TurnKey Design/Build Services

  • 106 views
Uploaded on

McKenney’s provided a turnkey design/build solution to replace an outdated chiller plant in the operating classroom complex of a government training center.

McKenney’s provided a turnkey design/build solution to replace an outdated chiller plant in the operating classroom complex of a government training center.

More in: Business
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
106
On Slideshare
0
From Embeds
0
Number of Embeds
1

Actions

Shares
Downloads
3
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. Project Name Government Facility Project Location Charleston, South Carolina Project Team Owner: Federal Government Performance Contractor: Noresco Government Central Plants Markets Specializations Pipe Shop Prefab Design/Assist Engineer: McKenney’s, Inc. Building Information Modeling Energy Management
  • 2. McKenney’s provided a turnkey design/build solution to replace an outdated chiller plant in the operating classroom complex of a government training center.
  • 3. The Challenge The specified chillers were much larger than the training center’s existing units, would not fit in the existing central plant’s configuration, and jeopardized the project’s timing and budget. Since training was in session, chilled water service could not be interrupted, and temporary chillers were beyond the budget scope. The Solution McKenney’s implemented the turnkey design solution in phases and used existing central plant equipment during new central plant construction to minimize shutdowns and stay within budget. A redesign of the central plant was necessary to accommodate the new equipment, and installation took place during four complicated, prolonged shutdowns on weekends. The content of this document is not intended as an endorsement.
  • 4. The Results Although the scope of work dramatically changed, McKenney’s executed and completed this complicated turnkey energy project on time and within budget without interrupting chilled water service. The energy savings now achieved will pay for the project costs.
  • 5. 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 P: 404-622-5000 sales@mckenneys.com 3601 Performance Road Charlotte, North Carolina 28214 P: 704-357-1200 Atlanta Office: Charlotte Office: www.mckenneys.com