SlideShare a Scribd company logo
1 of 17
Download to read offline
Krystal Cameron Regulatory Affairs krystal.cameron@assentcompliance.com
REACH is Constantly Changing
For Once, it is not an SVHC Update
info@assentcompliance.com | www.assentcompliance.com | TEL: 1(866)964-6931 Slide 3
AGENDA
Introduction
What has changed?
❖ Article Interpretation Issue
❖ CoRAP - 134 Substance Evaluations
❖ Registry of Intentions
❖ Proposed SVHCs
❖ Recommendations for the Authorisation List
❖ Authorisation Applications and Sunset Dates
❖ Restriction Proposal Decisions
➢ FOCUS POINTS and KEY TIPS For Compliance
info@assentcompliance.com | www.assentcompliance.com | TEL: 1(866)964-6931 Slide 4
Introduction - About Assent
info@assentcompliance.com | www.assentcompliance.com | TEL: 1(866)964-6931 Slide 5
The World is Becoming More Regulated - Assent Helps
info@assentcompliance.com | www.assentcompliance.com | TEL: 1(866)964-6931 Slide 6
Introduction
❖ REGULATION (EC) No 1907/2006 OF THE EUROPEAN PARLIAMENT AND OF THE
COUNCIL of 18 December 2006
❖ 2 Major Responsibility Sectors
➢ Articles vs. Substances and Mixtures
❖ Scope
❖ The General Perception of REACH
info@assentcompliance.com | www.assentcompliance.com | TEL: 1(866)964-6931 Slide 7
Article Interpretation Changing?
❖ Obligations to report SVHCs in articles applies to components incorporated into
articles, not the whole article.
❖ Not legally Binding, tends to influence
❖ Communication – suppliers of entire articles must provide information on SVHCs if
they are present in any of its components and relevant information is “available.”
❖ Notification - producer vs importer responsibilities, notification is rarely in play
❖ Where did this come from?
❖ What now?
➢ We wait on the the Court of Justice ruling
info@assentcompliance.com | www.assentcompliance.com | TEL: 1(866)964-6931 Slide 8
So Many Lists...how do they all fit?
info@assentcompliance.com | www.assentcompliance.com | TEL: 1(866)964-6931 Slide 9
CoRAP - 134 Substance Evaluations
PACT-RMOA (http://echa.europa.eu/addressing-chemicals-of-concern/substances-of-potential-concern/pact)
CoRAP - Community Action Rolling Plan (http://echa.europa.eu/information-on-chemicals/evaluation/community-rolling-
action-plan/corap-table)
❖ Final CoRAP was adopted Mar 17
❖ Next 3 years (2015-2017) = 66 newly elected + 68 from the previous update
http://echa.europa.eu/documents/10162/13628/corap_list_2015-2017_en.pdf
❖ 48 Substances for 2015 - Due by Mar 2016
❖ Substance evaluation mechanism
X
info@assentcompliance.com | www.assentcompliance.com | TEL: 1(866)964-6931 Slide 10
Registry of Intentions
http://echa.europa.eu/web/guest/registry-of-current-svhc-intentions
7 in total
5 have been on the list since 2008, 1 since 2011
Name EC Number CAS Number Notification of
intention
Expected date of
submission
Scope
Dicyclohexyl phthalate 201-545-9 84-61-7 20/03/2015 03/08/2015 ED
Benzo[def]chrysene (Benzo[a]pyrene) [Benzo[a]
pyrene and all substances that contain benzo[a]
pyrene at a concentration equal to or greater than
0.01 % by weight.]
200-028-5 50-32-8 16/11/2011
CMR;
PBT
info@assentcompliance.com | www.assentcompliance.com | TEL: 1(866)964-6931 Slide 11
Proposed SVHCs
http://echa.europa.eu/web/guest/proposals-to-identify-substances-of-very-high-
concern-previous-consultations
Name EC Number CAS Number Proposing authority Reason for proposing
1,2-benzenedicarboxylic acid, di-C6-10-alkyl esters; 1,2-
benzenedicarboxylic acid, mixed decyl and hexyl and octyl diesters
with ≥ 0.3% of dihexyl phthalate (EC No. 201-559-5)
271-094-0
272-013-1
68515-51-5
68648-93-1
Sweden
Toxic for Reproduction
(Article 57 c)
5-sec-butyl-2-(2,4-dimethylcyclohex-3-en-1-yl)-5-methyl-1,3-dioxane [1],
5-sec-butyl-2-(4,6-dimethylcyclohex-3-en-1-yl)-5-methyl-1,3-dioxane [2]
[covering any of the individual isomers of [1] and [2] or any
combination thereof]
- - Netherlands vPvB (Article 57 e)
Next SVHC List - June 2015
info@assentcompliance.com | www.assentcompliance.com | TEL: 1(866)964-6931 Slide 12
Authorisation List Recommendations
http://echa.europa.eu/addressing-chemicals-of-
concern/authorisation/recommendation-for-inclusion-in-the-authorisation-list
❖ 22 Substances
❖ Remember! All currently on the SVHC List
❖ Not applicable to imported articles if already “integral”
➢ Authorisation affects producers in the EU
➢ Consider Business Risk
info@assentcompliance.com | www.assentcompliance.com | TEL: 1(866)964-6931 Slide 13
Authorisation Applications and Sunset Dates
http://echa.europa.eu/addressing-chemicals-of-
concern/authorisation/recommendation-for-inclusion-in-the-authorisation-
list/authorisation-list
❖ 31 Substances
❖ Application Date has passed for 15
❖ Sunset Date passed for 6
❖ 5 - May of 2015
❖ 3 - August 2015
info@assentcompliance.com | www.assentcompliance.com | TEL: 1(866)964-6931 Slide 14
Restriction Proposal Decisions
FULL LIST:
http://echa.europa.eu/addressing-chemicals-of-concern/restrictions/list-of-
restrictions
Under Consideration:
http://echa.europa.eu/web/guest/restrictions-under-consideration
Registry of Intentions:
http://echa.europa.eu/web/guest/registry-of-current-restriction-proposal-intentions
info@assentcompliance.com | www.assentcompliance.com | TEL: 1(866)964-6931 Slide 15
Compliance Implications
❖ Measure Impact
➢ Substances/Mixtures
➢ Articles
➢ Business vs. Regulatory
❖ Supplier Education
❖ Yearly Audits
❖ Supplier Data Gathering, Testing and Risk Assessment
❖ FMDs?
info@assentcompliance.com | www.assentcompliance.com | TEL: 1(866)964-6931 Slide 16
SUMMARY
❖ Waiting on the article interpretation - SVHC Communication could change significantly
❖ Many lists to track but only a select few have actual legal implications
❖ The volume of substances going into the SVHC Process (Authorisation Process) is substantial
To be reactive will be too late. Assent Compliance can help you:
❏ Assess your areas of risk
❏ Assess the impact to your products
❏ Educate your suppliers
❏ Test where required
❏ Prepare for the update to the relevant documentation
You must be tracking all of these changes and the impact to your products to stay in compliance, meet
the needs of your customers and stay...
✓
✓
✓
✓
✓
CANADA
5300 Canotek, Suite 30
Ottawa | ON | K1J 1A4
USA
244 Fifth Avenue | Suite
1717
New York | NY | 10001 | USA
UNITED KINGDOM
Longcroft House,
2-8 Victoira Avenue, Bishopgate
London | UK | EC2M 4NS
Krystal Cameron
1-866-964-6931
krystal.cameron@assentcompliance.com
613-882-1429

More Related Content

What's hot

Mike Willis, UK Space Agency - Spectrum Dependency
Mike Willis, UK Space Agency - Spectrum DependencyMike Willis, UK Space Agency - Spectrum Dependency
Mike Willis, UK Space Agency - Spectrum DependencytechUK
 
Scandinavian Rail Development 2013 - Richard Aaroe
Scandinavian Rail Development 2013 - Richard AaroeScandinavian Rail Development 2013 - Richard Aaroe
Scandinavian Rail Development 2013 - Richard AaroeRussell Publishing
 
Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...
Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...
Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...Russell Publishing
 
FERMA Seminar 2014 - 21 September Risk environment & perspectives
FERMA Seminar 2014 - 21 September Risk environment & perspectivesFERMA Seminar 2014 - 21 September Risk environment & perspectives
FERMA Seminar 2014 - 21 September Risk environment & perspectivesFERMA
 
UK SPF Steering Board Update
UK SPF Steering Board UpdateUK SPF Steering Board Update
UK SPF Steering Board UpdatetechUK
 
Contributions by Parliamentarians, The European Transport Safety Council
Contributions by Parliamentarians, The European Transport Safety CouncilContributions by Parliamentarians, The European Transport Safety Council
Contributions by Parliamentarians, The European Transport Safety CouncilTowards Zero Foundation
 
UK SPF Cluster 1 update
UK SPF Cluster 1 updateUK SPF Cluster 1 update
UK SPF Cluster 1 updatetechUK
 
Cdawson300908
Cdawson300908Cdawson300908
Cdawson300908eas
 
European policies regarding noise assessment
European policies regarding noise assessmentEuropean policies regarding noise assessment
European policies regarding noise assessmentHenk Wolfert
 
Quick Summary of UK Spectrum Policy ForumEvents, Reports and Structures
Quick Summary of UK Spectrum Policy ForumEvents, Reports and StructuresQuick Summary of UK Spectrum Policy ForumEvents, Reports and Structures
Quick Summary of UK Spectrum Policy ForumEvents, Reports and StructurestechUK
 
ITS World Congress 2015 ts05 safety systems ima
ITS World Congress  2015   ts05 safety systems imaITS World Congress  2015   ts05 safety systems ima
ITS World Congress 2015 ts05 safety systems imaAntoine Trarieux
 
Satellite Applications & Services programme: 2016 Priorities
Satellite Applications & Services programme: 2016 PrioritiesSatellite Applications & Services programme: 2016 Priorities
Satellite Applications & Services programme: 2016 PrioritiestechUK
 
“EU Electricity Market & System: What’s new with 4th Package?”
“EU Electricity Market & System:  What’s new with 4th Package?”“EU Electricity Market & System:  What’s new with 4th Package?”
“EU Electricity Market & System: What’s new with 4th Package?”European University Institute
 
Regional Security Coordination (RSCI) & ENTSO-E'S recommendations
Regional Security Coordination (RSCI) & ENTSO-E'S recommendationsRegional Security Coordination (RSCI) & ENTSO-E'S recommendations
Regional Security Coordination (RSCI) & ENTSO-E'S recommendationsENTSO-E
 
CD June 2016 - Highways England's Innovation Strategy
CD June 2016 -  Highways England's Innovation StrategyCD June 2016 -  Highways England's Innovation Strategy
CD June 2016 - Highways England's Innovation StrategyComit Projects Ltd
 

What's hot (18)

Mike Willis, UK Space Agency - Spectrum Dependency
Mike Willis, UK Space Agency - Spectrum DependencyMike Willis, UK Space Agency - Spectrum Dependency
Mike Willis, UK Space Agency - Spectrum Dependency
 
Scandinavian Rail Development 2013 - Richard Aaroe
Scandinavian Rail Development 2013 - Richard AaroeScandinavian Rail Development 2013 - Richard Aaroe
Scandinavian Rail Development 2013 - Richard Aaroe
 
Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...
Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...
Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...
 
FERMA Seminar 2014 - 21 September Risk environment & perspectives
FERMA Seminar 2014 - 21 September Risk environment & perspectivesFERMA Seminar 2014 - 21 September Risk environment & perspectives
FERMA Seminar 2014 - 21 September Risk environment & perspectives
 
Gas transparency requirements
Gas transparency requirementsGas transparency requirements
Gas transparency requirements
 
UK SPF Steering Board Update
UK SPF Steering Board UpdateUK SPF Steering Board Update
UK SPF Steering Board Update
 
Ahu Meryem Daloglu, SIGMA Public procurement review bodies conference, Ohrid ...
Ahu Meryem Daloglu, SIGMA Public procurement review bodies conference, Ohrid ...Ahu Meryem Daloglu, SIGMA Public procurement review bodies conference, Ohrid ...
Ahu Meryem Daloglu, SIGMA Public procurement review bodies conference, Ohrid ...
 
Contributions by Parliamentarians, The European Transport Safety Council
Contributions by Parliamentarians, The European Transport Safety CouncilContributions by Parliamentarians, The European Transport Safety Council
Contributions by Parliamentarians, The European Transport Safety Council
 
UK SPF Cluster 1 update
UK SPF Cluster 1 updateUK SPF Cluster 1 update
UK SPF Cluster 1 update
 
Charging for use of infrastructure by road freight
Charging for use of infrastructure by road freightCharging for use of infrastructure by road freight
Charging for use of infrastructure by road freight
 
Cdawson300908
Cdawson300908Cdawson300908
Cdawson300908
 
European policies regarding noise assessment
European policies regarding noise assessmentEuropean policies regarding noise assessment
European policies regarding noise assessment
 
Quick Summary of UK Spectrum Policy ForumEvents, Reports and Structures
Quick Summary of UK Spectrum Policy ForumEvents, Reports and StructuresQuick Summary of UK Spectrum Policy ForumEvents, Reports and Structures
Quick Summary of UK Spectrum Policy ForumEvents, Reports and Structures
 
ITS World Congress 2015 ts05 safety systems ima
ITS World Congress  2015   ts05 safety systems imaITS World Congress  2015   ts05 safety systems ima
ITS World Congress 2015 ts05 safety systems ima
 
Satellite Applications & Services programme: 2016 Priorities
Satellite Applications & Services programme: 2016 PrioritiesSatellite Applications & Services programme: 2016 Priorities
Satellite Applications & Services programme: 2016 Priorities
 
“EU Electricity Market & System: What’s new with 4th Package?”
“EU Electricity Market & System:  What’s new with 4th Package?”“EU Electricity Market & System:  What’s new with 4th Package?”
“EU Electricity Market & System: What’s new with 4th Package?”
 
Regional Security Coordination (RSCI) & ENTSO-E'S recommendations
Regional Security Coordination (RSCI) & ENTSO-E'S recommendationsRegional Security Coordination (RSCI) & ENTSO-E'S recommendations
Regional Security Coordination (RSCI) & ENTSO-E'S recommendations
 
CD June 2016 - Highways England's Innovation Strategy
CD June 2016 -  Highways England's Innovation StrategyCD June 2016 -  Highways England's Innovation Strategy
CD June 2016 - Highways England's Innovation Strategy
 

Similar to Reach webinar additional information assent april 2015

Claims club, London - September 2016
Claims club, London - September 2016Claims club, London - September 2016
Claims club, London - September 2016Browne Jacobson LLP
 
Claims club, Birmingham - September 2016
Claims club, Birmingham - September 2016Claims club, Birmingham - September 2016
Claims club, Birmingham - September 2016Browne Jacobson LLP
 
ACI's Nuclear Power Plant Life Management & Extension.
ACI's Nuclear Power Plant Life Management & Extension.ACI's Nuclear Power Plant Life Management & Extension.
ACI's Nuclear Power Plant Life Management & Extension.ACI Whitmore Group
 
Assent webinar cm3_updates-aug19-2014-slideshare3
Assent webinar cm3_updates-aug19-2014-slideshare3Assent webinar cm3_updates-aug19-2014-slideshare3
Assent webinar cm3_updates-aug19-2014-slideshare3brytani
 
DASA FASS 2 - Finding explosives hidden in electrical items Innovation Networ...
DASA FASS 2 - Finding explosives hidden in electrical items Innovation Networ...DASA FASS 2 - Finding explosives hidden in electrical items Innovation Networ...
DASA FASS 2 - Finding explosives hidden in electrical items Innovation Networ...Heather-Fiona Egan
 
Investor presentation deck q1 v4 short
Investor presentation deck q1 v4 shortInvestor presentation deck q1 v4 short
Investor presentation deck q1 v4 shortEd Stahl
 
Investor presentation deck q1 v2 short
Investor presentation deck q1 v2 shortInvestor presentation deck q1 v2 short
Investor presentation deck q1 v2 shortEd Stahl
 
Brian McVeigh, IES/IBN Discussion meeting: Waste soils on development sites o...
Brian McVeigh, IES/IBN Discussion meeting: Waste soils on development sites o...Brian McVeigh, IES/IBN Discussion meeting: Waste soils on development sites o...
Brian McVeigh, IES/IBN Discussion meeting: Waste soils on development sites o...IES / IAQM
 
Htuf national meeting preview webinar 8 19-14
Htuf national meeting preview webinar 8 19-14Htuf national meeting preview webinar 8 19-14
Htuf national meeting preview webinar 8 19-14CALSTART
 
Decommissioning your offshore assets
Decommissioning your offshore assetsDecommissioning your offshore assets
Decommissioning your offshore assetsAdvisian
 
Transportation Sector - Railways - Analysis and Commentary - August 2023.pptx
Transportation Sector - Railways - Analysis and Commentary - August 2023.pptxTransportation Sector - Railways - Analysis and Commentary - August 2023.pptx
Transportation Sector - Railways - Analysis and Commentary - August 2023.pptxpaul young cpa, cga
 
2019-cba-symposium-meredith_roberts_sierra_energy.pptx
2019-cba-symposium-meredith_roberts_sierra_energy.pptx2019-cba-symposium-meredith_roberts_sierra_energy.pptx
2019-cba-symposium-meredith_roberts_sierra_energy.pptxLe Hoang Phong
 
Assent webinar cm3_updates-aug19-2014-slideshare
Assent webinar cm3_updates-aug19-2014-slideshareAssent webinar cm3_updates-aug19-2014-slideshare
Assent webinar cm3_updates-aug19-2014-slidesharebrytani
 
FINAL_SierraClubLomaPrieta_Comments_SSF_DSAP_DEIR
FINAL_SierraClubLomaPrieta_Comments_SSF_DSAP_DEIRFINAL_SierraClubLomaPrieta_Comments_SSF_DSAP_DEIR
FINAL_SierraClubLomaPrieta_Comments_SSF_DSAP_DEIRKenneth Rosales
 
Enhanced GNSS Receiver/User Terminal - Webinar (Fundamental Elements Call)
Enhanced GNSS Receiver/User Terminal - Webinar (Fundamental Elements Call)Enhanced GNSS Receiver/User Terminal - Webinar (Fundamental Elements Call)
Enhanced GNSS Receiver/User Terminal - Webinar (Fundamental Elements Call)The European GNSS Agency (GSA)
 
Brief Summary: Voice of Customer (Fleet Managers of Heavy-Trucks)
Brief Summary: Voice of Customer (Fleet Managers of Heavy-Trucks)Brief Summary: Voice of Customer (Fleet Managers of Heavy-Trucks)
Brief Summary: Voice of Customer (Fleet Managers of Heavy-Trucks)Sandeep Kar
 

Similar to Reach webinar additional information assent april 2015 (20)

Claims club, London - September 2016
Claims club, London - September 2016Claims club, London - September 2016
Claims club, London - September 2016
 
Claims club, Birmingham - September 2016
Claims club, Birmingham - September 2016Claims club, Birmingham - September 2016
Claims club, Birmingham - September 2016
 
ACI's Nuclear Power Plant Life Management & Extension.
ACI's Nuclear Power Plant Life Management & Extension.ACI's Nuclear Power Plant Life Management & Extension.
ACI's Nuclear Power Plant Life Management & Extension.
 
Assent webinar cm3_updates-aug19-2014-slideshare3
Assent webinar cm3_updates-aug19-2014-slideshare3Assent webinar cm3_updates-aug19-2014-slideshare3
Assent webinar cm3_updates-aug19-2014-slideshare3
 
ESSP support to LPV implementation
ESSP support to LPV implementationESSP support to LPV implementation
ESSP support to LPV implementation
 
DASA FASS 2 - Finding explosives hidden in electrical items Innovation Networ...
DASA FASS 2 - Finding explosives hidden in electrical items Innovation Networ...DASA FASS 2 - Finding explosives hidden in electrical items Innovation Networ...
DASA FASS 2 - Finding explosives hidden in electrical items Innovation Networ...
 
Investor presentation deck q1 v4 short
Investor presentation deck q1 v4 shortInvestor presentation deck q1 v4 short
Investor presentation deck q1 v4 short
 
Investor presentation deck q1 v2 short
Investor presentation deck q1 v2 shortInvestor presentation deck q1 v2 short
Investor presentation deck q1 v2 short
 
Brian McVeigh, IES/IBN Discussion meeting: Waste soils on development sites o...
Brian McVeigh, IES/IBN Discussion meeting: Waste soils on development sites o...Brian McVeigh, IES/IBN Discussion meeting: Waste soils on development sites o...
Brian McVeigh, IES/IBN Discussion meeting: Waste soils on development sites o...
 
Htuf national meeting preview webinar 8 19-14
Htuf national meeting preview webinar 8 19-14Htuf national meeting preview webinar 8 19-14
Htuf national meeting preview webinar 8 19-14
 
Decommissioning your offshore assets
Decommissioning your offshore assetsDecommissioning your offshore assets
Decommissioning your offshore assets
 
CSI capsize - salvage
CSI capsize - salvageCSI capsize - salvage
CSI capsize - salvage
 
Transportation Sector - Railways - Analysis and Commentary - August 2023.pptx
Transportation Sector - Railways - Analysis and Commentary - August 2023.pptxTransportation Sector - Railways - Analysis and Commentary - August 2023.pptx
Transportation Sector - Railways - Analysis and Commentary - August 2023.pptx
 
2019-cba-symposium-meredith_roberts_sierra_energy.pptx
2019-cba-symposium-meredith_roberts_sierra_energy.pptx2019-cba-symposium-meredith_roberts_sierra_energy.pptx
2019-cba-symposium-meredith_roberts_sierra_energy.pptx
 
Assent webinar cm3_updates-aug19-2014-slideshare
Assent webinar cm3_updates-aug19-2014-slideshareAssent webinar cm3_updates-aug19-2014-slideshare
Assent webinar cm3_updates-aug19-2014-slideshare
 
Evaluation of Michigan’s TACT Program
Evaluation of Michigan’s TACT ProgramEvaluation of Michigan’s TACT Program
Evaluation of Michigan’s TACT Program
 
FINAL_SierraClubLomaPrieta_Comments_SSF_DSAP_DEIR
FINAL_SierraClubLomaPrieta_Comments_SSF_DSAP_DEIRFINAL_SierraClubLomaPrieta_Comments_SSF_DSAP_DEIR
FINAL_SierraClubLomaPrieta_Comments_SSF_DSAP_DEIR
 
Next-Generation Fly-Ash Based Proppants
Next-Generation Fly-Ash Based ProppantsNext-Generation Fly-Ash Based Proppants
Next-Generation Fly-Ash Based Proppants
 
Enhanced GNSS Receiver/User Terminal - Webinar (Fundamental Elements Call)
Enhanced GNSS Receiver/User Terminal - Webinar (Fundamental Elements Call)Enhanced GNSS Receiver/User Terminal - Webinar (Fundamental Elements Call)
Enhanced GNSS Receiver/User Terminal - Webinar (Fundamental Elements Call)
 
Brief Summary: Voice of Customer (Fleet Managers of Heavy-Trucks)
Brief Summary: Voice of Customer (Fleet Managers of Heavy-Trucks)Brief Summary: Voice of Customer (Fleet Managers of Heavy-Trucks)
Brief Summary: Voice of Customer (Fleet Managers of Heavy-Trucks)
 

More from Matt Whitteker

Why Companies Succeed
Why Companies Succeed Why Companies Succeed
Why Companies Succeed Matt Whitteker
 
Stock Price and Business Case for Compliance
Stock Price and Business Case for ComplianceStock Price and Business Case for Compliance
Stock Price and Business Case for ComplianceMatt Whitteker
 
Reach SVHC List Update Webinar Jan 2015
Reach SVHC List Update Webinar Jan 2015Reach SVHC List Update Webinar Jan 2015
Reach SVHC List Update Webinar Jan 2015Matt Whitteker
 
CMRT (Conflict Minerals Reporting Template) Data Validation
CMRT (Conflict Minerals Reporting Template) Data Validation CMRT (Conflict Minerals Reporting Template) Data Validation
CMRT (Conflict Minerals Reporting Template) Data Validation Matt Whitteker
 
Conflict Minerals Survey -- Tulane University
Conflict Minerals Survey -- Tulane University Conflict Minerals Survey -- Tulane University
Conflict Minerals Survey -- Tulane University Matt Whitteker
 
Advancing Compliance Assurance and EHS Management Systems
Advancing Compliance Assurance and EHS Management Systems Advancing Compliance Assurance and EHS Management Systems
Advancing Compliance Assurance and EHS Management Systems Matt Whitteker
 
RoHS Exemption List - Review By: Assent Compliance
RoHS Exemption List - Review By: Assent Compliance RoHS Exemption List - Review By: Assent Compliance
RoHS Exemption List - Review By: Assent Compliance Matt Whitteker
 
REACH Regulation - Frequently Asked Questions
REACH Regulation - Frequently Asked Questions REACH Regulation - Frequently Asked Questions
REACH Regulation - Frequently Asked Questions Matt Whitteker
 
CMRT 3.01 - Comparison To The EICC Gesi Template
CMRT 3.01 - Comparison To The EICC Gesi Template CMRT 3.01 - Comparison To The EICC Gesi Template
CMRT 3.01 - Comparison To The EICC Gesi Template Matt Whitteker
 
Conflict Mineral Compliance - Frequently Asked Questions
Conflict Mineral Compliance - Frequently Asked Questions Conflict Mineral Compliance - Frequently Asked Questions
Conflict Mineral Compliance - Frequently Asked Questions Matt Whitteker
 
Product Compliance Supplier Influence
Product Compliance Supplier Influence Product Compliance Supplier Influence
Product Compliance Supplier Influence Matt Whitteker
 
Conflict Mineral Compliance Toolkit For Executives
Conflict Mineral Compliance Toolkit For Executives Conflict Mineral Compliance Toolkit For Executives
Conflict Mineral Compliance Toolkit For Executives Matt Whitteker
 
Product Compliance Software Vendor Sourcing Guide
Product Compliance Software Vendor Sourcing Guide Product Compliance Software Vendor Sourcing Guide
Product Compliance Software Vendor Sourcing Guide Matt Whitteker
 
CMRT 3.01 Different Between EICC - Gesi Form
CMRT 3.01 Different Between EICC - Gesi Form CMRT 3.01 Different Between EICC - Gesi Form
CMRT 3.01 Different Between EICC - Gesi Form Matt Whitteker
 
RoHS II Compliance Presentation - Assent Compliance
RoHS II Compliance Presentation - Assent ComplianceRoHS II Compliance Presentation - Assent Compliance
RoHS II Compliance Presentation - Assent ComplianceMatt Whitteker
 
REACH SVHC New - Webinar
REACH SVHC New - Webinar REACH SVHC New - Webinar
REACH SVHC New - Webinar Matt Whitteker
 
10 count nov17-2012-presentation6
10 count nov17-2012-presentation610 count nov17-2012-presentation6
10 count nov17-2012-presentation6Matt Whitteker
 
10 count nov17-2012-presentation4
10 count nov17-2012-presentation410 count nov17-2012-presentation4
10 count nov17-2012-presentation4Matt Whitteker
 
10 count nov17-2012-presentation3
10 count nov17-2012-presentation310 count nov17-2012-presentation3
10 count nov17-2012-presentation3Matt Whitteker
 

More from Matt Whitteker (20)

Why Companies Succeed
Why Companies Succeed Why Companies Succeed
Why Companies Succeed
 
Stock Price and Business Case for Compliance
Stock Price and Business Case for ComplianceStock Price and Business Case for Compliance
Stock Price and Business Case for Compliance
 
Sec reporting
Sec reportingSec reporting
Sec reporting
 
Reach SVHC List Update Webinar Jan 2015
Reach SVHC List Update Webinar Jan 2015Reach SVHC List Update Webinar Jan 2015
Reach SVHC List Update Webinar Jan 2015
 
CMRT (Conflict Minerals Reporting Template) Data Validation
CMRT (Conflict Minerals Reporting Template) Data Validation CMRT (Conflict Minerals Reporting Template) Data Validation
CMRT (Conflict Minerals Reporting Template) Data Validation
 
Conflict Minerals Survey -- Tulane University
Conflict Minerals Survey -- Tulane University Conflict Minerals Survey -- Tulane University
Conflict Minerals Survey -- Tulane University
 
Advancing Compliance Assurance and EHS Management Systems
Advancing Compliance Assurance and EHS Management Systems Advancing Compliance Assurance and EHS Management Systems
Advancing Compliance Assurance and EHS Management Systems
 
RoHS Exemption List - Review By: Assent Compliance
RoHS Exemption List - Review By: Assent Compliance RoHS Exemption List - Review By: Assent Compliance
RoHS Exemption List - Review By: Assent Compliance
 
REACH Regulation - Frequently Asked Questions
REACH Regulation - Frequently Asked Questions REACH Regulation - Frequently Asked Questions
REACH Regulation - Frequently Asked Questions
 
CMRT 3.01 - Comparison To The EICC Gesi Template
CMRT 3.01 - Comparison To The EICC Gesi Template CMRT 3.01 - Comparison To The EICC Gesi Template
CMRT 3.01 - Comparison To The EICC Gesi Template
 
Conflict Mineral Compliance - Frequently Asked Questions
Conflict Mineral Compliance - Frequently Asked Questions Conflict Mineral Compliance - Frequently Asked Questions
Conflict Mineral Compliance - Frequently Asked Questions
 
Product Compliance Supplier Influence
Product Compliance Supplier Influence Product Compliance Supplier Influence
Product Compliance Supplier Influence
 
Conflict Mineral Compliance Toolkit For Executives
Conflict Mineral Compliance Toolkit For Executives Conflict Mineral Compliance Toolkit For Executives
Conflict Mineral Compliance Toolkit For Executives
 
Product Compliance Software Vendor Sourcing Guide
Product Compliance Software Vendor Sourcing Guide Product Compliance Software Vendor Sourcing Guide
Product Compliance Software Vendor Sourcing Guide
 
CMRT 3.01 Different Between EICC - Gesi Form
CMRT 3.01 Different Between EICC - Gesi Form CMRT 3.01 Different Between EICC - Gesi Form
CMRT 3.01 Different Between EICC - Gesi Form
 
RoHS II Compliance Presentation - Assent Compliance
RoHS II Compliance Presentation - Assent ComplianceRoHS II Compliance Presentation - Assent Compliance
RoHS II Compliance Presentation - Assent Compliance
 
REACH SVHC New - Webinar
REACH SVHC New - Webinar REACH SVHC New - Webinar
REACH SVHC New - Webinar
 
10 count nov17-2012-presentation6
10 count nov17-2012-presentation610 count nov17-2012-presentation6
10 count nov17-2012-presentation6
 
10 count nov17-2012-presentation4
10 count nov17-2012-presentation410 count nov17-2012-presentation4
10 count nov17-2012-presentation4
 
10 count nov17-2012-presentation3
10 count nov17-2012-presentation310 count nov17-2012-presentation3
10 count nov17-2012-presentation3
 

Recently uploaded

Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 

Recently uploaded (20)

Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 

Reach webinar additional information assent april 2015

  • 1.
  • 2. Krystal Cameron Regulatory Affairs krystal.cameron@assentcompliance.com REACH is Constantly Changing For Once, it is not an SVHC Update
  • 3. info@assentcompliance.com | www.assentcompliance.com | TEL: 1(866)964-6931 Slide 3 AGENDA Introduction What has changed? ❖ Article Interpretation Issue ❖ CoRAP - 134 Substance Evaluations ❖ Registry of Intentions ❖ Proposed SVHCs ❖ Recommendations for the Authorisation List ❖ Authorisation Applications and Sunset Dates ❖ Restriction Proposal Decisions ➢ FOCUS POINTS and KEY TIPS For Compliance
  • 4. info@assentcompliance.com | www.assentcompliance.com | TEL: 1(866)964-6931 Slide 4 Introduction - About Assent
  • 5. info@assentcompliance.com | www.assentcompliance.com | TEL: 1(866)964-6931 Slide 5 The World is Becoming More Regulated - Assent Helps
  • 6. info@assentcompliance.com | www.assentcompliance.com | TEL: 1(866)964-6931 Slide 6 Introduction ❖ REGULATION (EC) No 1907/2006 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 18 December 2006 ❖ 2 Major Responsibility Sectors ➢ Articles vs. Substances and Mixtures ❖ Scope ❖ The General Perception of REACH
  • 7. info@assentcompliance.com | www.assentcompliance.com | TEL: 1(866)964-6931 Slide 7 Article Interpretation Changing? ❖ Obligations to report SVHCs in articles applies to components incorporated into articles, not the whole article. ❖ Not legally Binding, tends to influence ❖ Communication – suppliers of entire articles must provide information on SVHCs if they are present in any of its components and relevant information is “available.” ❖ Notification - producer vs importer responsibilities, notification is rarely in play ❖ Where did this come from? ❖ What now? ➢ We wait on the the Court of Justice ruling
  • 8. info@assentcompliance.com | www.assentcompliance.com | TEL: 1(866)964-6931 Slide 8 So Many Lists...how do they all fit?
  • 9. info@assentcompliance.com | www.assentcompliance.com | TEL: 1(866)964-6931 Slide 9 CoRAP - 134 Substance Evaluations PACT-RMOA (http://echa.europa.eu/addressing-chemicals-of-concern/substances-of-potential-concern/pact) CoRAP - Community Action Rolling Plan (http://echa.europa.eu/information-on-chemicals/evaluation/community-rolling- action-plan/corap-table) ❖ Final CoRAP was adopted Mar 17 ❖ Next 3 years (2015-2017) = 66 newly elected + 68 from the previous update http://echa.europa.eu/documents/10162/13628/corap_list_2015-2017_en.pdf ❖ 48 Substances for 2015 - Due by Mar 2016 ❖ Substance evaluation mechanism X
  • 10. info@assentcompliance.com | www.assentcompliance.com | TEL: 1(866)964-6931 Slide 10 Registry of Intentions http://echa.europa.eu/web/guest/registry-of-current-svhc-intentions 7 in total 5 have been on the list since 2008, 1 since 2011 Name EC Number CAS Number Notification of intention Expected date of submission Scope Dicyclohexyl phthalate 201-545-9 84-61-7 20/03/2015 03/08/2015 ED Benzo[def]chrysene (Benzo[a]pyrene) [Benzo[a] pyrene and all substances that contain benzo[a] pyrene at a concentration equal to or greater than 0.01 % by weight.] 200-028-5 50-32-8 16/11/2011 CMR; PBT
  • 11. info@assentcompliance.com | www.assentcompliance.com | TEL: 1(866)964-6931 Slide 11 Proposed SVHCs http://echa.europa.eu/web/guest/proposals-to-identify-substances-of-very-high- concern-previous-consultations Name EC Number CAS Number Proposing authority Reason for proposing 1,2-benzenedicarboxylic acid, di-C6-10-alkyl esters; 1,2- benzenedicarboxylic acid, mixed decyl and hexyl and octyl diesters with ≥ 0.3% of dihexyl phthalate (EC No. 201-559-5) 271-094-0 272-013-1 68515-51-5 68648-93-1 Sweden Toxic for Reproduction (Article 57 c) 5-sec-butyl-2-(2,4-dimethylcyclohex-3-en-1-yl)-5-methyl-1,3-dioxane [1], 5-sec-butyl-2-(4,6-dimethylcyclohex-3-en-1-yl)-5-methyl-1,3-dioxane [2] [covering any of the individual isomers of [1] and [2] or any combination thereof] - - Netherlands vPvB (Article 57 e) Next SVHC List - June 2015
  • 12. info@assentcompliance.com | www.assentcompliance.com | TEL: 1(866)964-6931 Slide 12 Authorisation List Recommendations http://echa.europa.eu/addressing-chemicals-of- concern/authorisation/recommendation-for-inclusion-in-the-authorisation-list ❖ 22 Substances ❖ Remember! All currently on the SVHC List ❖ Not applicable to imported articles if already “integral” ➢ Authorisation affects producers in the EU ➢ Consider Business Risk
  • 13. info@assentcompliance.com | www.assentcompliance.com | TEL: 1(866)964-6931 Slide 13 Authorisation Applications and Sunset Dates http://echa.europa.eu/addressing-chemicals-of- concern/authorisation/recommendation-for-inclusion-in-the-authorisation- list/authorisation-list ❖ 31 Substances ❖ Application Date has passed for 15 ❖ Sunset Date passed for 6 ❖ 5 - May of 2015 ❖ 3 - August 2015
  • 14. info@assentcompliance.com | www.assentcompliance.com | TEL: 1(866)964-6931 Slide 14 Restriction Proposal Decisions FULL LIST: http://echa.europa.eu/addressing-chemicals-of-concern/restrictions/list-of- restrictions Under Consideration: http://echa.europa.eu/web/guest/restrictions-under-consideration Registry of Intentions: http://echa.europa.eu/web/guest/registry-of-current-restriction-proposal-intentions
  • 15. info@assentcompliance.com | www.assentcompliance.com | TEL: 1(866)964-6931 Slide 15 Compliance Implications ❖ Measure Impact ➢ Substances/Mixtures ➢ Articles ➢ Business vs. Regulatory ❖ Supplier Education ❖ Yearly Audits ❖ Supplier Data Gathering, Testing and Risk Assessment ❖ FMDs?
  • 16. info@assentcompliance.com | www.assentcompliance.com | TEL: 1(866)964-6931 Slide 16 SUMMARY ❖ Waiting on the article interpretation - SVHC Communication could change significantly ❖ Many lists to track but only a select few have actual legal implications ❖ The volume of substances going into the SVHC Process (Authorisation Process) is substantial To be reactive will be too late. Assent Compliance can help you: ❏ Assess your areas of risk ❏ Assess the impact to your products ❏ Educate your suppliers ❏ Test where required ❏ Prepare for the update to the relevant documentation You must be tracking all of these changes and the impact to your products to stay in compliance, meet the needs of your customers and stay... ✓ ✓ ✓ ✓ ✓
  • 17. CANADA 5300 Canotek, Suite 30 Ottawa | ON | K1J 1A4 USA 244 Fifth Avenue | Suite 1717 New York | NY | 10001 | USA UNITED KINGDOM Longcroft House, 2-8 Victoira Avenue, Bishopgate London | UK | EC2M 4NS Krystal Cameron 1-866-964-6931 krystal.cameron@assentcompliance.com 613-882-1429