Your SlideShare is downloading. ×
Installation of  Multiple Packaged Air Conditioning Units in Columbus, GA
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Installation of Multiple Packaged Air Conditioning Units in Columbus, GA

179
views

Published on

McKenney’s installed multiple packaged air conditioning units at an industrial plant in Columbus, Georgia. For more information visit http://www.mckenneys.com. …

McKenney’s installed multiple packaged air conditioning units at an industrial plant in Columbus, Georgia. For more information visit http://www.mckenneys.com.

Published in: Business, Technology

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
179
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Project Name Heatcraft Worldwide Refrigeration A/C Units Project Location Columbus, Georgia Project Team Owner: Heatcraft Worldwide Refrigeration General Contractor: McKenney’s, Inc. Engineer: McKenney’s, Inc. Specializations Design/Build Sheet Metal Shop Prefab Markets Industrial
  • 2. McKenney’s installed multiple packaged air conditioning units at an industrial plant in Columbus, Georgia. The company manufactures refrigerated systems and display cases for supermarkets and food service organizations throughout the U.S.
  • 3. The Challenge Heatcraft Worldwide Refrigeration—with two facilities and a combined total of 442,000 square feet of floor space—needed to replace its existing A/C units, which were only partially operational. In order to maintain 100 percent uptime on the manufacturing floor, McKenney’s had to perform the installation without shutting down the plant. The Solution The McKenney’s team provided multiple system options to Heatcraft and implemented a phased installation that would not disrupt manufacturing operations. All installation and construction activities were conducted through the winter months to take advantage of the cooler temperature outside. The content of this document is not intended as an endorsement.
  • 4. The Results The project—which included 18 new packaged A/C units with a combined air capacity of 875 tons—was completed in four months from start of design to Heatcraft’s acceptance of the work.
  • 5. Atlanta Office: 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 P: 404-622-5000 Charlotte Office: 3601 Performance Road Charlotte, North Carolina 28214 P: 704-357-1200 sales@mckenneys.com www.mckenneys.com