1. Data Driven Energy Audit Strategies
Bennett Fisher
Founder & CEO
bfisher@retroficiency.com
Phone: 202-744-4000
2. Even the experts agree – today’s audit process is
frustrating at best
Most Challenging Phase of Building Retrofit
Retrofit Projects Market Opportunity
(Survey of Auditors)
Non-Financial Execution
Challenges
$400B
Potential Projects
$60B
Realized Projects
Source: Pike Research
(c) 2012 Retroficiency, Inc. PRIVATE and CONFIDENTIAL 2
3. Organizations must answer these key questions to
achieve a positive energy assessment outcome
How many buildings
1 do I want to evaluate? Many One
2 What information do Energy Consumption Building Asset
I have available?
What resources are
3 appropriate given Manual Analytics Models
project scope?
What do I want the
4 outcome to be?
ECIs ECMs
(c) 2012 Retroficiency, Inc. PRIVATE and CONFIDENTIAL
3
4. Focus on the buildings that matter, and not those
that don’t
1 Distribution of Portfolio Savings Potential
Current Potential % of Savings Potential
Spending ($) Savings ($)
Building #1 $671,973 $250,626
Building #2 $939,946 $250,461
Building #3 $650,101 $220,326
Buildings
Building #4 $1,146,006 $205,087 #1-#6:
Building #5 $2,270,114 $104,701 75%
Building #6 $308,458 $61,706
Buildings
Building #7 $986,329 $59,251
Building #8 $225,025 $57,031
#7-#16:
Building #9 $418,305 $55,640
25%
Building #10 $421,414 $54,266
Building #11 $275,883 $38,989
Building #12 $334,848 $33,405
Building #13 $187,604 $28,243
Building #14 $2,743,762 $24,411
The top 6 of 17 buildings
Building #15 $112,285 $9,394 (35%) in the portfolio have
Building #16 $248,664 $0 75% of the savings potential.
Building #17 $217,591 $0
Total $12,158,308 $1,453,537
Note: Building sample set from single utility portfolio.
(c) 2012 Retroficiency, Inc. PRIVATE and CONFIDENTIAL 4
5. Interval and asset data can deliver insights, but
should be used at different phases of the audit
2 Energy Interval Data Building Asset Data
• Granular consumption data • General characteristics to
Definition (e.g., readings every 15 minutes) detailed energy systems in the
building
• Request from utility • Interviews with owner /
How You
• (Larger) building operator
Get It owners/operators may have • Building walk-through
• Identify no-/low-cost operational • Scoping phase
When You
opportunities • Deliver detailed audit
Use It • Determine retrofits to investigate recommendations
(c) 2012 Retroficiency, Inc. PRIVATE and CONFIDENTIAL 5
6. Determine the approach that strikes the right
balance between time, cost and measure(s)
3 Traditional Emerging
Spreadsheets Detailed Modeling Analytics-Based
• OK for lighting projects • Systematic input approach
• Complex building models
• Difficult to do more
• Streamlines benchmarking
Overview • Appropriate for highly
complex systems and • Rapidly calculates potential
customized projects
ECM interaction measures
Ease of Use Moderate Difficult Easy
Time
Investment Varies Significant Limited
Required
Expertise Some High Some
(c) 2012 Retroficiency, Inc. PRIVATE and CONFIDENTIAL 6
7. ECIs help hone in on the right opportunities; ECMs
should be developed closer to implementation
4 Energy Conservation Indicators Energy Conservation Measures
• Lighting intensity is high during • Condensing gas boiler with a 91%
unoccupied hours combustion efficiency
• Appears to be simultaneous heating • Super T8 fixture with 3 30-watt lamps
and cooling in building and electronic ballasts
• Cooling system running constantly • Install air side economizer control with
during high cooling degree days and dry bulb changeover control
may be undersized
(c) 2012 Retroficiency, Inc. PRIVATE and CONFIDENTIAL 7
8. Given those answers, managers should consider the
best option given available time and budget
Benchmark Level I Level II Level III
Minutes or Weeks or
Time: Hours
1-2 Days 3-5 Days
Months
Budget: <$500 $5K-$7.5K $10K-$20K $35K-$50K+
How many
1 buildings do I Many One
want to evaluate?
2 What information
Energy Consumption Building Asset
do I have available?
What resources are Spreadsheets Complex Model
3 appropriate given
project scope? Analytics
4 What do I want the
ECIs ECMs
outcome to be?
(c) 2012 Retroficiency, Inc. PRIVATE and CONFIDENTIAL 8
9. Questions
Any Questions?
Retroficiency, Inc.
www.retroficiency.com
(c) 2012 Retroficiency, Inc. PRIVATE and CONFIDENTIAL 9