Data Center Cooling System Installation in Atlanta, GA

  • 50 views
Uploaded on

McKenney’s installed additional cooling systems and capacity at Internap’s premium colocation facility in Atlanta. For more information visit http://www.mckenneys.com.

McKenney’s installed additional cooling systems and capacity at Internap’s premium colocation facility in Atlanta. For more information visit http://www.mckenneys.com.

More in: Business
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
50
On Slideshare
0
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
0
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. Project Name Internap Data Center Project Location Atlanta, Georgia Project Team Owner: Internap Network Services Corporation General Contractor: Kajima Associates, Inc. Engineer: Kajima Associates, Inc. Mission Critical Specializations Pipe Shop Prefab Markets Sheet Metal Shop Prefab
  • 2. McKenney’s installed additional cooling systems and capacity at Internap’s premium colocation facility in Atlanta.
  • 3. The Challenge Installation of the new systems in the multistory facility created material handling and site logistics challenges With a 25-foot height from floor to slab, installation of 12-inch chilled water piping and large ductwork required use of scissor lifts—which added difficulty and risk. All roof work had to take place after hours, resulting in extended shifts and overtime work. McKenney’s also had to install piping over operational servers and other equipment in the ceiling of the existing room. The Solution Offsite pipe and sheet metal fabrication minimized on-site installation hours. Coordinated deliveries decreased disruption of regularly scheduled building activities. To reduce work conducted over existing servers and equipment, all welding occurred in the expansion space and piping was pushed through the data center using roller hangers from the corridor through the existing server room. The content of this document is not intended as an endorsement.
  • 4. The Results The mechanical system was completed ahead of schedule, under budget and injury free—earning high marks from Internap.