In Control and Ready for Prime Time -  Air Handling Unit (AHU) Replacement -  Atlanta, Georgia
Upcoming SlideShare
Loading in...5
×
 

In Control and Ready for Prime Time - Air Handling Unit (AHU) Replacement - Atlanta, Georgia

on

  • 161 views

McKenney’s replaced an air handling unit (AHU) at the corporate campus of a national cable and satellite television network’s headquarters in Atlanta. For more info visit http://www.mckenneys.com.

McKenney’s replaced an air handling unit (AHU) at the corporate campus of a national cable and satellite television network’s headquarters in Atlanta. For more info visit http://www.mckenneys.com.

Statistics

Views

Total Views
161
Views on SlideShare
161
Embed Views
0

Actions

Likes
0
Downloads
0
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

In Control and Ready for Prime Time -  Air Handling Unit (AHU) Replacement -  Atlanta, Georgia In Control and Ready for Prime Time - Air Handling Unit (AHU) Replacement - Atlanta, Georgia Document Transcript

  • M cKenney’s replaced an air handling unit (AHU) at the corporate campus of a national cable and satellite television network’s headquarters in Atlanta. The Challenge The network studios operates 24/7 so disruption to surrounding spaces had to be minimal—requiring all work to be done after normal business hours over the weekend. Also, the air handler had to be built in place with parts craned in through the 6th floor window and then assembled. The Solution McKenney’s experience with building ­requirements as well as building new air handlers and custom handlers provided the knowledge necessary to coordinate and carry out this difficult job. While working closely with the network to fit its time constraints, the McKenney’s team replaced the air handler with a custom unit built to accom­ modate the size restrictions. The Results The existing AHU was completely dismantled and a new unit was built in its place in one weekend, allowing for greater temperature control and a happy customer ready for business Monday morning. In Control and Ready for Prime Time Project Name žž Network Studios Air Handling Unit Replacement Project Location žž Atlanta, Georgia Project Team žž Owner: Cable and Satellite Television Network žž General Contractor: ­McKenney’s, Inc. žž Engineer: McKenney’s, Inc. Project Status žž Completed LEED® Certification Level žž N/A The content of this document is not intended as an endorsement. www.mckenneys.com © 2013 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A. McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners. 404-622-5000 info@mckenneys.com 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 704-357-1200 info@mckenneys.com 3601 Performance Road Charlotte, North Carolina 28214