Your SlideShare is downloading. ×
Cooling Tower and Chiller Installation - Atlanta, Georgia
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Saving this for later?

Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime - even offline.

Text the download link to your phone

Standard text messaging rates apply

Cooling Tower and Chiller Installation - Atlanta, Georgia

163
views

Published on

McKenney’s replaced two cooling towers and chillers at an Atlanta commercial office building with an active data center. For more information visit http://www.mckenneys.com.

McKenney’s replaced two cooling towers and chillers at an Atlanta commercial office building with an active data center. For more information visit http://www.mckenneys.com.

Published in: Business

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
163
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Project Name Commercial Office and Data Center Project Location Atlanta, Georgia Project Team Owner: Real Estate Investment Firm General Contractor: McKenney’s, Inc. Mission Critical Specializations Markets Energy Management Pipe Shop Prefab Commercial Office
  • 2. McKenney’s replaced two cooling towers and chillers at an Atlanta commercial office building with an active data center.
  • 3. The Challenge The McKenney’s team had to install two cooling towers and two 450-ton base building chillers during construction on 14 floors without interrupting data center operations. The Solution The team installed two new Marley cooling towers and two new Carrier 19XRV chillers with variable frequency drives. A rental chiller was used to maintain cooled air in the data center during the project. All base building air handling units were refurbished with new high efficiency motors, belts and sheaves. McKenney’s also repaired insulation and replaced chilled water coils on the first two floors. The content of this document is not intended as an endorsement.
  • 4. The Results All units were replaced safely and quickly while adhering to the owner’s stringent safety standards. As a result, the owner was able to lease the full building to a large insurance company and the new tenant has signed Preventive maintenance agreements with McKenney’s on all supplemental equipment. The owner, also pleased with the cooling System upgrades, is continuing their relationship with the McKenney’s team.
  • 5. 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 P: 404-622-5000 sales@mckenneys.com 3601 Performance Road Charlotte, North Carolina 28214 P: 704-357-1200 Atlanta Office: Charlotte Office: www.mckenneys.com