis Cu-Au Deposit by A.P.Belperio
The Artemis Cu-Au Deposit by A.P.BelperioThe Artemis Cu-Au Deposit by A.P.Belperio
The Artemis Cu-Au Deposit by A.P.Belperio
 

More from Minotaur Exploration

Minotaur 5 dec14_sa expl mining conf
Minotaur 5 dec14_sa expl mining confMinotaur 5 dec14_sa expl mining conf
Minotaur 5 dec14_sa expl mining confMinotaur Exploration
 
The Artemis Cu-Au Deposit Presentation given by A. P. Belperio
The Artemis Cu-Au Deposit  Presentation given by A. P. BelperioThe Artemis Cu-Au Deposit  Presentation given by A. P. Belperio
The Artemis Cu-Au Deposit Presentation given by A. P. BelperioMinotaur Exploration
 
Managing Director Presents at Proactive Investors' Investor Luncheons
Managing Director Presents at Proactive Investors' Investor LuncheonsManaging Director Presents at Proactive Investors' Investor Luncheons
Managing Director Presents at Proactive Investors' Investor LuncheonsMinotaur Exploration
 
Presentation given by Managing Director Andrew Woskett at Qld Exploration Cou...
Presentation given by Managing Director Andrew Woskett at Qld Exploration Cou...Presentation given by Managing Director Andrew Woskett at Qld Exploration Cou...
Presentation given by Managing Director Andrew Woskett at Qld Exploration Cou...Minotaur Exploration
 
Presentation Given By Managing Director Andrew Woskett At The Symposium Broke...
Presentation Given By Managing Director Andrew Woskett At The Symposium Broke...Presentation Given By Managing Director Andrew Woskett At The Symposium Broke...
Presentation Given By Managing Director Andrew Woskett At The Symposium Broke...Minotaur Exploration
 
Managing Director 2013 AGM Presentation
Managing Director 2013 AGM PresentationManaging Director 2013 AGM Presentation
Managing Director 2013 AGM PresentationMinotaur Exploration
 
Mines & Money Melbourne 2013 Presentation
Mines & Money Melbourne 2013 PresentationMines & Money Melbourne 2013 Presentation
Mines & Money Melbourne 2013 PresentationMinotaur Exploration
 
Mep creating discovery opportunities aug13
Mep creating discovery opportunities aug13Mep creating discovery opportunities aug13
Mep creating discovery opportunities aug13Minotaur Exploration
 
Andrew Woskett Presentation at 20:20 Resources Investor Series in Sydney
Andrew Woskett Presentation at 20:20 Resources Investor Series in SydneyAndrew Woskett Presentation at 20:20 Resources Investor Series in Sydney
Andrew Woskett Presentation at 20:20 Resources Investor Series in SydneyMinotaur Exploration
 
Presentation given by Managing Director, Andrew Woskett at South Australia Re...
Presentation given by Managing Director, Andrew Woskett at South Australia Re...Presentation given by Managing Director, Andrew Woskett at South Australia Re...
Presentation given by Managing Director, Andrew Woskett at South Australia Re...Minotaur Exploration
 
Managing Directors Presentation 2012 AGM
Managing Directors Presentation 2012 AGMManaging Directors Presentation 2012 AGM
Managing Directors Presentation 2012 AGMMinotaur Exploration
 
Dr Tony Belperio's presentation at The Mining 2012 Resources Convention
Dr Tony Belperio's presentation at The Mining 2012 Resources ConventionDr Tony Belperio's presentation at The Mining 2012 Resources Convention
Dr Tony Belperio's presentation at The Mining 2012 Resources ConventionMinotaur Exploration
 
Mutooroo Magnetite Project Update October 2012
Mutooroo Magnetite Project Update October 2012Mutooroo Magnetite Project Update October 2012
Mutooroo Magnetite Project Update October 2012Minotaur Exploration
 
MEP AMEC presentation 14 july 2012
MEP AMEC presentation 14 july 2012MEP AMEC presentation 14 july 2012
MEP AMEC presentation 14 july 2012Minotaur Exploration
 
Australia china resources symposium andrew woskett_chinese version_july12
Australia china resources symposium andrew woskett_chinese version_july12Australia china resources symposium andrew woskett_chinese version_july12
Australia china resources symposium andrew woskett_chinese version_july12Minotaur Exploration
 
Australia China Resources Symposium Adelaide
Australia China Resources Symposium AdelaideAustralia China Resources Symposium Adelaide
Australia China Resources Symposium AdelaideMinotaur Exploration
 
Andrew Woskett Presentation to 2012 Broken Hill Symposium
Andrew Woskett Presentation to 2012 Broken Hill SymposiumAndrew Woskett Presentation to 2012 Broken Hill Symposium
Andrew Woskett Presentation to 2012 Broken Hill SymposiumMinotaur Exploration
 
Managing Directors Presentation 2011 AGM
Managing Directors Presentation 2011 AGMManaging Directors Presentation 2011 AGM
Managing Directors Presentation 2011 AGMMinotaur Exploration
 

More from Minotaur Exploration (20)

Minotaur 5 dec14_sa expl mining conf
Minotaur 5 dec14_sa expl mining confMinotaur 5 dec14_sa expl mining conf
Minotaur 5 dec14_sa expl mining conf
 
The Artemis Cu-Au Deposit Presentation given by A. P. Belperio
The Artemis Cu-Au Deposit  Presentation given by A. P. BelperioThe Artemis Cu-Au Deposit  Presentation given by A. P. Belperio
The Artemis Cu-Au Deposit Presentation given by A. P. Belperio
 
MEP investment-case 20 Sep 2014
MEP investment-case 20 Sep 2014MEP investment-case 20 Sep 2014
MEP investment-case 20 Sep 2014
 
Managing Director Presents at Proactive Investors' Investor Luncheons
Managing Director Presents at Proactive Investors' Investor LuncheonsManaging Director Presents at Proactive Investors' Investor Luncheons
Managing Director Presents at Proactive Investors' Investor Luncheons
 
Presentation given by Managing Director Andrew Woskett at Qld Exploration Cou...
Presentation given by Managing Director Andrew Woskett at Qld Exploration Cou...Presentation given by Managing Director Andrew Woskett at Qld Exploration Cou...
Presentation given by Managing Director Andrew Woskett at Qld Exploration Cou...
 
Presentation Given By Managing Director Andrew Woskett At The Symposium Broke...
Presentation Given By Managing Director Andrew Woskett At The Symposium Broke...Presentation Given By Managing Director Andrew Woskett At The Symposium Broke...
Presentation Given By Managing Director Andrew Woskett At The Symposium Broke...
 
Managing Director 2013 AGM Presentation
Managing Director 2013 AGM PresentationManaging Director 2013 AGM Presentation
Managing Director 2013 AGM Presentation
 
20:20 Resources Investor Series
20:20 Resources Investor Series20:20 Resources Investor Series
20:20 Resources Investor Series
 
Mines & Money Melbourne 2013 Presentation
Mines & Money Melbourne 2013 PresentationMines & Money Melbourne 2013 Presentation
Mines & Money Melbourne 2013 Presentation
 
Mep creating discovery opportunities aug13
Mep creating discovery opportunities aug13Mep creating discovery opportunities aug13
Mep creating discovery opportunities aug13
 
Andrew Woskett Presentation at 20:20 Resources Investor Series in Sydney
Andrew Woskett Presentation at 20:20 Resources Investor Series in SydneyAndrew Woskett Presentation at 20:20 Resources Investor Series in Sydney
Andrew Woskett Presentation at 20:20 Resources Investor Series in Sydney
 
Presentation given by Managing Director, Andrew Woskett at South Australia Re...
Presentation given by Managing Director, Andrew Woskett at South Australia Re...Presentation given by Managing Director, Andrew Woskett at South Australia Re...
Presentation given by Managing Director, Andrew Woskett at South Australia Re...
 
Managing Directors Presentation 2012 AGM
Managing Directors Presentation 2012 AGMManaging Directors Presentation 2012 AGM
Managing Directors Presentation 2012 AGM
 
Dr Tony Belperio's presentation at The Mining 2012 Resources Convention
Dr Tony Belperio's presentation at The Mining 2012 Resources ConventionDr Tony Belperio's presentation at The Mining 2012 Resources Convention
Dr Tony Belperio's presentation at The Mining 2012 Resources Convention
 
Mutooroo Magnetite Project Update October 2012
Mutooroo Magnetite Project Update October 2012Mutooroo Magnetite Project Update October 2012
Mutooroo Magnetite Project Update October 2012
 
MEP AMEC presentation 14 july 2012
MEP AMEC presentation 14 july 2012MEP AMEC presentation 14 july 2012
MEP AMEC presentation 14 july 2012
 
Australia china resources symposium andrew woskett_chinese version_july12
Australia china resources symposium andrew woskett_chinese version_july12Australia china resources symposium andrew woskett_chinese version_july12
Australia china resources symposium andrew woskett_chinese version_july12
 
Australia China Resources Symposium Adelaide
Australia China Resources Symposium AdelaideAustralia China Resources Symposium Adelaide
Australia China Resources Symposium Adelaide
 
Andrew Woskett Presentation to 2012 Broken Hill Symposium
Andrew Woskett Presentation to 2012 Broken Hill SymposiumAndrew Woskett Presentation to 2012 Broken Hill Symposium
Andrew Woskett Presentation to 2012 Broken Hill Symposium
 
Managing Directors Presentation 2011 AGM
Managing Directors Presentation 2011 AGMManaging Directors Presentation 2011 AGM
Managing Directors Presentation 2011 AGM
 

Recently uploaded

Falcon Invoice Discounting unlock your cash flow potential
Falcon Invoice Discounting unlock your cash flow potentialFalcon Invoice Discounting unlock your cash flow potential
Falcon Invoice Discounting unlock your cash flow potentialFalcon Invoice Discounting
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024CollectiveMining1
 
Mandalay Resources 2024 April IR Presentation
Mandalay Resources 2024 April IR PresentationMandalay Resources 2024 April IR Presentation
Mandalay Resources 2024 April IR PresentationMandalayResources
 
Q1 Probe Gold Quarterly Update- April 2024
Q1 Probe Gold Quarterly Update- April 2024Q1 Probe Gold Quarterly Update- April 2024
Q1 Probe Gold Quarterly Update- April 2024Probe Gold
 
Osisko Gold Royalties Ltd - Corporate Presentation, April 10, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 10, 2024Osisko Gold Royalties Ltd - Corporate Presentation, April 10, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 10, 2024Osisko Gold Royalties Ltd
 
Collective Mining | Corporate Presentation | April 2024
Collective Mining | Corporate Presentation | April 2024Collective Mining | Corporate Presentation | April 2024
Collective Mining | Corporate Presentation | April 2024CollectiveMining1
 
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...USDAReapgrants.com
 

Recently uploaded (8)

Falcon Invoice Discounting unlock your cash flow potential
Falcon Invoice Discounting unlock your cash flow potentialFalcon Invoice Discounting unlock your cash flow potential
Falcon Invoice Discounting unlock your cash flow potential
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
Mandalay Resources 2024 April IR Presentation
Mandalay Resources 2024 April IR PresentationMandalay Resources 2024 April IR Presentation
Mandalay Resources 2024 April IR Presentation
 
Q1 Probe Gold Quarterly Update- April 2024
Q1 Probe Gold Quarterly Update- April 2024Q1 Probe Gold Quarterly Update- April 2024
Q1 Probe Gold Quarterly Update- April 2024
 
Osisko Gold Royalties Ltd - Corporate Presentation, April 10, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 10, 2024Osisko Gold Royalties Ltd - Corporate Presentation, April 10, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 10, 2024
 
Collective Mining | Corporate Presentation | April 2024
Collective Mining | Corporate Presentation | April 2024Collective Mining | Corporate Presentation | April 2024
Collective Mining | Corporate Presentation | April 2024
 
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
 
Korea District Heating Corporation 071320 Algorithm Investment Report
Korea District Heating Corporation 071320 Algorithm Investment ReportKorea District Heating Corporation 071320 Algorithm Investment Report
Korea District Heating Corporation 071320 Algorithm Investment Report
 

Sa explorers &_mining_conference_2011_muster_dam_inferred_resource

  • 1. Mutooroo Magnetite Project Inferred Resource Estimate of the Muster Dam Magnetite Fe Deposit 2nd December 2011 Andrew Burtt, Project Geologist 8th SA Exploration and Mining Conference Adelaide, SA
  • 2. Maiden JORC Inferred Resource 1.5 Billion Tonnes @ 15.2% DTR and 18.02% Fe (Head) at 10% DTR cut-off with 228 Mt of contained magnetite concentrate Concentrate Grade Fe 69.8% Al2O3 0.4% P2O5 0.002% S 0.002% SiO2 2.8% LOI -3.3%
  • 6. Heli-magnetics Area 2 Area 1 Area 3 3,497 line kilometres with flight line spacing of 50m and terrain clearance of 25m
  • 7. Muster Dam Magnetic Anomaly Outcropping steeply east dipping, magnetite- bearing diamictite and siltstone
  • 8. Magnetic Modelling Muster Dam TMI Anomaly - 3D magnetic modelling by MIRA Geoscience
  • 9. Magnetic Modelling Muster Dam TMI Anomaly - 3D magnetic inversion by MIRA Geoscience
  • 10. Magnetic Modelling 3D Inversion of Muster Dam anomaly - 0.4 SI Magnetic Susceptibility iso surface
  • 11. 2D Forward Modelling 15 Sections Modelled Section: MDN001 Section: MDN001 Section: MDN001
  • 12. Planned Resource Drillholes 36 planned RC drillholes for Section: 10,600m on MDN001 400m sections 150m apart
  • 13. Resource Drilling 49 x RC drillholes for 13,031m 10 x Diamond drillholes for 2,883m Section: Diamictite MDN001 Siltstone
  • 14. Resource Drilling Excellent correlation between modelled and drilling Section: MDN001 Section MDN001
  • 15. Resource Drilling Excellent correlation between modelled and drilling Section: MDN001 Section MDN001
  • 16. Davis Tube Recovery (DTR) 2,355 5m RC composite samples for DTR/XRF at 45µm grind size 558 5m ¼ core samples for DTR/XRF at 45µm grind size Magnetite concentrate sample recovered (DTR) Head sample input (20g) DTR or Mass Recovery = Wt Mag(g) / Wt Head(g)
  • 17. QA/QC Created our own Standard as there are no commercially available magnetite Fe standards STD: STD1 Mutooroo Magnetite Project 25 Resource Drilling Standards 24 25 23 22 DTR (%) 20 21 20 15 DTR% 19 Standard 1 (High DTR) 18 10 17 Standard 2 (Moderate 5 DTR) 16 15 553920 554140 554440 554620 554940 555140 555340 555620 555840 558120 556540 556740 556440 557020 557120 558240 558420 124040 558720 551540 0 0 10 20 30 Fe% head Sample ID
  • 18. QA/QC 13 – 18% QA/QC samples including standards, blanks, field duplicates and lab check samples Field Duplicates DTR% 40 35 Duplicate Sample DTR% 30 25 20 15 10 5 0 0 10 20 30 40 Alpha Sample DTR%
  • 19. QA/QC Diamond Drillholes • Twin of RC holes to confirm RC is representative • Confirm dip of sequence – Alpha-Beta measurements • SG measurements MDD001 vs MD003 DTR 45 40 35 30 DTR% 25 20 MDD001 DTR% 15 10 MD003 DTR% 5 0 0 50 100 150 200 250 300 350 Depth (m)
  • 20. Resource Modelling H&S Hellman & Schofield Pty Ltd Independent review by Hellman & Schofield to produce Inferred Resource: 1 • 2,913 x 5m DTR composites from drilling 2 • 280 estimated from magsus using Conditional Expectation statistical technique • Total of 3,193 x 5m composites used for resource estimation • Due to curved nature of deposit 4 sub-domains modelled 3 • Unconstrained Ordinary Kriging used with 10% DTR cutoff and no top cut with a block size of 100 x 50 x 20m • Av. density of 2.96 g/cm3 estimated from 2,357 x 5m downhole geophysics composites with density assigned 4 to ore blocks • Only Fresh Rock resource reported
  • 21. Resource Modelling H&S Model validation demonstrates that the block model honours the drill hole composite grades Section Plot of DTR_Mag Plan Plot of DTR_Mag Northing slice: 6409100.0 +/- 50.0 RL slice: 80.0 +/- 10.0 DTR_Mag Range DTR_Mag Range 400 Point Data Point Data 0.00 - 6.00 0.00 - 6.00 6.00 - 10.00 6.00 - 10.00 10.00 - 14.00 10.00 - 14.00 300 14.00 - 18.00 14.00 - 18.00 6411000 18.00 - 22.00 18.00 - 22.00 22.00 - 10000.00 22.00 - 10000.00 200 DTR_Mag range DTR_Mag range blocks this lay er only blocks this lay er only 6410000 - 6.00 0.00 0.00 - 6.00 6.00 - 10.00 6.00 - 10.00 100 10.00 - 14.00 10.00 - 14.00 14.00 - 18.00 14.00 - 18.00 Elev North 18.00 - 22.00 18.00 - 22.00 22.00 - 10000.00 22.00 - 10000.00 0 6409000 extents model model extents UNIVARIATE STATISTICS UNIVARIATE STATISTICS -100 Mean: 12.74425 Mean: 12.74425 4 Variance: 55.66199 Variance: 55.66199 CV: 0.58542 CV: 0.58542 6408000 Minimum: 0.00 Minimum: 0.00 -200 Q1: 7.2500 Q1: 7.2500 Median: 13.300 Median: 13.300 Q3: 17.4800 Q3: 17.4800 Maximum: 62.1900 Maximum: 62.1900 -300 No. of Data: 3193 6407000 No. of Data: 3193 489500 489600 489700 489800 489900 490000 490100 490200 487000 488000 489000 490000 491000 East East
  • 22. Resource Modelling Muster Dam Concentrate Grades Billion Magnetite Fe% Al2O3 % P2O5 % S% SiO2 % LOI % Category Tonnes DTR % Inferred 1.5 15.2 69.8 0.4 0.002 0.002 2.8 -3.3 DTR Mag Cut Off % BTonnes DTR Mag Recovery % Fe Head Grade % 6 1.60 14.84 17.96 8 1.58 14.93 18.02 10 1.51 15.18 18.20 12 1.36 15.64 18.57 14 1.02 16.47 19.17 16 0.54 17.74 20.01 18 0.18 19.38 20.77
  • 23. Exploration Target Target Area No of Strike (km) Thickness Volume (Bill m3) Tonnage (Bt) Bands (m) Muster Dam 1 5.5 to 6.5 100 to 325 0.30 to 0.45 1.0 to 1.5 Muster Catch 2 1.7 to 2.3 80 to 150 0.03 to 0.06 0.05 to 0.15 Muster South 1 1.7 to 2.3 80 to 120 0.03 to 0.06 0.05 to 0.15 Duffield 1 1 3.0 to 3.5 100 to 300 0.09 to 0.13 1.0 to 1.5 Duffield 2 2 1.5 to 2.5 80 to 100 0.25 to 0.40 0.1 to 0.3 Surrender Dam 4 3.0 to 3.5 80 to 150 0.10 to 0.15 0.2 to 0.4 Totals 16.4 to 20.6 80-325 0.80 to 1.25 2.4 to 4.0 The term “Exploration Target” should not be misconstrued as an estimate of Mineral Resources and Reserves as defined in the JORC Code (2004), and the term has not been used in that context. The term is conceptual in nature and it is uncertain if further exploration will result in the determination of a Mineral Resource. Refer Clause 18 of the JORC Code (2004).
  • 24. Future  JORC statement directly comparable to that for CAP’s Hawson’s Project 25km distant  Grind optimisation & Scoping Study underway; for completion in February 2012  Measured resource at Muster Dam  Inferred resource at Duffields
  • 25. Acknowledgements  Mutooroo Pastoral Company  Sumitomo Metal and Mining Oceania  Frank Walsh Drilling  Macquarie Drilling  ALS Laboratories  AMDEL  Hellman & Schofield  Euro Exploration  Minotaur personnel  Adelaide University students
  • 26. Disclaimer This presentation has been prepared by the management of Minotaur Exploration Limited (ASX: MEP) for the general benefit of analysts, brokers and investors and does not constitute specific advice to any particular party or persons. Information herein is based on publicly available information, internally developed data and other sources. Where an opinion, projection or forward looking statement is expressed in this presentation, it is based on the assumptions and limitations mentioned herein and is an expression of present opinion only. No warranties or representations are made or implied as to origin, validity, accuracy, completeness, currency or reliability of the information. MEP specifically disclaims and excludes all liability (to the extent permitted by law) for losses, claims, damages, demands, costs and expenses of whatever nature arising in any way out of or in connection with the information, its accuracy, completeness or by reason of reliance by any person on any of it. Where MEP expresses or implies an expectation or belief as to the success of future exploration and the economic viability of future project evaluations, such expectation or belief is expressed in good faith and is believed to have a reasonable basis. However, such projected outcomes are subject to risks, uncertainties and other factors which could cause actual results to differ materially from projected future results. Such risks include, but are not limited to, exploration success, metal price volatility, changes to current mineral resource estimates or targets, changes to assumptions for capital and operating costs as well as political and operational risks and government regulatory outcomes. MEP disclaims any obligation to advise any person if it becomes aware of any inaccuracy in or omission from any forecast or to update such forecast. Competent Person’s Statement Information in the foregoing presentation that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Dr A. P. Belperio, who is a Director and full-time employee of the Company and a Fellow of the Australasian Institute of Mining and Metallurgy. Dr A. P. Belperio has a minimum of 5 years experience, which is relevant to the style of mineralisation and type of deposit under consideration and to the activity that he is undertaking, to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Dr A. P. Belperio consents to inclusion in the presentation of matters based on his information in the form and context in which it appears.