SlideShare a Scribd company logo
1 of 11
Download to read offline
UP 
1 
A101 
SIM 
1 Ref 
A101 
Ref 
1 
1 Ref 
Ref 
1 
Room name 
101 
101 
1t 
1 / A101 
NORTH ARROW 
SECTION 
SECTION NUMBER 
SHEET NUMBER 
ELEVATION NAME 
SHEET NUMBER 
INTERIOR ELEVATION MARKER 
ROOM NAME 
ROOM NUMBER 
ROOM TAG 
DOOR NUMBER 
DOOR TAG 
WINDOW LABEL 
WINDOW TAG 
SHEET NUMBER 
DETAIL NUMBER 
VIEW REFERENCE 
92 94 
96 
98 
100 
102 
104 
92 
94 
96 
98 
100 
77'-25" 
82'-24" 
N35°13'16"W 
S37°37'06"E 
KONA LANE 
6' - 0" 
SIDEWALK 
PAVING 
SITE NOTES: 
1. GRADE SITE AS INDICATED ON SITE PLAN. GRADE 
TO AVOID ON-SITE WATERRETENTION AND DRAINAGE 
ONTO ADJACENT SITES. SEE CIVIL ENGINEER'S GRADING 
PLAN. NOTIFY PROJECT DESIGNER OF ANY DISCREPANCIES. 
2. PROVIDE A MINIMUM OF 2% GRADE SLOPE AWAY FROM 
THE BUILDING PAD FOR A DISTANCE OF NOT LESS THAN 5'-0". 
SURFACE DRAINAGE OVER DRIVEWAYS AND SIDEWALKS IS 
PROHIBITED WHEN THE AREA TO BE DRAINED EXCEEDS 1/4 ACRE. 
3. ANY SURVEY MONUMENT WITHIN THE AREA OF CONSTRUCTION 
SHALL BE PRESERVED OR RESET BY A REGISTERED CIVIL ENGINEER 
OR LICENSED LAND SURVEYOR. VERIFY LOCATE AND INDICATE 
ALL PROPERTY CORNERS, SETBACKS, EASEMENTS AND BUILDING 
LOCATION CORNERS PRIOR TO FOUNDATION INSPECTION. 
4. ALL FOOTINGS SHALL REST ON FIRM NATURAL SOIL OR 
COMPACTED FILL. SEE SOILS ENGINEERS REPORT FOR GROUND 
SURFACE PREPARATION. 
SETBACK 
17' - 0" 
SETBACK 
0' - 0" 
SETBACK 
PG&E SPLICE BOX 
WATER 
METERS 
71'-11" 
75'-07" 
100'-08" 
100'-08" 
25' - 06" 
5' - 07" 
5' - 11" 
9' - 02" 
1ST FLOOR ELEVATION 
0 '- 0" = 100' 
COSUMNES RIVER COLLEGE 
ARCHITECTURAL WORKING DRAWINGS 
ARCH 329 
Martin Pauly Residential Design Project 
Scale As indicated 
Project Number 
Date 
Checked By 
Title Sheet - Site Plan 
Semester Project 
Fall 2014 
Martin Pauly 
A-0 
SHEET LIST 
Sheet Description 
A-0 Title Sheet - Site Plan 
A-1 Floor Plan 
A-2 Foundation Plan 
A-3 Exterior Elevations 
A-4 Sections 
A-5 Floor - Roof Framing Plan 
A-6 Interior Elevations 
A-8 Door & Window Schedual 
D-1 Details 
D-2 Details 
E-1 Electrical 
VICINITY MAP 
GENERAL NOTES 
1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE 2007 ADDITIONS 
OF THE CALIFORNIA BUILDING CODE (CBC), THE CALIFORNIA PLUMBING CODE (CPC), 
THE CALIFORNIA MECHANICAL CODE (CMC), AND THE CALIFORNIA ELECTRICAL 
CODE (CEC) 
2. CONSTRUCTION SHALL COMPLY WITH ALL APPLICABLE LOCAL, STATE, 
FEDERAL LAWS, CODES, ORDINANCES, RULES, REGULATIONS AND COVENANS. 
3. ALL MATERIALS SHALL CONFIRM TO STANDARD SPECIFICATIONS OF ASTM. 
4. CONTRACTOR SHALL VERIFY ALL SITE CONDITIONS, DIMENSIONS, PROPERTY 
LINES, SETBACKS AND LAYOUT PRIOR TO BEGINING WORK. 
5. NOTIFY PROJECT DESIGNER OF ANY DISCREPANCIES OR OTHER QUESTIONS 
OR INTERPRETATION OF THE DRAWINGS AND SPECIFICATIONS. 
SYMBOLS 
ABBREVIATIONS 
ADJ ADJUSTABLE 
BATT BATT INSULATION 
BLKG BLOCKING 
BM BEAM 
CAB CABINET 
CC CENTER TO CENTER 
CEM CEMENT 
CLG CEILING 
CO CLEAN OUT 
CONC CONCRETE 
CONT CONTINUOUS 
CW COLD WATER 
DBL DOUBLE 
DN DOWN 
DR DOOR 
DS DOWN SPOUT 
DS DOOR STOP 
(E) EXISTING 
ELEC ELECTRICAL 
ELEV ELEVATION 
EQUIP EQUIPMENT 
EXT EXTERIOR 
FF FINISH FLOOR 
FLR FLOOR 
FOF FACE OF FINISH 
FOS FACE OF STUD 
FRM FRAMING 
FTG FOOTING 
GYP BD GYPSUM BOARD 
HDR HEADER 
HORZ HORIZONTAL 
HT HEIGHT 
HW HOT WATER 
INSUL INSULATION 
INT INTERIOR 
MECH MECHANICAL 
MIN MINIMUM 
MR MOISTURE 
RESISTANT 
(N) NEW 
NTS NOT TO SCALE 
O/ OVER 
O.C. ON CENTER 
PL PLATE 
PLMBG PLUMBING 
PLYWD PLYWOOD 
S & P SHELF & POLE 
SC SOLID CORE 
SH SINGLE HUNG 
SIM SIMILAR 
SLDR SLIDER 
SP STRUCTURAL 
PLYWOOD 
SQ SQUARE 
SS SANITARY SEWER 
STRUCT STRUCTURAL 
TB TOWEL BAR 
TR TOWEL RING 
TT TOILET TISSUE 
HOLDER 
(TYP) TYPICAL 
UNO UNLESS NOTED 
OTHERWISE 
VENT VENTILATION 
W/ WITH 
W/O WITH OUT 
WC WATER CLOSET 
WD WOOD 
WDO WINDOW 
WH WATER HEATER 
WR WATER RESISTANT 
ELLIS RESIDENCE 
DILLION BEACH, CALIFORNIA 
1 1/8" = 1'-0" Site 
BUILDING DATA 
Occupancy Type: R-3 
Area of Building: 1327 
Building Construction Type: Type V-No hour 
PROJECT INFORMATION 
Owner: John Ellis 
Project Address: 32 Kona Ln, Dillon Beach, CA 
Assessor Parcel Number: 47-032-99-580 
APPLICABLE CODES 
2013 CALIFORNIA BUILDING CODE 
(TITLE 24 - PART 2) 
2013 CALIFORNIA MECHANICAL CODE 
(TITLE 24 - PART 4) 
2013 CALIFORNIA PLUMBING CODE 
(TITLE 24 - PART 5) 
2013 CALIFORNIA ELECTRICAL CODE 
(TITLE 24 - PART 3) 
2013 CALIFORNIA FIRE CODE 
(TITLE 24 - PART 9) 
2014 TITLE 24 - ENERGY CODE
REF. 
NIC 
UP 
C 
A-6 
1 A 
2B 
3C 
1 
A-4 
1 
A-4 
A-6 4Bath A 
2 
A-4 
F 
E 
K 
D 
23 
26 
31 
17 
5' - 10 3/8" 4' - 7 3/16" 8' - 8 5/16" 9' - 3 15/16" 
15' - 7 7/8" 10' - 6 1/2" 3' - 4 1/2" 13' - 1 3/8" 
22' - 7 9/32" 2' - 8 15/16" 8' - 11 3/8" 
5' - 0" 6' - 8 3/8" 
8' - 3" 2' - 8" 
3' - 9" 3' - 2 5/8" 
34' - 3 19/32" 
42' - 8 1/4" 
10' - 5 9/16" 18' - 0 1/4" 
28' - 5 13/16" 
8' - 0 1/8" 6' - 6 7/8" 9' - 11 1/16" 9' - 2 1/2" 4' - 2 9/16" 
14' - 7" 23' - 4 1/8" 4' - 9 1/8" 
42' - 8 1/4" 
Storage 
104 
Break Room 
103 
Work Space 
102 
Entry / Work Space 
101 
Bathroom A 
105 
0' - 07" RISE 
0' - 11" RUN 
A 
A 
A 
A 
A 
A 
C 
C 
C 
C 
3 
A-4 
16' - 0 7/8" 12' - 4 15/16" 
5' - 7 3/8" 5' - 3 1/4" 5' - 2 1/4" 5' - 8 9/16" 6' - 8 3/8" 
A-6 5Bath B 
18 19 
20 
21 
A 
25 
G 
1st Floor Exterior 
2nd Floor Exterior 
Interior Wall 
G G 
D 
A 
L 
11' - 7 1/8" 4' - 1 1/2" 12' - 4 5/8" 
10' - 10 5/8" 2' - 10 5/8" 2' - 10 5/8" 11' - 9 15/16" 
1/2" = 1'-0" 
1/2" = 1'-0" 
1/2" = 1'-0" 
6' - 2 3/8" 10' - 11 3/8" 6' - 2 3/8" 
2' - 8" 
3' - 0 9/16" 
28' - 5 13/16" 
28' - 1 1/4" 
28' - 5 13/16" 
23' - 4 1/8" 
2' - 8 1/4" 4' - 1 7/16" 2' - 10 3/16" 
9' - 1 1/8" 2' - 8 1/4" 
2' - 10 3/16" 9' - 5 15/16" 8' - 1 13/16" 2' - 10 3/16" 
Office 
203 
Waiting Area 
201 
Conference Room 
202 
Bathroom B 
204 
B 
B 
B 
B 
B 
C 
C 
C 
C 
C 
1/2" GYPSUM 
WALL BOARD 
2" RIGID 
INSULATION 
1' CONCRETE 
1/4" PLYWOOD 
SHEATHING 
3/8" PLYWOOD 
SHINGLE PANELS 
1/2" GYPSUM 
WALL BOARD 
R19 INSULATION 
1/2" PLYWOOD 
1 1/2" RIGID 
INSULATION 
3/8" PLYWOOD 
SHINGLE PANELS 
2X6 STUDS 
1/2" GYPSUM 
WALL BOARD 
R19 INSULATION 
2X4 STUDS 
2X6 STUD LAYER 
FOR PLUMBING WALLS 
COSUMNES RIVER COLLEGE 
ARCHITECTURAL WORKING DRAWINGS 
ARCH 329 
Martin Pauly Residential Design Project 
Scale As indicated 
Project Number 
Date 
Checked By 
Floor Plan 
Semester Project 
Fall 2014 
Author 
A-1 
1 1/4" = 1'-0" 1st Floor- Dimensions 
A 
B 
C 
2 1/4" = 1'-0" 2nd Floor- Dimensions 
A 
B 
C 
NOTE: 
EXTERIOR 1ST FLOOR WALLS 
EXTERIOR 2ND FLOOR WALLS 
ALL INTERIOR WALLS 
PLUMBING WALLS MADE WITH 
2X6 STUD LAYER
4" AGGREGATE BASE 
1/2" ANCHOR BOLT 
0' - 3" CLR 
2X6 SILL PLATE 
#4 REBAR 3" MIN 
FROM T.B. 
#3 REBAR 
1/2" ANCHOR BOLT 
2X4 SILL PLATE 
#4 REBAR @ 24" O.C. 
#3 REBAR @ 24" O.C. 
#3 REBAR 3" MIN 
FROM T.B. 
4" AGGREGATE BASE 
0' - 3" CLR 
4" AGGREGATE BASE 
2X12 
2X6 SILL PLATE 
3/4" ANCHOR BOLT 
#3 REBAR 
@24" O.C. 
#3 REBAR 
#3 REBAR 
@ 24" O.C. 
#4 REBAR 
0' - 6" MIN 
1' - 6" 
2' - 0" 
1 
A-4 
1 
A-4 
2 
A-4 
2 
A-4 
1 / A-2 3 / A-2 
2 / A-2 
4" CONCRETE SLAB ON GRADE 
W/ #3 REBAR @ 24" EACH WAY OVER 
10 MIL VAPOR BARRIER O/ 4" AGGREGATE BASE 
17' - 11 1/2" 
14' - 7" 
10' - 5 9/16" 
23' - 3 3/8" 
42' - 7 1/2" 
34' - 3 7/32" 
16' - 0 7/8" 
21' - 11 1/32" 
FOUNDATION NOTES: 
1. VERIFY AND CHECK ALL FOUNDATION DIMENSIONS WITHIN FLOOR PLAN BEFORE POURING OF CONCRETE 
FOOTINGS AND SLAB. SOILS EGINEER AND CONCRETE CONTRACTOR SHALL VISIT SITE TO INSPECT AND 
ACCEPT ALL EXCAVATIONS AND SITE CONDITIONS PRIOR TO STARTING WORK. 
2. COORDINATE AND VERIFY LOCATION OF ALL STRUCTURAL ELECTRICAL, MECHANICAL ROUGH-INS AS WELL 
AS MODIFICATIONS FOR FLOOR FINISHES PRIOR TO STARTING WORK. 
3. UNLESS OTHERWISE NOTED, STILL ANCHOR BOLTS SHALL BE 1/2"X10" EMBEDDED 7" INTO CONCRETE AT 
4'-0" O.C. MAXIMUM AND EQUALLY SPACED. TWO BOLTS SHALL BE PROVIDED AT ALL INTERIOR AND EXTERIOR 
FOOTINGS. CONCRETE ANCHORS OF EQUIVALENT DIAMETER AND WITHDRAWAL FORCE MAY BE SUBSTITUTED 
FOR ANCHOR BOLTS WITH APPROVAL OF THE STRUCTURAL ENGINEER. 
4. THE FOLLOWING ARE MINIMUM REQUIREMENTS FOR THE CONCRETE MIX: 
COMPRESSIVE STRENGTH: ALL CONCRETE TO TEST A MINIMUM OF 2500 PSI IN 28 DAYS UNLESS OTHERWISE 
NOTED ON FOUNDATION PLAN. 
CEMENT: ASTM C150 TYPE II OR BETTER 
WATER/CEMENT RATIO: 0.5 MAXIMUM 
WATER: FREE OF OIL, SALT, ACIDS, ETC. 
AGGREGATE: MAXIMUM SIDE 4" 
SLUMP: 4" MAXIMUM 
VIBRATION: ALL CONCRETE SHALL BE VIBRATED INTO PLACE. 
5. ALL POST AND COLUMNS MUST BE ELEVATED A MINIMUM OF 6" ABOVE GRADE AND 1" ABOVE CONCRETE 
SURFACES WITH A POST BASE APPROVED BY THE STRUCTURAL ENGINEER OR PROJECT DESIGNER. 
6. HOLD-DOWNS SHALL BE LOCATED BY CLOSE EVALUATION OF OPENING LOCATIONS, SHEAR WALL 
LOCATIONS AND FRAMING PLANS. HOLD-DOWNS SHALL NOT BE SCALED FROM FOUNDATION PLANS. 
7. ANCHOR BOLTS, HOLD-DOWNS, RODS AND STRAPS SHALL BE CAST-IN-PLACE WITH CONCRETE. 
8. SEE DETAIL SHEETS FOR TYPICAL HOLD-DOWNS AT FOUNDATIONS. 
9. HOLD-DOWN ANCHORS SHALL BE STANDARD ASTM A307 "J" OR "L" BOLTS, ASTM A36 THREADED ANCHOR BOLT 
WITH DOUBLE NUTS AND WASHER AT BOTTOM OR SIMPSON (OR EQUAL) "SSTB" ANCHOR BOLTS. REFER TO 
MANUFACTURERS SPECIFICATIONS FOR SIZE, EMBEDMENT, COVERAGE AND OTHER REQUIREMENTS. 
3 
A-4 
COSUMNES RIVER COLLEGE 
ARCHITECTURAL WORKING DRAWINGS 
ARCH 329 
Martin Pauly Residential Design Project 
Scale As indicated 
Project Number 
Date 
Checked By 
Foundation Plan 
Semester Project 
Fall 2014 
Author 
A-2 
1 1/2" = 1'-0" Callout- Interior Non Bearing Wall 
2 1/2" = 1'-0" Callout- Interior Load Bearing Wall 
3 1/2" = 1'-0" Callout- Exterior Footing 
4 1/4" = 1'-0" Foundation Plan
D H B B J 
29 
WOOD SHINGLES 
PLYWOOD SHINGLE PANELS 
2 1/8" 
1'-0" 
12' - 6 5/16" 
21' - 10 3/16" 
F 
7 
A 
B B 
G 
2 1/8" 
1'-0" 
WOOD SHINGLES 
PLYWOOD SHINGLE PANELS 
23' - 2 9/32" 
I 
1 
K 
L 
D 
2 1/8" 
WOOD SHINGLES 1'-0" 
PLYWOOD SHINGLE PANELS 
23' - 2 9/32" 
27 
E C 
28 
I 
23 
G G 
F 
E 
2 1/8" 
1'-0" 
WOOD SHINGLES 
PLYWOOD SHINGLE PANELS 
12' - 6 5/16" 
21' - 10 3/16" 
COSUMNES RIVER COLLEGE 
ARCHITECTURAL WORKING DRAWINGS 
ARCH 329 
Martin Pauly Residential Design Project 
Scale 1/8" = 1'-0" 
Project Number 
Date 
Checked By 
Exterior Elevations 
Semester Project 
Fall 2014 
Author 
A-3 
1 1/8" = 1'-0" East Elevation 
2 1/8" = 1'-0" North Elevation 
3 1/8" = 1'-0" South Elevation 
4 1/8" = 1'-0" West Elevation
3 
A-2 
3/8" PLYWD SHINGLE 
PANELS 
1 1/2" RIGID INSULATION 
1/2" PLYWOOD 
R19 INSULATION 
1/2" GYPSUM BOARD 
1/4" PLYWD 
2" RIGID INSULATION 
12" CONCRETE 
1/2" GYPSUM BOARD 
1 
0' - 6" MIN A-2 
2 
A-2 
1' AGGREGATE BASE 
INTERIER LOAD 
BEARING WALL 
1/2" GYPSUM BOARD 
R19 INSULATION 
2nd Ceiling 
19' - 0" 
2nd Floor 
10' - 0" 
1st Ceiling 
9' - 0" 
1st Floor 
0' - 0" 
Office 
203 
Conference Room 
202 
Work Space 
102 
Storage 
104 
Waiting Area 
201 
Entry / Work Space 
101 
R19 INSULATION 
R30 INSULATION 
COSUMNES RIVER COLLEGE 
ARCHITECTURAL WORKING DRAWINGS 
ARCH 329 
Martin Pauly Residential Design Project 
Scale As indicated 
Project Number 
Date 
Checked By 
Sections 
Semester Project 
Fall 2014 
Author 
A-4 
1 1/2" = 1'-0" Wall Section- Exterior Walls 
2 1/2" = 1'-0" Section- Interior Load Bearing Wall 
3 1/4" = 1'-0" Section- Building Cut
1 
A-4 
1 
A-4 
1. WALL SHEATHING : ALL NEW EXTERIOR WALLS AND OTHER WALLS NOTED ON DRAWINGS 
TO BE SHEATHED WITH A MINUMUM OF 1/2" CDX PLYWOOD OR OSB WITH 8D COMMON NAILS 
SPACED AT 6" O.C. EDGE NAILING AND 12" FIELD NAILING, BLOCKED AT PLYWOOD EDGES. 
2. FLOOR SHEATHING: FLOOR SHEATHING TO 1 1/8" COMBINATION SUBFLOOR UNDERLAYMENT 
APA 48" O.C.T & G PLYWOOD, GLUED AND NAILED WITH 10D COMMON AT 6" O.C. AT ALL SUPPORTS. 
STAGGER JOINTS. 
3. ROOF SHEATHING: ALL NEW ROOF FRAMING TO BE SHEATHED WITH A MINIMUM OF 1/2" CDX 
PLYWOOD OR OSB PLACED WITH STAGGERED JOINTS AND NAILED WITH 8D COMMON NAILS AT 6" 
O.C. EDGE NAILING AND 12" FIELD NAILING. WHERE CALIFORNIA FRAMING IS INDICATED, ROOF 
SHEATHING SHALL BE APPLIED TO BOTH UPPER AND LOWER ROOFS. 
4X8 BEAM 
3/4" PLYWOOD SHEATHING 
STAGGERED 
2X4 HEADER 
6X12 HEADER 
2X6 HEADER 
4X8 BEAM 
SHEATHING NOTES: 
NOTE: 
USE 2X4 HEADERS OVER 
OPENINGS 3'-0" OR LESS. 
LEGEND: 
HEADER 
BEAM 
NON-BEARING WALL 
LOAD BEARING WALL 
11 7/8" TGI 560 
@ 24" O.C. TYP 
2 
A-4 
3 
A-4 
1 
A-4 
1 
A-4 
RIDGE 
RIDGE 
HIP 
RIDGE 
3" / 1'-0" 3" / 1'-0" 
3" / 1'-0" 
0' - 6" TYP 
0' - 6" TYP 
3" / 1'-0" 
3" / 1'-0" 3" / 1'-0" 
3" / 1'-0" 
3" / 1'-0" 
VALLEY 
VALLEY 
VALLEY 
VALLEY 
HIP 
VALLEY 
VALLEY 
VALLEY 
- 
--- 
- 
--- 
0' - 6" TYP 
0' - 6" TYP 
2 
A-4 
NOTE: 
USE 2X4 HEADERS OVER 
OPENINGS 3'-0" OR LESS. 
6X8 HEADER 
6X8 HEADER 
6X8 HEADER 
6X6 HEADER 
2X4 HEADER 
6X8 HEADER 6X6 HEADER 
2X4 HEADER 
FRAMING NOTES: 
1. ALL BEAMS TO SUPPORTED WITH FULL BEARING BELOW. 
2. ALL FRAMING LUMBER TO BE DF #2 OR BETTER UNLESS 
OTHERWISE NOTED. 
3. ALL BEAMS AND HEADERS TO BE DF #2 OR BETTER UNLESS 
OTHER WISE NOTED. 
USE 1 KING STUD AND TRIMMER AT OPENING 6' AND SHORTER. 
USE 2 TRIMMERS AT OPENINGS LARGER THAN 6'. 
4.TRUSS MANUFACTURER US RESPONSIBLE FOR CONNECTIONS 
OF TRUSS TO TRUSS OR TRUSS TO GIRDER TRUSS. 
5. PROVIDE 1/2" CLEARANCE BETWEEN TOP PLATE OF INTERIOR 
PARTITIONS AND BOTTOM CHORD OF TRUSSES TO INSURE DESIGN 
LOADING. TRUSS MANUFACTURER SHALL LIMIT DEFLECTION TO 1/2" 
OR PROVIDE CAMBER AS NEEDED TO NOT LOAD INTERIOR NON-BEARING 
PARTITIONS. 
6. TRUSS MANUFACTURER SHALL DESIGN TRUSSES TO COMPLY WITH 
ARCHITECTURAL PLANS, INCLUDING PLATE HEIGHTS, CEILING 
CONFIGURATIONS, ROOF PITCH (VERIFY ROOF PITCH WITH 
CONTRACTOR) AND GENERAL TRUSSLAYOUT. ALL TRUSS DIMENSIONS 
AND GEOMETRY SHALL BE VERIFIED BY TRUSS MANUFACTURER PRIOR 
TO FABRICATION AND DELIVERY. TRUSSES TO BE STORED, ERECTED 
AND BRACED IN ACCORDANCE WITH THE MANUFACTURER'S 
INSTRUCTIONS. 
7. TRUSS MANUFACTURER MUST SUBMIT 4 COPIES OF TRUSS 
CALCULATIONS AND DRAWINGS TO CONTRACTOR. TRUSS CALCULATIONS 
AND DRAWINGS MUST BE APPROVED BY THE BUILDING DEPARTMENT 
PRIOR TO FABRICATIONS. 
8. UNLESS OTHERWISE NOTED, ALL EXTERIOR WALLS SHALL BE 2 X 4 
@ 16" O.C. AND INTERIOR NON-BEARING PARTITIONS SHALL BE 2 X 4 @ 
16" O.C. PLUMBING WALLS SHALL BE 2 X 6 @ A6" O.C. 
@ 24" O.C. TYP 
3/4" PLYWOOD SHEATHING 
STAGGERED 
UPPER ROOF 
LOWER ROOF 
3 
A-4 
COSUMNES RIVER COLLEGE 
ARCHITECTURAL WORKING DRAWINGS 
ARCH 329 
Martin Pauly Residential Design Project 
Scale 1/4" = 1'-0" 
Project Number 
Date 
Checked By 
Floor - Roof Framing Plan 
Semester Project 
Fall 2014 
Author 
A-5 
1 1/4" = 1'-0" 2nd Floor- Framing 
2 1/4" = 1'-0" Roof- Framing
2' - 0" 4' - 0" 2' - 0" 
0' - 4" 
8' - 7 3/4" 
6X6 CERAMIC TILE 
OWNER SELECT 
3' - 0" 1' - 6" 
1' - 9" 1' - 3" 1' - 3" 1' - 9" 
8' - 7 3/4" 
3' - 0" 0' - 4" 1' - 6" 
1' - 9" 1' - 3" 4' - 0" 6X6 CERAMIC TILE 
OWNER SELECT 
2' - 0" 1' - 3" 1' - 9" 
3' - 0" 0' - 4" 1' - 6" 
8' - 7 3/4" 
6X6 CERAMIC TILE 
OWNER SELECT 
8' - 7 3/4" 
2' - 7" 0' - 4" 1' - 6" 
4X4 CERAMIC TILE 
OWNER SELECT 
4' - 0" 2' - 10" 
8' - 6 3/8" 
2' - 7" 0' - 4" 1' - 6" 
4X4 CERAMIC TILE 
OWNER SELECT 
4' - 0" 3' - 6 3/4" 
2' - 1" TYP. 
3' - 0" 0' - 4" 
3/4" PLYWD 
3/4"X2 1/2" SPACER 
1 1/2"X1 1/2" DRAWER STOP 
3/4" PLYWD 
3/4X2 1/2" SPACER 
3/4" PLYWD 
3/4"X2 1/2" 
WEB 
2X4 @ 32" O.C. 3/4"X3 1/2" 
3/4"X2 1/2" WEB 
3/4" MAHOGANY 
3/4"X1 1/2 MAHOGANY 
3/4" LUMBER CORE 
W/MAHOGANY VENEER 
3/4"X1 1/2" MAHOGANY 
0' - 3 1/2" 
BAND EDGE 
3/4" PLYWD 
DUST PANEL 
MARBLE COUNTER TOP 
COSUMNES RIVER COLLEGE 
ARCHITECTURAL WORKING DRAWINGS 
ARCH 329 
Martin Pauly Residential Design Project 
Scale As indicated 
Project Number 
Date 
Checked By 
Interior Elevations 
Semester Project 
Fall 2014 
John Ellis 
A-6 
1 1/2" = 1'-0" A 
2 1/2" = 1'-0" B 
3 1/2" = 1'-0" C 
4 1/2" = 1'-0" Bath A 
5 1/2" = 1'-0" Bath B 
1 1/2" = 1'-0" 
Detail- Base Cabinet
WINDOWS DOORS 
A D 
E 
F 
G 
K L 
7' - 0" 
2' - 0" 
7' - 0" 
6' - 5 1/2" 
7' - 0" 
8' - 5 1/2" 
7' - 0" 
12' - 5 1/2" 
7' - 0" 
8' - 5 1/2" 
7' - 0" 
5' - 5 1/2" 
7' - 0" 
3' - 0" 
INTERIOR EXTERIOR 
6' - 11" 
3' - 6" 
7' - 3" 
3' - 6" 
SINGLE GLASS 1: 36" X 80" SINGLE DECORATIVE 2: 36" X 80" 
6' - 11" 
3' - 6" 
SINGLE FLUSH 1: 36" X 80" 
COSUMNES RIVER COLLEGE 
ARCHITECTURAL WORKING DRAWINGS 
ARCH 329 
Martin Pauly Residential Design Project 
Scale 3/8" = 1'-0" 
Project Number 
Date 
Checked By 
Door & Window Schedual 
Semester Project 
Fall 2014 
Author 
A-8 
Door Schedule 
Mark Count Height Width Thickness 
Head 
Height 
Fire 
Rating 
Type 
Comments 
1 1 6' - 8" 3' - 0" 0' - 2" 6' - 8" 
3 1 6' - 8" 3' - 0" 0' - 2" 6' - 8" 
4 1 6' - 8" 3' - 0" 0' - 2" 6' - 8" 
5 1 6' - 8" 3' - 0" 0' - 2" 6' - 8" 
6 1 6' - 8" 3' - 0" 0' - 2" 6' - 8" 
7 1 6' - 8" 3' - 0" 0' - 2" 6' - 8" 
9 1 6' - 8" 3' - 0" 0' - 2" 6' - 8" 
10 1 6' - 10" 6' - 0" 0' - 2" 6' - 10" 
13 1 6' - 8" 3' - 0" 0' - 2" 6' - 8" 
15 1 6' - 8" 3' - 0" 0' - 2" 6' - 8" 
16 1 6' - 8" 3' - 0" 0' - 2" 6' - 8" 
17 1 6' - 8" 3' - 0" 0' - 2" 6' - 8" 
18 1 6' - 8" 3' - 0" 0' - 2" 6' - 9 3/8" 
19 1 6' - 8" 3' - 0" 0' - 2" 6' - 9 3/8" 
20 1 6' - 8" 3' - 0" 0' - 2" 6' - 9 3/8" 
21 1 6' - 8" 3' - 0" 0' - 2" 6' - 9 3/4" 
23 1 6' - 8" 3' - 0" 0' - 2" 6' - 8" 
25 1 6' - 8" 3' - 0" 0' - 2" 6' - 9 3/8" 
26 1 6' - 8" 3' - 0" 0' - 2" 6' - 8" 
27 1 6' - 8" 2' - 6" 0' - 2" 6' - 8" 
28 1 6' - 8" 2' - 6" 0' - 2" 6' - 8" 
29 1 6' - 8" 2' - 6" 0' - 2" 6' - 8" 
30 1 6' - 10" 6' - 0" 0' - 2" 6' - 10" 
31 1 6' - 8" 3' - 0" 0' - 2" 6' - 8" 
Window Schedule 
Type Mark Family Count Width Height Head Height Sill Height Comments 
A Fixed 2 2' - 0" 4' - 0" 7' - 0" 3' - 0" 
B Fixed 4 3' - 0" 6' - 0" 7' - 0" 1' - 0" 
C Casement Dbl with Trim 1 4' - 0" 4' - 0" 7' - 0" 3' - 0" 
D Casement Dbl with Trim 5 6' - 0" 3' - 0" 7' - 0" 4' - 0" 
E Casement Dbl with Trim 3 8' - 0" 3' - 0" 7' - 0" 4' - 0" 
F Casement Dbl with Trim 2 12' - 0" 3' - 0" 7' - 0" 4' - 0" 
G Casement Dbl with Trim 3 8' - 0" 5' - 0" 7' - 0" 2' - 0" 
H Casement Dbl with Trim 1 10' - 0" 3' - 0" 7' - 0" 4' - 0" 
I Casement Dbl with Trim 2 5' - 0" 3' - 0" 7' - 0" 4' - 0" 
J Casement Dbl with Trim 1 2' - 8" 2' - 0" 7' - 0" 5' - 0" 
K Casement Dbl with Trim 1 5' - 0" 2' - 0" 7' - 0" 5' - 0" 
L Fixed 1 3' - 0" 5' - 0" 7' - 0" 2' - 0"
RO. 
DOOR 
2X6 DOUBLE 
TOP PLATE 
CRIPPLE 
6X6 HEADER 
2X6 STUD 
2X6 TRIMMER STUD 
2X6 SOLE PLATE 
2X6 DOUBLE 
TOP PLATE 
CRIPPLE 
6X6 HEADER 
2X6 STUD 
2X6 TRIMMER STUD 
2X6 ROUGH SILL 
CRIPPLE STUD 
2X6 SOLE PLATE 
WIDTH 
HEIGHT 
2X6 SOLE PLATE 
2X6 SPACER 
2X6 STUD 
2X6 STUD 
2X6 NAILER 
2X6 SOLE PLATE 
2X6 STUD 
2X6 SOLE PLATE 
Detail- Door Framing 
WOOD FLOOR 
2 - 2X6 RDWD 
TREADS TYP 
O/2X4 CLEAT 
W/5 #S5 WOOD 
SCREWS TO STRINGER 
2X12 
STRINGER 
1/2" GYPSUM O/ 
6" STEEL FRAMING 
1/2" SP 
3" 
Detail- Intersecting Between Studs 
2X STUD 
INSULATION 
1/2" GYPSUM 
WALL BOARD 
FASCIA 
ROOF RAFTER 
METAL STRAPS 
3/4" PLYWOOD 
WOOD SHINGLES 
CONTINUOUS 2" SOFFIT VENT 
3/4" SHEATHING 
16d PER SHEAR 
WALL SCHEDULE 
FLR SHEATH'G 
PER PLAN 
FLR JSTS 
PER PLAN 
2x BLK'G 
@ 48"o.c. 
E.N. 
Detail- Window Framing 
WALL SCHEDULE 
E.N. 
PER PLAN 
OR 16" oc 
B.N. 
SHR. WALL 
A35's PER SHEAR 
SHR. WALL 
PER PLAN 
Detail- Roof Framing 
SHEAR WALL 
PER PLANS 
E.N. 
E.N. 
2x BLK'G 
@ 48" oc 
Detail- Corner Formed With Full Studs 
CLG JSTS 
PER PLAN 
16d PER SHR. 
WALL SCHEDULE 
A35 PER SHR. 
WALL SCHED. 
COSUMNES RIVER COLLEGE 
ARCHITECTURAL WORKING DRAWINGS 
ARCH 329 
Martin Pauly Residential Design Project 
Scale As indicated 
Project Number 
Date 
Checked By 
Details 
Semester Project 
Fall 2014 
Author 
D-1 
1/2" = 1'-0" 
1/2" = 1'-0" 
3/4" = 1'-0" 
3/4" = 1'-0" 
Detail- Stair Side 
1 1/2" = 1'-0" 
1/2" = 1'-0" 
Detail- Eave 
1 1/2" = 1'-0" 
Detail- Floor 
1/4" = 1'-0" 
Detail- Ceiling 
1/4" = 1'-0"
WOOD SIDING 
Lap 
AIR BARRIERS 
ROUGH CARPENTRY 
Sheathing 
ROUGH CARPENTRY 
2x Wall 
BLANKET INSULATION 
GYPSUM BOARD ASSEMBLIES 
SHEET METAL FLASHING AND TRIM 
Head Flashing 
ROUGH CARPENTRY 
2x Header 
JOINT PROTECTION 
Cont. Around Frame, Typ. Ea. Side 
ROUGH CARPENTRY 
Wood Trim, Typ. Ea. Side 
Door Head 
WOOD DOORS 
Wood Door and Frame 
WOOD SIDING 
Lap 
AIR BARRIERS 
ROUGH CARPENTRY 
Wall Sheathing 
ROUGH CARPENTRY 
Stud Wall 
BLANKET INSULATION 
GYPSUM BOARD ASSEMBLIES 
JOINT PROTECTION 
Cont. Around Frame, Typ. Ea. Side 
MISCELLANEOUS ROUGH CARPENTRY 
1x4 Wood Trim 
WOOD DOORS 
Wood Door and Frame 
WOOD DOORS 
Wood Door and Frame 
DOOR HARDWARE 
Threshold Set in Sealant 
Finish Floor 
CAST-IN-PLACE CONCRETE 
EXPANSION CONTROL 
ROUGH CARPENTRY 
2x4 Wd. Stud Wall 
BLANKET INSULATION 
GYPSUM BOARD ASSEMBLIES 
Typ. Ea. Side 
ROUGH CARPENTRY 
2x Header 
JOINT PROTECTION 
Cont. Around Frame, Typ. Ea. Side 
ROUGH CARPENTRY 
Wood Trim, Typ. Ea. Side 
Door Head 
WOOD DOORS 
Wood Door and Frame 
ROUGH CARPENTRY 
2x4 Wd. Stud Wall 
BLANKET INSULATION 
GYPSUM BOARD ASSEMBLIES 
Typ. Ea. Side 
JOINT PROTECTION 
Cont. Around Frame, Typ. Ea. Side 
MISCELLANEOUS ROUGH CARPENTRY 
1x4 Wood Trim 
WOOD DOORS 
Wood Door and Frame 
WINDOW AS 
SPECIFIED, SEE 
WINDOW SCHEDULE 
SEALANT W/ 
BACKER ROD 
SHIM AS REQUIRED 
DBL 2X SILL 
FLASHING 
5/8" TYPE. X GYP. BD. 
WALL ASMBLY 
PER PLAN 
WINDOW AS 
SPECIFIED, SEE 
WINDOW SCHEDULE 
SEALANT W/ 
BACKER ROD 
SHIM AS REQUIRED 
DBL 2X SILL 
FLASHING 
5/8" TYPE. X GYP. BD. 
WALL ASMBLY 
PER PLAN 
COSUMNES RIVER COLLEGE 
ARCHITECTURAL WORKING DRAWINGS 
ARCH 329 
Martin Pauly Residential Design Project 
Scale As indicated 
Project Number 
Date 
Checked By 
Details 
Semester Project 
Fall 2014 
Author 
D-2 
Detail- Exterior Door Header 
1/4" = 1'-0" 
Detail- Exterior Door Jamb 
1/4" = 1'-0" 
Detail- Exterior Door Sill 
1/4" = 1'-0" 
Detail- Interior Door Header 
1/4" = 1'-0" 
Detail- Interior Door Jamb 
1/4" = 1'-0" 
Detail- Window Header 
3" = 1'-0" 
Detail- Window Sill 
3" = 1'-0"
GFCI GFCI 
GFCI GFCI 
GFCI 
GFCI 
GFCI 
GFCI GFCI 
GFCI 
2 
2 
TV 
T 
GFCI 
GFCI 
GFCI 
2 
D3 D3 
3 
3 
T 
TV 
TV 
TYPICAL SYMBOLS: 
GFCI 
2 
3 
D3 
TV 
T 
ELECTRICAL NOTES: 
1. ELECTRICAL OUTLETS SHALL BE INSTALLED IN ACCORDANCE WITH NEC ARTICLE 210-52. OUTLETS 
CONTROLLED BY A WALL SWITCH SHALL BE PROVIDED IN ACCORDANCE WITH NEC. ART 210-70 
2. CONVENIENCE OUTLETS IN BATHROOMS, KITCHENS, LAUNDRY ROOMS, GARAGES, BASEMENTS, 
OUTDOORS AND OTHER AREAS WITHIN 6' OF A SINK OR WET AREA SHALL BE GFCI PROTECTED PER 
NEC. ART. 210-8. 
3. LIGHT FIXTURES INSTALLED IN CLOSETS SHALL COMPLY WITH NEC. ART. 410-8. 
4. ELECTRICAL SYSTEM GROUND TO BE PROVIDED IN ACCORDANCE WITH NEC. ART. 250-80(B) AND 
250-81(C). 
5. PROVIDE EXHAUST FAN FOR ALL BATHROOMS AND LAUNDRYROOMS PER U.B.C. SEC. 1205 (C). 
6. PROVIDE MIN. OF 24" SEPERATION OF OUTLETS OPPOSITE SIDE OF FIRE WALLS. 
7. ALL HARDWIRED LIGHTING MUST BE HIGH EFFICACY WHEN INSTALLED IN BATHROOMS, GARAGES, 
LAUNDRY ROOMS AND UTILITY ROOMS - ON MOTION SENSOR CONTROLS THAT COMPLY WITH 2005 
CESC 150 (K) 4. EXTERIOR LIGHTING SHALL BE HIGH EFFICACY OR BOMBINED PHOTO/SENSOR/MOTION 
SENSOR CONTROLLED. CESC 150 (K) 6. 
8. KITCHENS, AT LEAST 50% OF ALL INSTALLED WATTAGE MUST BE HIGH EFFICACY LIGHTING PROVIDING 
A UNIFORM PATTERN OF ILLUMINATION AND SHALL BE SWITCH CONTROLLED SEPERATELY FROM ANY 
OTHER DECORATIVE LOW EFFICACY KITCHEN LUMINARIES CESC 150 (K) 2. 
TV OUTLET 
TELEPHONE OUTLET 
ELECTRICAL FLOOR OUTLET (VERIFY LOCATION WITH OWNER) 
DUPLEX OUTLET (0' -9 3/4" ABOVE FLOOR UNLESS OTHERWISE 
NOTED) 
DUPLEX WITH GROUND FAULT INTERRUPTED 
SWITCH 
SWITCH DOUBLE 
THREE-WAY SWITCH 
DIMMER SWITCH (THREE-WAY) 
EXHAUST FAN 
RECESSED CAN LIGHT 
TABLE LIGHT 
FLOOR LAMP 
CEILING MOUNTED LIGHT 
WALL MOUNTED LIGHT 
FLUORESCENT LIGHT 
COSUMNES RIVER COLLEGE 
ARCHITECTURAL WORKING DRAWINGS 
ARCH 329 
Martin Pauly Residential Design Project 
Scale As indicated 
Project Number 
Date 
Checked By 
Electrical 
Semester Project 
Fall 2014 
Author 
E-1 
1 1/4" = 1'-0" 1st Floor- Electrical 
2 1/4" = 1'-0" 2nd Floor- Electrical

More Related Content

What's hot (20)

Oretsky Residence - Full Permit Set
Oretsky Residence - Full Permit SetOretsky Residence - Full Permit Set
Oretsky Residence - Full Permit Set
 
Architectural drawing pdf
Architectural drawing pdfArchitectural drawing pdf
Architectural drawing pdf
 
Architectural symbols
Architectural symbolsArchitectural symbols
Architectural symbols
 
03 Curtain-wall Presentation
03 Curtain-wall Presentation03 Curtain-wall Presentation
03 Curtain-wall Presentation
 
Facade engineering
Facade engineeringFacade engineering
Facade engineering
 
Passivhaus Dissertation
Passivhaus DissertationPassivhaus Dissertation
Passivhaus Dissertation
 
Roof Framing
Roof FramingRoof Framing
Roof Framing
 
Interior Design Portfolio
Interior Design PortfolioInterior Design Portfolio
Interior Design Portfolio
 
Glass house
Glass houseGlass house
Glass house
 
Architectural working drawing
Architectural working drawingArchitectural working drawing
Architectural working drawing
 
Rolling shutter
Rolling shutterRolling shutter
Rolling shutter
 
Types of Roofing Shingles for Roofs
Types of Roofing Shingles for RoofsTypes of Roofing Shingles for Roofs
Types of Roofing Shingles for Roofs
 
Structural glazing final
Structural glazing finalStructural glazing final
Structural glazing final
 
Working drawing and detailing
Working drawing and detailingWorking drawing and detailing
Working drawing and detailing
 
Working drawings
Working drawingsWorking drawings
Working drawings
 
Restaurant Bar Design
Restaurant Bar DesignRestaurant Bar Design
Restaurant Bar Design
 
Facades and envelopes
Facades and envelopesFacades and envelopes
Facades and envelopes
 
Interior landscaping
Interior landscapingInterior landscaping
Interior landscaping
 
5110973.ppt
5110973.ppt5110973.ppt
5110973.ppt
 
Comparing Architects
Comparing ArchitectsComparing Architects
Comparing Architects
 

Viewers also liked

Kassin (Sean Portfolio Set)
Kassin (Sean Portfolio Set)Kassin (Sean Portfolio Set)
Kassin (Sean Portfolio Set)Sean Roper
 
Project Development, Construction Documents
Project Development, Construction DocumentsProject Development, Construction Documents
Project Development, Construction Documentsschang
 
SSL, FFL, SFL Abbreviations
SSL, FFL, SFL AbbreviationsSSL, FFL, SFL Abbreviations
SSL, FFL, SFL AbbreviationsEhlelt Mancha
 
Logistics abbreviation usa terms
Logistics abbreviation usa termsLogistics abbreviation usa terms
Logistics abbreviation usa termsJ. Barbato
 
Construction Documents Checklist
Construction Documents ChecklistConstruction Documents Checklist
Construction Documents ChecklistMilton Grew
 

Viewers also liked (7)

Kassin (Sean Portfolio Set)
Kassin (Sean Portfolio Set)Kassin (Sean Portfolio Set)
Kassin (Sean Portfolio Set)
 
Project Development, Construction Documents
Project Development, Construction DocumentsProject Development, Construction Documents
Project Development, Construction Documents
 
TechTown 1st Floor Renovation
TechTown 1st Floor RenovationTechTown 1st Floor Renovation
TechTown 1st Floor Renovation
 
F+m guidelines
F+m guidelinesF+m guidelines
F+m guidelines
 
SSL, FFL, SFL Abbreviations
SSL, FFL, SFL AbbreviationsSSL, FFL, SFL Abbreviations
SSL, FFL, SFL Abbreviations
 
Logistics abbreviation usa terms
Logistics abbreviation usa termsLogistics abbreviation usa terms
Logistics abbreviation usa terms
 
Construction Documents Checklist
Construction Documents ChecklistConstruction Documents Checklist
Construction Documents Checklist
 

Similar to Construction Documents Fall 2014

Building Information Modeling - Residential Fall 2014
Building Information Modeling -  Residential Fall 2014Building Information Modeling -  Residential Fall 2014
Building Information Modeling - Residential Fall 2014Martin Pauly
 
M.BERG- ARCH201-CD-SET
M.BERG- ARCH201-CD-SETM.BERG- ARCH201-CD-SET
M.BERG- ARCH201-CD-SETMarcia Berg
 
Farmers PDC Chino CA
Farmers PDC Chino CAFarmers PDC Chino CA
Farmers PDC Chino CARichard Clark
 
DCES_Classroom_Building_100_CDs.pdf
DCES_Classroom_Building_100_CDs.pdfDCES_Classroom_Building_100_CDs.pdf
DCES_Classroom_Building_100_CDs.pdfRoshelleStahl1
 
Renn CAD samples 2020
Renn CAD samples 2020Renn CAD samples 2020
Renn CAD samples 2020David Renn
 
Revit Steel Shop Drawings - Tower
Revit Steel Shop Drawings - Tower Revit Steel Shop Drawings - Tower
Revit Steel Shop Drawings - Tower Wuillian Medrano
 
Final Construction Documents
Final Construction DocumentsFinal Construction Documents
Final Construction DocumentsKaitlin Mergler
 
BUSTUBE JIG DESIGN SHEET 1
BUSTUBE JIG DESIGN SHEET 1BUSTUBE JIG DESIGN SHEET 1
BUSTUBE JIG DESIGN SHEET 1Rochelle Abrie
 
Hampton hotels architecture
Hampton hotels architectureHampton hotels architecture
Hampton hotels architecturePavan Modh
 
03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdfMin Khant Kyaw
 
03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdfMin Khant Kyaw
 
2000 Del Mar Heights Elementary Modernization
2000 Del Mar Heights Elementary Modernization2000 Del Mar Heights Elementary Modernization
2000 Del Mar Heights Elementary ModernizationJohnGartman1
 
DNB36DWDWB36SB3621SB
DNB36DWDWB36SB3621SBDNB36DWDWB36SB3621SB
DNB36DWDWB36SB3621SBclayrhr
 

Similar to Construction Documents Fall 2014 (20)

Portfolio 2016
Portfolio 2016Portfolio 2016
Portfolio 2016
 
Building Information Modeling - Residential Fall 2014
Building Information Modeling -  Residential Fall 2014Building Information Modeling -  Residential Fall 2014
Building Information Modeling - Residential Fall 2014
 
M.BERG- ARCH201-CD-SET
M.BERG- ARCH201-CD-SETM.BERG- ARCH201-CD-SET
M.BERG- ARCH201-CD-SET
 
Drafting and Design
Drafting and DesignDrafting and Design
Drafting and Design
 
Willden Residence
Willden ResidenceWillden Residence
Willden Residence
 
TOWER AS BUILT 5 FEB 15
TOWER AS BUILT 5 FEB 15TOWER AS BUILT 5 FEB 15
TOWER AS BUILT 5 FEB 15
 
71 westbourne full set
71 westbourne full set71 westbourne full set
71 westbourne full set
 
Farmers PDC Chino CA
Farmers PDC Chino CAFarmers PDC Chino CA
Farmers PDC Chino CA
 
DCES_Classroom_Building_100_CDs.pdf
DCES_Classroom_Building_100_CDs.pdfDCES_Classroom_Building_100_CDs.pdf
DCES_Classroom_Building_100_CDs.pdf
 
Woodward12-3.pdf
Woodward12-3.pdfWoodward12-3.pdf
Woodward12-3.pdf
 
Renn CAD samples 2020
Renn CAD samples 2020Renn CAD samples 2020
Renn CAD samples 2020
 
Revit Steel Shop Drawings - Tower
Revit Steel Shop Drawings - Tower Revit Steel Shop Drawings - Tower
Revit Steel Shop Drawings - Tower
 
Final Construction Documents
Final Construction DocumentsFinal Construction Documents
Final Construction Documents
 
BUSTUBE JIG DESIGN SHEET 1
BUSTUBE JIG DESIGN SHEET 1BUSTUBE JIG DESIGN SHEET 1
BUSTUBE JIG DESIGN SHEET 1
 
Lombard House
Lombard HouseLombard House
Lombard House
 
Hampton hotels architecture
Hampton hotels architectureHampton hotels architecture
Hampton hotels architecture
 
03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf
 
03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf
 
2000 Del Mar Heights Elementary Modernization
2000 Del Mar Heights Elementary Modernization2000 Del Mar Heights Elementary Modernization
2000 Del Mar Heights Elementary Modernization
 
DNB36DWDWB36SB3621SB
DNB36DWDWB36SB3621SBDNB36DWDWB36SB3621SB
DNB36DWDWB36SB3621SB
 

Construction Documents Fall 2014

  • 1. UP 1 A101 SIM 1 Ref A101 Ref 1 1 Ref Ref 1 Room name 101 101 1t 1 / A101 NORTH ARROW SECTION SECTION NUMBER SHEET NUMBER ELEVATION NAME SHEET NUMBER INTERIOR ELEVATION MARKER ROOM NAME ROOM NUMBER ROOM TAG DOOR NUMBER DOOR TAG WINDOW LABEL WINDOW TAG SHEET NUMBER DETAIL NUMBER VIEW REFERENCE 92 94 96 98 100 102 104 92 94 96 98 100 77'-25" 82'-24" N35°13'16"W S37°37'06"E KONA LANE 6' - 0" SIDEWALK PAVING SITE NOTES: 1. GRADE SITE AS INDICATED ON SITE PLAN. GRADE TO AVOID ON-SITE WATERRETENTION AND DRAINAGE ONTO ADJACENT SITES. SEE CIVIL ENGINEER'S GRADING PLAN. NOTIFY PROJECT DESIGNER OF ANY DISCREPANCIES. 2. PROVIDE A MINIMUM OF 2% GRADE SLOPE AWAY FROM THE BUILDING PAD FOR A DISTANCE OF NOT LESS THAN 5'-0". SURFACE DRAINAGE OVER DRIVEWAYS AND SIDEWALKS IS PROHIBITED WHEN THE AREA TO BE DRAINED EXCEEDS 1/4 ACRE. 3. ANY SURVEY MONUMENT WITHIN THE AREA OF CONSTRUCTION SHALL BE PRESERVED OR RESET BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR. VERIFY LOCATE AND INDICATE ALL PROPERTY CORNERS, SETBACKS, EASEMENTS AND BUILDING LOCATION CORNERS PRIOR TO FOUNDATION INSPECTION. 4. ALL FOOTINGS SHALL REST ON FIRM NATURAL SOIL OR COMPACTED FILL. SEE SOILS ENGINEERS REPORT FOR GROUND SURFACE PREPARATION. SETBACK 17' - 0" SETBACK 0' - 0" SETBACK PG&E SPLICE BOX WATER METERS 71'-11" 75'-07" 100'-08" 100'-08" 25' - 06" 5' - 07" 5' - 11" 9' - 02" 1ST FLOOR ELEVATION 0 '- 0" = 100' COSUMNES RIVER COLLEGE ARCHITECTURAL WORKING DRAWINGS ARCH 329 Martin Pauly Residential Design Project Scale As indicated Project Number Date Checked By Title Sheet - Site Plan Semester Project Fall 2014 Martin Pauly A-0 SHEET LIST Sheet Description A-0 Title Sheet - Site Plan A-1 Floor Plan A-2 Foundation Plan A-3 Exterior Elevations A-4 Sections A-5 Floor - Roof Framing Plan A-6 Interior Elevations A-8 Door & Window Schedual D-1 Details D-2 Details E-1 Electrical VICINITY MAP GENERAL NOTES 1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE 2007 ADDITIONS OF THE CALIFORNIA BUILDING CODE (CBC), THE CALIFORNIA PLUMBING CODE (CPC), THE CALIFORNIA MECHANICAL CODE (CMC), AND THE CALIFORNIA ELECTRICAL CODE (CEC) 2. CONSTRUCTION SHALL COMPLY WITH ALL APPLICABLE LOCAL, STATE, FEDERAL LAWS, CODES, ORDINANCES, RULES, REGULATIONS AND COVENANS. 3. ALL MATERIALS SHALL CONFIRM TO STANDARD SPECIFICATIONS OF ASTM. 4. CONTRACTOR SHALL VERIFY ALL SITE CONDITIONS, DIMENSIONS, PROPERTY LINES, SETBACKS AND LAYOUT PRIOR TO BEGINING WORK. 5. NOTIFY PROJECT DESIGNER OF ANY DISCREPANCIES OR OTHER QUESTIONS OR INTERPRETATION OF THE DRAWINGS AND SPECIFICATIONS. SYMBOLS ABBREVIATIONS ADJ ADJUSTABLE BATT BATT INSULATION BLKG BLOCKING BM BEAM CAB CABINET CC CENTER TO CENTER CEM CEMENT CLG CEILING CO CLEAN OUT CONC CONCRETE CONT CONTINUOUS CW COLD WATER DBL DOUBLE DN DOWN DR DOOR DS DOWN SPOUT DS DOOR STOP (E) EXISTING ELEC ELECTRICAL ELEV ELEVATION EQUIP EQUIPMENT EXT EXTERIOR FF FINISH FLOOR FLR FLOOR FOF FACE OF FINISH FOS FACE OF STUD FRM FRAMING FTG FOOTING GYP BD GYPSUM BOARD HDR HEADER HORZ HORIZONTAL HT HEIGHT HW HOT WATER INSUL INSULATION INT INTERIOR MECH MECHANICAL MIN MINIMUM MR MOISTURE RESISTANT (N) NEW NTS NOT TO SCALE O/ OVER O.C. ON CENTER PL PLATE PLMBG PLUMBING PLYWD PLYWOOD S & P SHELF & POLE SC SOLID CORE SH SINGLE HUNG SIM SIMILAR SLDR SLIDER SP STRUCTURAL PLYWOOD SQ SQUARE SS SANITARY SEWER STRUCT STRUCTURAL TB TOWEL BAR TR TOWEL RING TT TOILET TISSUE HOLDER (TYP) TYPICAL UNO UNLESS NOTED OTHERWISE VENT VENTILATION W/ WITH W/O WITH OUT WC WATER CLOSET WD WOOD WDO WINDOW WH WATER HEATER WR WATER RESISTANT ELLIS RESIDENCE DILLION BEACH, CALIFORNIA 1 1/8" = 1'-0" Site BUILDING DATA Occupancy Type: R-3 Area of Building: 1327 Building Construction Type: Type V-No hour PROJECT INFORMATION Owner: John Ellis Project Address: 32 Kona Ln, Dillon Beach, CA Assessor Parcel Number: 47-032-99-580 APPLICABLE CODES 2013 CALIFORNIA BUILDING CODE (TITLE 24 - PART 2) 2013 CALIFORNIA MECHANICAL CODE (TITLE 24 - PART 4) 2013 CALIFORNIA PLUMBING CODE (TITLE 24 - PART 5) 2013 CALIFORNIA ELECTRICAL CODE (TITLE 24 - PART 3) 2013 CALIFORNIA FIRE CODE (TITLE 24 - PART 9) 2014 TITLE 24 - ENERGY CODE
  • 2. REF. NIC UP C A-6 1 A 2B 3C 1 A-4 1 A-4 A-6 4Bath A 2 A-4 F E K D 23 26 31 17 5' - 10 3/8" 4' - 7 3/16" 8' - 8 5/16" 9' - 3 15/16" 15' - 7 7/8" 10' - 6 1/2" 3' - 4 1/2" 13' - 1 3/8" 22' - 7 9/32" 2' - 8 15/16" 8' - 11 3/8" 5' - 0" 6' - 8 3/8" 8' - 3" 2' - 8" 3' - 9" 3' - 2 5/8" 34' - 3 19/32" 42' - 8 1/4" 10' - 5 9/16" 18' - 0 1/4" 28' - 5 13/16" 8' - 0 1/8" 6' - 6 7/8" 9' - 11 1/16" 9' - 2 1/2" 4' - 2 9/16" 14' - 7" 23' - 4 1/8" 4' - 9 1/8" 42' - 8 1/4" Storage 104 Break Room 103 Work Space 102 Entry / Work Space 101 Bathroom A 105 0' - 07" RISE 0' - 11" RUN A A A A A A C C C C 3 A-4 16' - 0 7/8" 12' - 4 15/16" 5' - 7 3/8" 5' - 3 1/4" 5' - 2 1/4" 5' - 8 9/16" 6' - 8 3/8" A-6 5Bath B 18 19 20 21 A 25 G 1st Floor Exterior 2nd Floor Exterior Interior Wall G G D A L 11' - 7 1/8" 4' - 1 1/2" 12' - 4 5/8" 10' - 10 5/8" 2' - 10 5/8" 2' - 10 5/8" 11' - 9 15/16" 1/2" = 1'-0" 1/2" = 1'-0" 1/2" = 1'-0" 6' - 2 3/8" 10' - 11 3/8" 6' - 2 3/8" 2' - 8" 3' - 0 9/16" 28' - 5 13/16" 28' - 1 1/4" 28' - 5 13/16" 23' - 4 1/8" 2' - 8 1/4" 4' - 1 7/16" 2' - 10 3/16" 9' - 1 1/8" 2' - 8 1/4" 2' - 10 3/16" 9' - 5 15/16" 8' - 1 13/16" 2' - 10 3/16" Office 203 Waiting Area 201 Conference Room 202 Bathroom B 204 B B B B B C C C C C 1/2" GYPSUM WALL BOARD 2" RIGID INSULATION 1' CONCRETE 1/4" PLYWOOD SHEATHING 3/8" PLYWOOD SHINGLE PANELS 1/2" GYPSUM WALL BOARD R19 INSULATION 1/2" PLYWOOD 1 1/2" RIGID INSULATION 3/8" PLYWOOD SHINGLE PANELS 2X6 STUDS 1/2" GYPSUM WALL BOARD R19 INSULATION 2X4 STUDS 2X6 STUD LAYER FOR PLUMBING WALLS COSUMNES RIVER COLLEGE ARCHITECTURAL WORKING DRAWINGS ARCH 329 Martin Pauly Residential Design Project Scale As indicated Project Number Date Checked By Floor Plan Semester Project Fall 2014 Author A-1 1 1/4" = 1'-0" 1st Floor- Dimensions A B C 2 1/4" = 1'-0" 2nd Floor- Dimensions A B C NOTE: EXTERIOR 1ST FLOOR WALLS EXTERIOR 2ND FLOOR WALLS ALL INTERIOR WALLS PLUMBING WALLS MADE WITH 2X6 STUD LAYER
  • 3. 4" AGGREGATE BASE 1/2" ANCHOR BOLT 0' - 3" CLR 2X6 SILL PLATE #4 REBAR 3" MIN FROM T.B. #3 REBAR 1/2" ANCHOR BOLT 2X4 SILL PLATE #4 REBAR @ 24" O.C. #3 REBAR @ 24" O.C. #3 REBAR 3" MIN FROM T.B. 4" AGGREGATE BASE 0' - 3" CLR 4" AGGREGATE BASE 2X12 2X6 SILL PLATE 3/4" ANCHOR BOLT #3 REBAR @24" O.C. #3 REBAR #3 REBAR @ 24" O.C. #4 REBAR 0' - 6" MIN 1' - 6" 2' - 0" 1 A-4 1 A-4 2 A-4 2 A-4 1 / A-2 3 / A-2 2 / A-2 4" CONCRETE SLAB ON GRADE W/ #3 REBAR @ 24" EACH WAY OVER 10 MIL VAPOR BARRIER O/ 4" AGGREGATE BASE 17' - 11 1/2" 14' - 7" 10' - 5 9/16" 23' - 3 3/8" 42' - 7 1/2" 34' - 3 7/32" 16' - 0 7/8" 21' - 11 1/32" FOUNDATION NOTES: 1. VERIFY AND CHECK ALL FOUNDATION DIMENSIONS WITHIN FLOOR PLAN BEFORE POURING OF CONCRETE FOOTINGS AND SLAB. SOILS EGINEER AND CONCRETE CONTRACTOR SHALL VISIT SITE TO INSPECT AND ACCEPT ALL EXCAVATIONS AND SITE CONDITIONS PRIOR TO STARTING WORK. 2. COORDINATE AND VERIFY LOCATION OF ALL STRUCTURAL ELECTRICAL, MECHANICAL ROUGH-INS AS WELL AS MODIFICATIONS FOR FLOOR FINISHES PRIOR TO STARTING WORK. 3. UNLESS OTHERWISE NOTED, STILL ANCHOR BOLTS SHALL BE 1/2"X10" EMBEDDED 7" INTO CONCRETE AT 4'-0" O.C. MAXIMUM AND EQUALLY SPACED. TWO BOLTS SHALL BE PROVIDED AT ALL INTERIOR AND EXTERIOR FOOTINGS. CONCRETE ANCHORS OF EQUIVALENT DIAMETER AND WITHDRAWAL FORCE MAY BE SUBSTITUTED FOR ANCHOR BOLTS WITH APPROVAL OF THE STRUCTURAL ENGINEER. 4. THE FOLLOWING ARE MINIMUM REQUIREMENTS FOR THE CONCRETE MIX: COMPRESSIVE STRENGTH: ALL CONCRETE TO TEST A MINIMUM OF 2500 PSI IN 28 DAYS UNLESS OTHERWISE NOTED ON FOUNDATION PLAN. CEMENT: ASTM C150 TYPE II OR BETTER WATER/CEMENT RATIO: 0.5 MAXIMUM WATER: FREE OF OIL, SALT, ACIDS, ETC. AGGREGATE: MAXIMUM SIDE 4" SLUMP: 4" MAXIMUM VIBRATION: ALL CONCRETE SHALL BE VIBRATED INTO PLACE. 5. ALL POST AND COLUMNS MUST BE ELEVATED A MINIMUM OF 6" ABOVE GRADE AND 1" ABOVE CONCRETE SURFACES WITH A POST BASE APPROVED BY THE STRUCTURAL ENGINEER OR PROJECT DESIGNER. 6. HOLD-DOWNS SHALL BE LOCATED BY CLOSE EVALUATION OF OPENING LOCATIONS, SHEAR WALL LOCATIONS AND FRAMING PLANS. HOLD-DOWNS SHALL NOT BE SCALED FROM FOUNDATION PLANS. 7. ANCHOR BOLTS, HOLD-DOWNS, RODS AND STRAPS SHALL BE CAST-IN-PLACE WITH CONCRETE. 8. SEE DETAIL SHEETS FOR TYPICAL HOLD-DOWNS AT FOUNDATIONS. 9. HOLD-DOWN ANCHORS SHALL BE STANDARD ASTM A307 "J" OR "L" BOLTS, ASTM A36 THREADED ANCHOR BOLT WITH DOUBLE NUTS AND WASHER AT BOTTOM OR SIMPSON (OR EQUAL) "SSTB" ANCHOR BOLTS. REFER TO MANUFACTURERS SPECIFICATIONS FOR SIZE, EMBEDMENT, COVERAGE AND OTHER REQUIREMENTS. 3 A-4 COSUMNES RIVER COLLEGE ARCHITECTURAL WORKING DRAWINGS ARCH 329 Martin Pauly Residential Design Project Scale As indicated Project Number Date Checked By Foundation Plan Semester Project Fall 2014 Author A-2 1 1/2" = 1'-0" Callout- Interior Non Bearing Wall 2 1/2" = 1'-0" Callout- Interior Load Bearing Wall 3 1/2" = 1'-0" Callout- Exterior Footing 4 1/4" = 1'-0" Foundation Plan
  • 4. D H B B J 29 WOOD SHINGLES PLYWOOD SHINGLE PANELS 2 1/8" 1'-0" 12' - 6 5/16" 21' - 10 3/16" F 7 A B B G 2 1/8" 1'-0" WOOD SHINGLES PLYWOOD SHINGLE PANELS 23' - 2 9/32" I 1 K L D 2 1/8" WOOD SHINGLES 1'-0" PLYWOOD SHINGLE PANELS 23' - 2 9/32" 27 E C 28 I 23 G G F E 2 1/8" 1'-0" WOOD SHINGLES PLYWOOD SHINGLE PANELS 12' - 6 5/16" 21' - 10 3/16" COSUMNES RIVER COLLEGE ARCHITECTURAL WORKING DRAWINGS ARCH 329 Martin Pauly Residential Design Project Scale 1/8" = 1'-0" Project Number Date Checked By Exterior Elevations Semester Project Fall 2014 Author A-3 1 1/8" = 1'-0" East Elevation 2 1/8" = 1'-0" North Elevation 3 1/8" = 1'-0" South Elevation 4 1/8" = 1'-0" West Elevation
  • 5. 3 A-2 3/8" PLYWD SHINGLE PANELS 1 1/2" RIGID INSULATION 1/2" PLYWOOD R19 INSULATION 1/2" GYPSUM BOARD 1/4" PLYWD 2" RIGID INSULATION 12" CONCRETE 1/2" GYPSUM BOARD 1 0' - 6" MIN A-2 2 A-2 1' AGGREGATE BASE INTERIER LOAD BEARING WALL 1/2" GYPSUM BOARD R19 INSULATION 2nd Ceiling 19' - 0" 2nd Floor 10' - 0" 1st Ceiling 9' - 0" 1st Floor 0' - 0" Office 203 Conference Room 202 Work Space 102 Storage 104 Waiting Area 201 Entry / Work Space 101 R19 INSULATION R30 INSULATION COSUMNES RIVER COLLEGE ARCHITECTURAL WORKING DRAWINGS ARCH 329 Martin Pauly Residential Design Project Scale As indicated Project Number Date Checked By Sections Semester Project Fall 2014 Author A-4 1 1/2" = 1'-0" Wall Section- Exterior Walls 2 1/2" = 1'-0" Section- Interior Load Bearing Wall 3 1/4" = 1'-0" Section- Building Cut
  • 6. 1 A-4 1 A-4 1. WALL SHEATHING : ALL NEW EXTERIOR WALLS AND OTHER WALLS NOTED ON DRAWINGS TO BE SHEATHED WITH A MINUMUM OF 1/2" CDX PLYWOOD OR OSB WITH 8D COMMON NAILS SPACED AT 6" O.C. EDGE NAILING AND 12" FIELD NAILING, BLOCKED AT PLYWOOD EDGES. 2. FLOOR SHEATHING: FLOOR SHEATHING TO 1 1/8" COMBINATION SUBFLOOR UNDERLAYMENT APA 48" O.C.T & G PLYWOOD, GLUED AND NAILED WITH 10D COMMON AT 6" O.C. AT ALL SUPPORTS. STAGGER JOINTS. 3. ROOF SHEATHING: ALL NEW ROOF FRAMING TO BE SHEATHED WITH A MINIMUM OF 1/2" CDX PLYWOOD OR OSB PLACED WITH STAGGERED JOINTS AND NAILED WITH 8D COMMON NAILS AT 6" O.C. EDGE NAILING AND 12" FIELD NAILING. WHERE CALIFORNIA FRAMING IS INDICATED, ROOF SHEATHING SHALL BE APPLIED TO BOTH UPPER AND LOWER ROOFS. 4X8 BEAM 3/4" PLYWOOD SHEATHING STAGGERED 2X4 HEADER 6X12 HEADER 2X6 HEADER 4X8 BEAM SHEATHING NOTES: NOTE: USE 2X4 HEADERS OVER OPENINGS 3'-0" OR LESS. LEGEND: HEADER BEAM NON-BEARING WALL LOAD BEARING WALL 11 7/8" TGI 560 @ 24" O.C. TYP 2 A-4 3 A-4 1 A-4 1 A-4 RIDGE RIDGE HIP RIDGE 3" / 1'-0" 3" / 1'-0" 3" / 1'-0" 0' - 6" TYP 0' - 6" TYP 3" / 1'-0" 3" / 1'-0" 3" / 1'-0" 3" / 1'-0" 3" / 1'-0" VALLEY VALLEY VALLEY VALLEY HIP VALLEY VALLEY VALLEY - --- - --- 0' - 6" TYP 0' - 6" TYP 2 A-4 NOTE: USE 2X4 HEADERS OVER OPENINGS 3'-0" OR LESS. 6X8 HEADER 6X8 HEADER 6X8 HEADER 6X6 HEADER 2X4 HEADER 6X8 HEADER 6X6 HEADER 2X4 HEADER FRAMING NOTES: 1. ALL BEAMS TO SUPPORTED WITH FULL BEARING BELOW. 2. ALL FRAMING LUMBER TO BE DF #2 OR BETTER UNLESS OTHERWISE NOTED. 3. ALL BEAMS AND HEADERS TO BE DF #2 OR BETTER UNLESS OTHER WISE NOTED. USE 1 KING STUD AND TRIMMER AT OPENING 6' AND SHORTER. USE 2 TRIMMERS AT OPENINGS LARGER THAN 6'. 4.TRUSS MANUFACTURER US RESPONSIBLE FOR CONNECTIONS OF TRUSS TO TRUSS OR TRUSS TO GIRDER TRUSS. 5. PROVIDE 1/2" CLEARANCE BETWEEN TOP PLATE OF INTERIOR PARTITIONS AND BOTTOM CHORD OF TRUSSES TO INSURE DESIGN LOADING. TRUSS MANUFACTURER SHALL LIMIT DEFLECTION TO 1/2" OR PROVIDE CAMBER AS NEEDED TO NOT LOAD INTERIOR NON-BEARING PARTITIONS. 6. TRUSS MANUFACTURER SHALL DESIGN TRUSSES TO COMPLY WITH ARCHITECTURAL PLANS, INCLUDING PLATE HEIGHTS, CEILING CONFIGURATIONS, ROOF PITCH (VERIFY ROOF PITCH WITH CONTRACTOR) AND GENERAL TRUSSLAYOUT. ALL TRUSS DIMENSIONS AND GEOMETRY SHALL BE VERIFIED BY TRUSS MANUFACTURER PRIOR TO FABRICATION AND DELIVERY. TRUSSES TO BE STORED, ERECTED AND BRACED IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS. 7. TRUSS MANUFACTURER MUST SUBMIT 4 COPIES OF TRUSS CALCULATIONS AND DRAWINGS TO CONTRACTOR. TRUSS CALCULATIONS AND DRAWINGS MUST BE APPROVED BY THE BUILDING DEPARTMENT PRIOR TO FABRICATIONS. 8. UNLESS OTHERWISE NOTED, ALL EXTERIOR WALLS SHALL BE 2 X 4 @ 16" O.C. AND INTERIOR NON-BEARING PARTITIONS SHALL BE 2 X 4 @ 16" O.C. PLUMBING WALLS SHALL BE 2 X 6 @ A6" O.C. @ 24" O.C. TYP 3/4" PLYWOOD SHEATHING STAGGERED UPPER ROOF LOWER ROOF 3 A-4 COSUMNES RIVER COLLEGE ARCHITECTURAL WORKING DRAWINGS ARCH 329 Martin Pauly Residential Design Project Scale 1/4" = 1'-0" Project Number Date Checked By Floor - Roof Framing Plan Semester Project Fall 2014 Author A-5 1 1/4" = 1'-0" 2nd Floor- Framing 2 1/4" = 1'-0" Roof- Framing
  • 7. 2' - 0" 4' - 0" 2' - 0" 0' - 4" 8' - 7 3/4" 6X6 CERAMIC TILE OWNER SELECT 3' - 0" 1' - 6" 1' - 9" 1' - 3" 1' - 3" 1' - 9" 8' - 7 3/4" 3' - 0" 0' - 4" 1' - 6" 1' - 9" 1' - 3" 4' - 0" 6X6 CERAMIC TILE OWNER SELECT 2' - 0" 1' - 3" 1' - 9" 3' - 0" 0' - 4" 1' - 6" 8' - 7 3/4" 6X6 CERAMIC TILE OWNER SELECT 8' - 7 3/4" 2' - 7" 0' - 4" 1' - 6" 4X4 CERAMIC TILE OWNER SELECT 4' - 0" 2' - 10" 8' - 6 3/8" 2' - 7" 0' - 4" 1' - 6" 4X4 CERAMIC TILE OWNER SELECT 4' - 0" 3' - 6 3/4" 2' - 1" TYP. 3' - 0" 0' - 4" 3/4" PLYWD 3/4"X2 1/2" SPACER 1 1/2"X1 1/2" DRAWER STOP 3/4" PLYWD 3/4X2 1/2" SPACER 3/4" PLYWD 3/4"X2 1/2" WEB 2X4 @ 32" O.C. 3/4"X3 1/2" 3/4"X2 1/2" WEB 3/4" MAHOGANY 3/4"X1 1/2 MAHOGANY 3/4" LUMBER CORE W/MAHOGANY VENEER 3/4"X1 1/2" MAHOGANY 0' - 3 1/2" BAND EDGE 3/4" PLYWD DUST PANEL MARBLE COUNTER TOP COSUMNES RIVER COLLEGE ARCHITECTURAL WORKING DRAWINGS ARCH 329 Martin Pauly Residential Design Project Scale As indicated Project Number Date Checked By Interior Elevations Semester Project Fall 2014 John Ellis A-6 1 1/2" = 1'-0" A 2 1/2" = 1'-0" B 3 1/2" = 1'-0" C 4 1/2" = 1'-0" Bath A 5 1/2" = 1'-0" Bath B 1 1/2" = 1'-0" Detail- Base Cabinet
  • 8. WINDOWS DOORS A D E F G K L 7' - 0" 2' - 0" 7' - 0" 6' - 5 1/2" 7' - 0" 8' - 5 1/2" 7' - 0" 12' - 5 1/2" 7' - 0" 8' - 5 1/2" 7' - 0" 5' - 5 1/2" 7' - 0" 3' - 0" INTERIOR EXTERIOR 6' - 11" 3' - 6" 7' - 3" 3' - 6" SINGLE GLASS 1: 36" X 80" SINGLE DECORATIVE 2: 36" X 80" 6' - 11" 3' - 6" SINGLE FLUSH 1: 36" X 80" COSUMNES RIVER COLLEGE ARCHITECTURAL WORKING DRAWINGS ARCH 329 Martin Pauly Residential Design Project Scale 3/8" = 1'-0" Project Number Date Checked By Door & Window Schedual Semester Project Fall 2014 Author A-8 Door Schedule Mark Count Height Width Thickness Head Height Fire Rating Type Comments 1 1 6' - 8" 3' - 0" 0' - 2" 6' - 8" 3 1 6' - 8" 3' - 0" 0' - 2" 6' - 8" 4 1 6' - 8" 3' - 0" 0' - 2" 6' - 8" 5 1 6' - 8" 3' - 0" 0' - 2" 6' - 8" 6 1 6' - 8" 3' - 0" 0' - 2" 6' - 8" 7 1 6' - 8" 3' - 0" 0' - 2" 6' - 8" 9 1 6' - 8" 3' - 0" 0' - 2" 6' - 8" 10 1 6' - 10" 6' - 0" 0' - 2" 6' - 10" 13 1 6' - 8" 3' - 0" 0' - 2" 6' - 8" 15 1 6' - 8" 3' - 0" 0' - 2" 6' - 8" 16 1 6' - 8" 3' - 0" 0' - 2" 6' - 8" 17 1 6' - 8" 3' - 0" 0' - 2" 6' - 8" 18 1 6' - 8" 3' - 0" 0' - 2" 6' - 9 3/8" 19 1 6' - 8" 3' - 0" 0' - 2" 6' - 9 3/8" 20 1 6' - 8" 3' - 0" 0' - 2" 6' - 9 3/8" 21 1 6' - 8" 3' - 0" 0' - 2" 6' - 9 3/4" 23 1 6' - 8" 3' - 0" 0' - 2" 6' - 8" 25 1 6' - 8" 3' - 0" 0' - 2" 6' - 9 3/8" 26 1 6' - 8" 3' - 0" 0' - 2" 6' - 8" 27 1 6' - 8" 2' - 6" 0' - 2" 6' - 8" 28 1 6' - 8" 2' - 6" 0' - 2" 6' - 8" 29 1 6' - 8" 2' - 6" 0' - 2" 6' - 8" 30 1 6' - 10" 6' - 0" 0' - 2" 6' - 10" 31 1 6' - 8" 3' - 0" 0' - 2" 6' - 8" Window Schedule Type Mark Family Count Width Height Head Height Sill Height Comments A Fixed 2 2' - 0" 4' - 0" 7' - 0" 3' - 0" B Fixed 4 3' - 0" 6' - 0" 7' - 0" 1' - 0" C Casement Dbl with Trim 1 4' - 0" 4' - 0" 7' - 0" 3' - 0" D Casement Dbl with Trim 5 6' - 0" 3' - 0" 7' - 0" 4' - 0" E Casement Dbl with Trim 3 8' - 0" 3' - 0" 7' - 0" 4' - 0" F Casement Dbl with Trim 2 12' - 0" 3' - 0" 7' - 0" 4' - 0" G Casement Dbl with Trim 3 8' - 0" 5' - 0" 7' - 0" 2' - 0" H Casement Dbl with Trim 1 10' - 0" 3' - 0" 7' - 0" 4' - 0" I Casement Dbl with Trim 2 5' - 0" 3' - 0" 7' - 0" 4' - 0" J Casement Dbl with Trim 1 2' - 8" 2' - 0" 7' - 0" 5' - 0" K Casement Dbl with Trim 1 5' - 0" 2' - 0" 7' - 0" 5' - 0" L Fixed 1 3' - 0" 5' - 0" 7' - 0" 2' - 0"
  • 9. RO. DOOR 2X6 DOUBLE TOP PLATE CRIPPLE 6X6 HEADER 2X6 STUD 2X6 TRIMMER STUD 2X6 SOLE PLATE 2X6 DOUBLE TOP PLATE CRIPPLE 6X6 HEADER 2X6 STUD 2X6 TRIMMER STUD 2X6 ROUGH SILL CRIPPLE STUD 2X6 SOLE PLATE WIDTH HEIGHT 2X6 SOLE PLATE 2X6 SPACER 2X6 STUD 2X6 STUD 2X6 NAILER 2X6 SOLE PLATE 2X6 STUD 2X6 SOLE PLATE Detail- Door Framing WOOD FLOOR 2 - 2X6 RDWD TREADS TYP O/2X4 CLEAT W/5 #S5 WOOD SCREWS TO STRINGER 2X12 STRINGER 1/2" GYPSUM O/ 6" STEEL FRAMING 1/2" SP 3" Detail- Intersecting Between Studs 2X STUD INSULATION 1/2" GYPSUM WALL BOARD FASCIA ROOF RAFTER METAL STRAPS 3/4" PLYWOOD WOOD SHINGLES CONTINUOUS 2" SOFFIT VENT 3/4" SHEATHING 16d PER SHEAR WALL SCHEDULE FLR SHEATH'G PER PLAN FLR JSTS PER PLAN 2x BLK'G @ 48"o.c. E.N. Detail- Window Framing WALL SCHEDULE E.N. PER PLAN OR 16" oc B.N. SHR. WALL A35's PER SHEAR SHR. WALL PER PLAN Detail- Roof Framing SHEAR WALL PER PLANS E.N. E.N. 2x BLK'G @ 48" oc Detail- Corner Formed With Full Studs CLG JSTS PER PLAN 16d PER SHR. WALL SCHEDULE A35 PER SHR. WALL SCHED. COSUMNES RIVER COLLEGE ARCHITECTURAL WORKING DRAWINGS ARCH 329 Martin Pauly Residential Design Project Scale As indicated Project Number Date Checked By Details Semester Project Fall 2014 Author D-1 1/2" = 1'-0" 1/2" = 1'-0" 3/4" = 1'-0" 3/4" = 1'-0" Detail- Stair Side 1 1/2" = 1'-0" 1/2" = 1'-0" Detail- Eave 1 1/2" = 1'-0" Detail- Floor 1/4" = 1'-0" Detail- Ceiling 1/4" = 1'-0"
  • 10. WOOD SIDING Lap AIR BARRIERS ROUGH CARPENTRY Sheathing ROUGH CARPENTRY 2x Wall BLANKET INSULATION GYPSUM BOARD ASSEMBLIES SHEET METAL FLASHING AND TRIM Head Flashing ROUGH CARPENTRY 2x Header JOINT PROTECTION Cont. Around Frame, Typ. Ea. Side ROUGH CARPENTRY Wood Trim, Typ. Ea. Side Door Head WOOD DOORS Wood Door and Frame WOOD SIDING Lap AIR BARRIERS ROUGH CARPENTRY Wall Sheathing ROUGH CARPENTRY Stud Wall BLANKET INSULATION GYPSUM BOARD ASSEMBLIES JOINT PROTECTION Cont. Around Frame, Typ. Ea. Side MISCELLANEOUS ROUGH CARPENTRY 1x4 Wood Trim WOOD DOORS Wood Door and Frame WOOD DOORS Wood Door and Frame DOOR HARDWARE Threshold Set in Sealant Finish Floor CAST-IN-PLACE CONCRETE EXPANSION CONTROL ROUGH CARPENTRY 2x4 Wd. Stud Wall BLANKET INSULATION GYPSUM BOARD ASSEMBLIES Typ. Ea. Side ROUGH CARPENTRY 2x Header JOINT PROTECTION Cont. Around Frame, Typ. Ea. Side ROUGH CARPENTRY Wood Trim, Typ. Ea. Side Door Head WOOD DOORS Wood Door and Frame ROUGH CARPENTRY 2x4 Wd. Stud Wall BLANKET INSULATION GYPSUM BOARD ASSEMBLIES Typ. Ea. Side JOINT PROTECTION Cont. Around Frame, Typ. Ea. Side MISCELLANEOUS ROUGH CARPENTRY 1x4 Wood Trim WOOD DOORS Wood Door and Frame WINDOW AS SPECIFIED, SEE WINDOW SCHEDULE SEALANT W/ BACKER ROD SHIM AS REQUIRED DBL 2X SILL FLASHING 5/8" TYPE. X GYP. BD. WALL ASMBLY PER PLAN WINDOW AS SPECIFIED, SEE WINDOW SCHEDULE SEALANT W/ BACKER ROD SHIM AS REQUIRED DBL 2X SILL FLASHING 5/8" TYPE. X GYP. BD. WALL ASMBLY PER PLAN COSUMNES RIVER COLLEGE ARCHITECTURAL WORKING DRAWINGS ARCH 329 Martin Pauly Residential Design Project Scale As indicated Project Number Date Checked By Details Semester Project Fall 2014 Author D-2 Detail- Exterior Door Header 1/4" = 1'-0" Detail- Exterior Door Jamb 1/4" = 1'-0" Detail- Exterior Door Sill 1/4" = 1'-0" Detail- Interior Door Header 1/4" = 1'-0" Detail- Interior Door Jamb 1/4" = 1'-0" Detail- Window Header 3" = 1'-0" Detail- Window Sill 3" = 1'-0"
  • 11. GFCI GFCI GFCI GFCI GFCI GFCI GFCI GFCI GFCI GFCI 2 2 TV T GFCI GFCI GFCI 2 D3 D3 3 3 T TV TV TYPICAL SYMBOLS: GFCI 2 3 D3 TV T ELECTRICAL NOTES: 1. ELECTRICAL OUTLETS SHALL BE INSTALLED IN ACCORDANCE WITH NEC ARTICLE 210-52. OUTLETS CONTROLLED BY A WALL SWITCH SHALL BE PROVIDED IN ACCORDANCE WITH NEC. ART 210-70 2. CONVENIENCE OUTLETS IN BATHROOMS, KITCHENS, LAUNDRY ROOMS, GARAGES, BASEMENTS, OUTDOORS AND OTHER AREAS WITHIN 6' OF A SINK OR WET AREA SHALL BE GFCI PROTECTED PER NEC. ART. 210-8. 3. LIGHT FIXTURES INSTALLED IN CLOSETS SHALL COMPLY WITH NEC. ART. 410-8. 4. ELECTRICAL SYSTEM GROUND TO BE PROVIDED IN ACCORDANCE WITH NEC. ART. 250-80(B) AND 250-81(C). 5. PROVIDE EXHAUST FAN FOR ALL BATHROOMS AND LAUNDRYROOMS PER U.B.C. SEC. 1205 (C). 6. PROVIDE MIN. OF 24" SEPERATION OF OUTLETS OPPOSITE SIDE OF FIRE WALLS. 7. ALL HARDWIRED LIGHTING MUST BE HIGH EFFICACY WHEN INSTALLED IN BATHROOMS, GARAGES, LAUNDRY ROOMS AND UTILITY ROOMS - ON MOTION SENSOR CONTROLS THAT COMPLY WITH 2005 CESC 150 (K) 4. EXTERIOR LIGHTING SHALL BE HIGH EFFICACY OR BOMBINED PHOTO/SENSOR/MOTION SENSOR CONTROLLED. CESC 150 (K) 6. 8. KITCHENS, AT LEAST 50% OF ALL INSTALLED WATTAGE MUST BE HIGH EFFICACY LIGHTING PROVIDING A UNIFORM PATTERN OF ILLUMINATION AND SHALL BE SWITCH CONTROLLED SEPERATELY FROM ANY OTHER DECORATIVE LOW EFFICACY KITCHEN LUMINARIES CESC 150 (K) 2. TV OUTLET TELEPHONE OUTLET ELECTRICAL FLOOR OUTLET (VERIFY LOCATION WITH OWNER) DUPLEX OUTLET (0' -9 3/4" ABOVE FLOOR UNLESS OTHERWISE NOTED) DUPLEX WITH GROUND FAULT INTERRUPTED SWITCH SWITCH DOUBLE THREE-WAY SWITCH DIMMER SWITCH (THREE-WAY) EXHAUST FAN RECESSED CAN LIGHT TABLE LIGHT FLOOR LAMP CEILING MOUNTED LIGHT WALL MOUNTED LIGHT FLUORESCENT LIGHT COSUMNES RIVER COLLEGE ARCHITECTURAL WORKING DRAWINGS ARCH 329 Martin Pauly Residential Design Project Scale As indicated Project Number Date Checked By Electrical Semester Project Fall 2014 Author E-1 1 1/4" = 1'-0" 1st Floor- Electrical 2 1/4" = 1'-0" 2nd Floor- Electrical