Project Name
Office Consolidation Project
Project Location
Atlanta, Georgia
Project Team
Owner: Investment and Property Ma...
McKenney’s completely replaced 16 floors of mechanical systems within
an occupied commercial office building in Atlanta.
The Challenge
The McKenney’s team needed to upgrade the mechanical systems they
had originally installed 25 years ago. The...
The Results
The building owner’s goals to minimize disruptions during construction,
occupy newly renovated floors as soon ...
1056 Moreland Industrial Boulevard
Atlanta, Georgia 30316
P: 404-622-5000
sales@mckenneys.com
3601 Performance Road
Charlo...
Office Consolidation in Atlanta, GA
Upcoming SlideShare
Loading in …5
×

Office Consolidation in Atlanta, GA

284 views

Published on

McKenney’s completely replaced 16 floors of mechanical systems within an occupied commercial office building in Atlanta.

Published in: Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
284
On SlideShare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Office Consolidation in Atlanta, GA

  1. 1. Project Name Office Consolidation Project Project Location Atlanta, Georgia Project Team Owner: Investment and Property Management Firm General Contractor: Skanska USA Architect: Carson Guest Engineer: Heery International, Inc./Newcomb & Boyd Commercial Offices Markets Specializations LEED Certification Pipe Shop Prefab Sheet Metal Shop Prefab Plumbing Shop Prefab Building Information Modeling Energy Management
  2. 2. McKenney’s completely replaced 16 floors of mechanical systems within an occupied commercial office building in Atlanta.
  3. 3. The Challenge The McKenney’s team needed to upgrade the mechanical systems they had originally installed 25 years ago. The work had to be performed in phases—vacating occupied floors and relocating employees to newly renovated floors. Design challenges and a complex schedule resulted in as many as 10 floors being under construction simultaneously with varying completion dates. The Solution To minimize installation time, the team created detailed shop and fabrication drawings to get preassembled pieces to the field. A comprehensive schedule and delivery log reduced on-site clutter and allowed just-in-time arrival of materials and equipment. In addition, several key foremen managed large teams to ensure timely completion while certifying installation quality and integrity. The content of this document is not intended as an endorsement.
  4. 4. The Results The building owner’s goals to minimize disruptions during construction, occupy newly renovated floors as soon as installations were complete, and adhere to an aggressive schedule were all successfully met.
  5. 5. 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 P: 404-622-5000 sales@mckenneys.com 3601 Performance Road Charlotte, North Carolina 28214 P: 704-357-1200 Atlanta Office: Charlotte Office: www.mckenneys.com

×