Mitigating Installation Risks - Data Center Cooling System Installation in Atlanta, GA
Upcoming SlideShare
Loading in...5
×
 

Mitigating Installation Risks - Data Center Cooling System Installation in Atlanta, GA

on

  • 189 views

McKenney’s installed additional cooling systems and capacity at Internap’s premium colocation facility in Atlanta. For more information visit http://www.mckenneys.com.

McKenney’s installed additional cooling systems and capacity at Internap’s premium colocation facility in Atlanta. For more information visit http://www.mckenneys.com.

Statistics

Views

Total Views
189
Views on SlideShare
189
Embed Views
0

Actions

Likes
0
Downloads
0
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Mitigating Installation Risks - Data Center Cooling System Installation in Atlanta, GA Mitigating Installation Risks - Data Center Cooling System Installation in Atlanta, GA Document Transcript

  • Mitigating Installation Risks PROJECT NAME žž Internap Data Center PROJECT LOCATION žž Atlanta, Georgia PROJECT TEAM žž Owner: Internap Network Services Corporation žž General Contractor: Kajima Associates, Inc. žž Engineer: Kajima Associates, Inc. SPECIALIZATIONS Pipe Shop Prefab Sheet Metal Shop Prefab MARKETS žž Mission Critical Photo courtesy of Internap. M cKenney’s installed additional cooling systems and capacity at Internap’s premium colocation facility in Atlanta. THE CHALLENGE Installation of the new systems in the multistory facility created material handling and site logistics challenges. With a 25-foot height from floor to slab, installation of 12-inch chilled water piping and large ductwork required use 404-622-5000 info@mckenneys.com 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 of scissor lifts—which added difficulty and risk. All roof work had to take place after hours, resulting in extended shifts and overtime work. McKenney’s also had to install piping over operational servers and other equipment in the ceiling of the existing room. scheduled building activities. To reduce work conducted over existing servers and equipment, all welding occurred in the expansion space and piping was pushed through the data center using roller hangers from the c ­ orridor through the existing server room. THE SOLUTION Offsite pipe and sheet metal fabrication minimized on-site installation hours. ­ oordinated C deliveries decreased disruption of regularly THE RESULTS The mechanical system was completed ahead of schedule, under budget and injury free—­ earning high marks from Internap. www.mckenneys.com 704-357-1200 info@mckenneys.com 3601 Performance Road Charlotte, North Carolina 28214 © 2014 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A. McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners. The content of this document is not intended as an endorsement.