Project Name
Network Studios Air Handling
Unit Replacement
Project Location
Atlanta, Georgia
Project Team
Owner: Cable and...
McKenney’s replaced an air handling unit (AHU) at the corporate
campus of a national cable and satellite television networ...
The Challenge
The network studios operates 24/7 so disruption to surrounding spaces
had to be minimal—requiring all work t...
The Results
The existing AHU was completely dismantled and a new unit was built in
its place in one weekend, allowing for ...
1056 Moreland Industrial Boulevard
Atlanta, Georgia 30316
P: 404-622-5000
sales@mckenneys.com
3601 Performance Road
Charlo...
1056 Moreland Industrial Boulevard
Atlanta, Georgia 30316
P: 404-622-5000
sales@mckenneys.com
3601 Performance Road
Charlo...
Air Handling Unit (AHU) Replacement in Atlanta, Georgia
Upcoming SlideShare
Loading in...5
×

Air Handling Unit (AHU) Replacement in Atlanta, Georgia

192

Published on

McKenney’s replaced an air handling unit (AHU) at the corporate campus of a national cable and satellite television network’s headquarters in Atlanta. For more info visit http://www.mckenneys.com.

Published in: Business, Health & Medicine
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
192
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
1
Comments
0
Likes
1
Embeds 0
No embeds

No notes for slide

Transcript of "Air Handling Unit (AHU) Replacement in Atlanta, Georgia "

  1. 1. Project Name Network Studios Air Handling Unit Replacement Project Location Atlanta, Georgia Project Team Owner: Cable and Satellite Television Network Project Status Completed LEED® Certification Level N/A General Contractor: McKenney’s, Inc. Engineer: McKenney’s, Inc.
  2. 2. McKenney’s replaced an air handling unit (AHU) at the corporate campus of a national cable and satellite television network’s headquarters in Atlanta.
  3. 3. The Challenge The network studios operates 24/7 so disruption to surrounding spaces had to be minimal—requiring all work to be done after normal business hours over the weekend. Also, the air handler had to be built in place with parts craned in through the 6th floor window and then assembled. The Solution McKenney’s experience with building requirements as well as building new air handlers and custom handlers provided the knowledge necessary to coordinate and carry out this difficult job. While working closely with the network to fit its time constraints, the McKenney’s team replaced the air handler with a custom unit built to accommodate the size restrictions. The content of this document is not intended as an endorsement.
  4. 4. The Results The existing AHU was completely dismantled and a new unit was built in its place in one weekend, allowing for greater temperature control and a happy customer ready for business Monday morning.
  5. 5. 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 P: 404-622-5000 sales@mckenneys.com 3601 Performance Road Charlotte, North Carolina 28214 P: 704-357-1200 Atlanta Office: Charlotte Office: www.mckenneys.com
  6. 6. 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 P: 404-622-5000 sales@mckenneys.com 3601 Performance Road Charlotte, North Carolina 28214 P: 704-357-1200 Atlanta Office: Charlotte Office: www.mckenneys.com
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×