Service Relationship Paves The Way - Central Plant Replacement - Atlanta, GA

54

Published on

McKenney’s leveraged its Building Services Division (BSD) relationship to perform a central plant replacement at a commercial office center. For more info visit http://www.mckenneys.com.

McKenney’s leveraged its Building Services Division (BSD) relationship to perform a central plant replacement at a commercial office center. For more info visit http://www.mckenneys.com.

Published in: Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
54
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Service Relationship Paves The Way PROJECT NAME žž Premier Commercial Office Building Central Plant Replacement PROJECT LOCATION žž Atlanta, Georgia PROJECT TEAM žž Owner: Global Pulp & Paper Company; Global Life Insurance Company žž Property Manager: Jones Lang LaSalle žž Engineer: Conway & Owen žž General Contractor: ­McKenney’s, Inc. SPECIALIZATIONS Design/Assist Energy Management Pipe Shop Prefab MARKETS žž Commercial Offices žž Central Plants M cKenney’s leveraged its Building Services Division (BSD) relationship to perform a central plant replacement at a commercial office center. operations. Although BSD had serviced the structure for years, the Engineering, Construction and Automation & Control Solutions (ACS) teams were brought in to perform the job. THE CHALLENGE The fully occupied, 52-story building with a critical data center needed new cooling towers, chillers, chilled water pumps, condenser water pumps and a building automation s ­ ystem installed without disrupting building THE SOLUTION The proven relationship that BSD had with the property manager opened the door for the other teams. McKenney’s first planned several weekend shutdowns to freeze piping and cut in new isolation valves for the installation 404-622-5000 info@mckenneys.com 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 www.mckenneys.com of equipment. Then they disassembled the chillers and set up rigging equipment to lower the chillers through the loading dock floor and into the building. All equipment was installed on holidays and weekends to minimize dis­ ruptions and prevent additional shutdowns. THE RESULTS The job was successfully completed— strengthening McKenney’s solid relationship with the property manager. 704-357-1200 info@mckenneys.com 3601 Performance Road Charlotte, North Carolina 28214 © 2014 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A. McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners. The content of this document is not intended as an endorsement.

×