Project Name
Colocation Data Center Upgrades
Project Location
Atlanta, Georgia
Project Team
Owner: Data Center
General Con...
McKenney’s replaced existing computer room mechanical units in one
of a global data center’s colocation hubs in Atlanta, G...
The Challenge
The McKenney’s team had to install new mechanical systems in an
aging building with a small freight elevator...
The Results
McKenney’s safely implemented the creative solution, resulting in a
seamless start-up of the systems with mini...
1056 Moreland Industrial Boulevard
Atlanta, Georgia 30316
P: 404-622-5000
sales@mckenneys.com
3601 Performance Road
Charlo...
Colocation Data Center Upgrades in Atlanta, Georgia
Upcoming SlideShare
Loading in...5
×

Colocation Data Center Upgrades in Atlanta, Georgia

76

Published on

McKenney’s replaced existing computer room mechanical units in one of a global data center’s colocation hubs in Atlanta, Georgia.

Published in: Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
76
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Colocation Data Center Upgrades in Atlanta, Georgia

  1. 1. Project Name Colocation Data Center Upgrades Project Location Atlanta, Georgia Project Team Owner: Data Center General Contractor: Burr Computer Environments, Inc. Mission Critical Specializations Markets N/A Engineer: Burr Computer Environments, Inc. Mechanical Contractor: McKenney’s, Inc.
  2. 2. McKenney’s replaced existing computer room mechanical units in one of a global data center’s colocation hubs in Atlanta, Georgia.
  3. 3. The Challenge The McKenney’s team had to install new mechanical systems in an aging building with a small freight elevator and limited free space to install refrigerant piping inside the building. Pipe routing presented significant challenges as did the placement of new mechanical systems into the computer room. The Solution To work around indoor space limitations, McKenney’s attached refrigerant piping to the outside of the building using a swing stage and installed it vertically to the rooftop condensing units. The piping was rigorously pressure tested to identify and repair leaks that would be cumbersome to repair after start-up. In addition, new computer room units were rigged through fire escape doors located on the exterior of the building. The content of this document is not intended as an endorsement.
  4. 4. The Results McKenney’s safely implemented the creative solution, resulting in a seamless start-up of the systems with minimal impact on the data center’s computer room.
  5. 5. 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 P: 404-622-5000 sales@mckenneys.com 3601 Performance Road Charlotte, North Carolina 28214 P: 704-357-1200 Atlanta Office: Charlotte Office: www.mckenneys.com
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×