Project Name
Emory University Woodruff
Physical Education Center
Project Location
Atlanta, Georgia
Project Team
Owner: Emo...
A McKenney’s service team and Emory University Woodruff Physical
Education Center (WPEC) staff improved energy efficiency ...
The Challenge
The AHUs at the WPEC had reached the end of their service life. The
mechanical room adjacent to the pool are...
The Results
The new AHUs are now contributing to Emory University WPEC’s energy
savings initiatives.
1056 Moreland Industrial Boulevard
Atlanta, Georgia 30316
P: 404-622-5000
sales@mckenneys.com
3601 Performance Road
Charlo...
New Air Handling Units (AHUs) Improves Energy Efficiency
Upcoming SlideShare
Loading in...5
×

New Air Handling Units (AHUs) Improves Energy Efficiency

195

Published on

A McKenney’s service team and Emory University Woodruff Physical Education Center staff improved energy efficiency with new air handling units (AHUs).

Published in: Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
195
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

New Air Handling Units (AHUs) Improves Energy Efficiency

  1. 1. Project Name Emory University Woodruff Physical Education Center Project Location Atlanta, Georgia Project Team Owner: Emory University Woodruff Physical Education Center Education Markets Specializations Contractor: McKenney’s, Inc. Pipe Shop Prefab Sheet Metal Shop Prefab
  2. 2. A McKenney’s service team and Emory University Woodruff Physical Education Center (WPEC) staff improved energy efficiency with new air handling units (AHUs).
  3. 3. The Challenge The AHUs at the WPEC had reached the end of their service life. The mechanical room adjacent to the pool area had very little space for AHU removal and installation. Additionally, the pool was open throughout the project, requiring collaboration with WPEC staff to avoid disruption of scheduled recreational and athletic activities. The Solution Working to maintain safety with WPEC staff, the team installed new ductwork and then disassembled the new AHUs. Next, they removed two window sections near the pool, turned the unit components sideways and used a crane to lift the parts through the windows. Once the components were inside—with half hanging mid-air over the pool at one point—they were rigged upright to make the final turn into the mechanical room. The content of this document is not intended as an endorsement.
  4. 4. The Results The new AHUs are now contributing to Emory University WPEC’s energy savings initiatives.
  5. 5. 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 P: 404-622-5000 sales@mckenneys.com 3601 Performance Road Charlotte, North Carolina 28214 P: 704-357-1200 Atlanta Office: Charlotte Office: www.mckenneys.com
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×