Project Name
MSC Corporate Headquarters
Project Location
Davidson, North Carolina
Project Team
Owner: MSC Industrial Suppl...
McKenney’s provided design/assist services and installed a condenser
water cooling system and controls at MSC’s new corpor...
The Challenge
The McKenney’s team had to maintain a tight budget and meet an
aggressive five-month installation schedule i...
The Results
McKenney’s used its design/assist knowledge and unique installation
capabilities to fast track the job and all...
1056 Moreland Industrial Boulevard
Atlanta, Georgia 30316
P: 404-622-5000
sales@mckenneys.com
3601 Performance Road
Charlo...
Installation of Condenser Water Cooling System and Design-Assist Services in Davidson, NC
Upcoming SlideShare
Loading in …5
×

Installation of Condenser Water Cooling System and Design-Assist Services in Davidson, NC

219 views
161 views

Published on

McKenney’s provided design/assist services and installed a condenser water cooling system and controls at MSC’s new corporate headquarters in North Carolina.

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
219
On SlideShare
0
From Embeds
0
Number of Embeds
4
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Installation of Condenser Water Cooling System and Design-Assist Services in Davidson, NC

  1. 1. Project Name MSC Corporate Headquarters Project Location Davidson, North Carolina Project Team Owner: MSC Industrial Supply Co. General Contractor: Choate Construction Company Commercial Offices Markets Architect: Rule Joy Trammel + Rubio Specializations Pipe Shop Prefab Design/Assist Engineer: Barrett, Woodyard & Associates, Inc. Sheet Metal Shop Prefab
  2. 2. McKenney’s provided design/assist services and installed a condenser water cooling system and controls at MSC’s new corporate headquarters in North Carolina.
  3. 3. The Challenge The McKenney’s team had to maintain a tight budget and meet an aggressive five-month installation schedule including the entire upfit in the new commercial office building—before precast panels blocked the team. The job was won based on the design/assist experience of the McKenney’s team which also had to prove it could seamlessly execute the installation. The Solution To stay on track and within budget, McKenney’s expedited approval of shop drawings to ensure everything was coordinated ahead of precast panel installation. In lieu of a buckhoist, a unique “trailer flying” approach was used to efficiently lift materials, pipe, duct prefab and equipment to each elevated slab during the rough-in phases. McKenney’s also fabricated all the sheet metal and used grooved piping to speed up pipe installation. The content of this document is not intended as an endorsement.
  4. 4. The Results McKenney’s used its design/assist knowledge and unique installation capabilities to fast track the job and allowed MSC to move in on schedule.
  5. 5. 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 P: 404-622-5000 sales@mckenneys.com 3601 Performance Road Charlotte, North Carolina 28214 P: 704-357-1200 Atlanta Office: Charlotte Office: www.mckenneys.com

×