SR-710 Environmental Study
Upcoming SlideShare
Loading in...5
×

Like this? Share it with your network

Share
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
456
On Slideshare
456
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
3
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. SR-710 Environmental StudyAll Communities Convening – March 1 and 3, 2012
  • 2. Presentation Agenda> Welcome/Introductions and Purpose> Overview of Process/Opportunities for Public Participation> Environmental Review Process> Open House Stations Review> Adjourn to Open House
  • 3. All Communities Convening> Convenes study area communities together> Open House Purpose > Share information > Learn about the process > Gather comments> Open House Process
  • 4. Notification Activities> E-Blasts> Mailing> Drop off in El Sereno Community> Announcements at meetings> Facebook Posts and Online Ads> Media coverage (print and blogs)> Libraries
  • 5. Multiple venues for participation> All Communities Convening> Community Liaison Councils> Stakeholder Outreach Advisory Committee> Variety of participation opportunities: > Roundtables > Workshops > Focus Groups > Virtual meetings > Open Houses
  • 6. Public Participation –Environmental Review Process We are here
  • 7. Project Background> Two-thirds of LA County voters approve using Measure R funds to address congestion> Unresolved SR-710 option contributes to growing congestion on nearby freeways and streets
  • 8. Environmental Review ProcessOverview
  • 9. Robust project scoping completed> March 2011 – Notice of Intent and Notice of Preparation were published> March 2011 – Agency scoping meeting was held> March/April, 2011 – Eight (8) public scoping meetings were held at various locations within the project study area> March 2011 – A virtual scoping meeting was held> September 2011 – Scoping Summary Report completed
  • 10. What we heard during Scoping> Keep all modal options on the table: > Traffic Systems Management/Traffic Demand Management low build > Surface, subsurface and elevated structures > Transit (bus and rail options) > Street improvements > Freight management systems > Supporting advanced technologies > No build
  • 11. More on what we heard> Consider the following issues: > Traffic > Natural > Engineering > Archeological > Social > Health > Aesthetic > Air Quality > Economic > Noise > Cultural > Environmental Justice
  • 12. More on what we heard> Define project need and study area> Consider local and regional planning impacts> Conduct cost/benefit analyses> Continue public participation
  • 13. Post Scoping - Initial Study Area
  • 14. Alternatives Analysis (AA)> Next step in the environmental review process> Evaluate a full range of multi-modal alternatives to address the problem> Collect data and conduct engineering and other environmental and technical assessments> Consider public comments
  • 15. Alternatives Analysis Process
  • 16. Study Decision-Making Metro,Study Team Stakeholders Caltrans & Federal Agencies Study & Inform & Input Decide Recommend Advise
  • 17. Four Elements of Need Regional transportation system Area of Influence (north-south mobility) Freeway system efficiency Congestion on local Study Area streets Transit system efficiency
  • 18. Regional Transportation System> Regional travel speeds are low> Delay is high> Travel times are unpredictable
  • 19. Freeway System> Over-capacity north-south travel demands affects mobility> High delays and unpredictable travel times on study area freeways> High accident rates on freeways
  • 20. Local Street System> Affected by excess freeway traffic> Operates at low speeds> Out-of-place freeway trips cause high levels of congestion
  • 21. Transit System> Operational deficiencies> Low travel speeds for buses> North-south transit network is constrained
  • 22. Next Steps> Develop, analyze and screen initial alternatives> Continue conceptual engineering and technical analyses> Recommend final set of alternatives – Fall 2012> Continue public participation
  • 23. Participate Online facebook.com/sr710study @SR710Study metro.net/sr710study (855) 4-SR-710-0 / (855) 477-7100 - toll free sr710study@metro.net
  • 24. Open House Stations Community1 Sign-In 4 Outreach Project Community2 Overview 5 Liaison Councils Environmental3 Process 6 Comments