Utica Marcellus Texas Pipeline Project Fact Sheet
Upcoming SlideShare
Loading in...5
×
 

Utica Marcellus Texas Pipeline Project Fact Sheet

on

  • 548 views

A summary of facts and a map for the proposed Kinder Morgan/MarkWest Energy y-grade natural gas liquids pipeline that will run from Pennsylvania and Ohio (Marcellus & Utica Shale) all the way to the ...

A summary of facts and a map for the proposed Kinder Morgan/MarkWest Energy y-grade natural gas liquids pipeline that will run from Pennsylvania and Ohio (Marcellus & Utica Shale) all the way to the Gulf Coast. The project will convert some 900 miles of pipeline in the Tennessee Gas Pipeline system and build another 200 miles of new pipeline.

Statistics

Views

Total Views
548
Views on SlideShare
341
Embed Views
207

Actions

Likes
0
Downloads
2
Comments
0

3 Embeds 207

http://marcellusdrilling.com 203
http://www.google.com 3
http://www.slideee.com 1

Accessibility

Upload Details

Uploaded via as Adobe PDF

Usage Rights

CC Attribution-ShareAlike LicenseCC Attribution-ShareAlike License

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Utica Marcellus Texas Pipeline Project Fact Sheet Utica Marcellus Texas Pipeline Project Fact Sheet Document Transcript

  • June 2014 Utica Marcellus Texas Pipeline Project Fact Sheet Project Overview: • Kinder Morgan Energy Partners, L.P. (Kinder Morgan), and MarkWest Utica EMG, L.L.C. (MarkWest Utica EMG), a joint venture between MarkWest Energy Partners, L.P. (MarkWest) and The Energy and Minerals Group (EMG), have signed a letter of intent to form a midstream joint venture (JV) to pursue a critical new project to support producers in the Utica and Marcellus shales in Ohio, Pennsylvania and West Virginia. • The proposed UMTP project will enable the transportation of natural gas liquids (NGL) from Uhrichsville, Ohio area to existing facilities near Mont Belvieu, Texas. NGL Pipeline: • The project consists of the development of a natural gas liquids (NGL) pipeline from the JV processing complex to Gulf Coast facilities through the conversion of over 1,005 miles of Kinder Morgan’s 24-inch and 26-inch Tennessee Gas Pipeline system currently in natural gas service from Mercer County, Pennsylvania to Natchitoches, La. • The project also includes the construction of approximately 200 miles of new NGL pipeline from Natchitoches to Mont Belvieu, Texas and/or south La. • The project also includes the construction of approximately 160 miles of new natural gas and NGL laterals and interconnects in Ohio, Pennsylvania, West Virginia, Tennessee, Kentucky, and Mississippi, which will supply alternate sources to the existing pipeline. • The NGL pipeline would have an initial capacity of 150,000 barrels-per- day, and be expandable to 400,000 bpd with the addition of pump stations. • Kinder Morgan would own at least 75 percent of the NGL pipeline and MarkWest Utica EMG would have the option to invest up to 25 percent. Kinder Morgan would operate the pipeline. Projected Timeline: • Agency and Public Outreach Meetings – Ongoing • Route Selection and Permit Preparation – Ongoing • Planned Full In-Service Date – Second Quarter 2017
  • June 2014