8/15/12 Obj. 4 Future COM & Space Studies Part II

371 views
341 views

Published on

Published in: Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
371
On SlideShare
0
From Embeds
0
Number of Embeds
179
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide
  • \n
  • \n
  • \n
  • \n
  • \n
  • \n
  • \n
  • \n
  • \n
  • \n
  • \n
  • \n
  • \n
  • 8/15/12 Obj. 4 Future COM & Space Studies Part II

    1. 1. Golden Gate University Objective 4: Future Conceptual Organizational Model 8.15.12
    2. 2. Space Study: Individual & Collaborative Seating
    3. 3. Objective 4: University Library Conceptual Programming Average gate access/day (2011-2012): 262 Observed Library Use - Individuals & Groups* *2+ individuals working together 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM 7:00 PM 8:00 PM 9:00 PM Groups 900 750 600No. of Individuals 450 12/5/11 – 5:00 PM; 121 individuals 300 150 0 11 1 1 11 1 11 11 11 11 11 1 1 12 12 12 12 12 01 01 01 01 01 20 20 20 20 20 20 20 20 20 20 20 20 ,2 ,2 ,2 ,2 ,2 8, 9, 5, , 2, , , , , 9, , 6, 10 23 23 20 14 29 11 29 14 28 22 l2 p ct ov b ar g g p ct ov ov c c n n b Se Fe Ju O M N De De Ja Ja Au Au Se Fe O N N Date proprietary and confidential Golden Gate University SF Remodel Project - Phase 7: Master Planning & Programming MKTHINK 3
    4. 4. Objective 4: University Library Conceptual Programming Existing Seat Count Total Group Interaction Seats: 251 250 Total enrollment: 2,368 200 Non-law enrollment (hybrid, in-person): 1,526 Law enrollment: 842No. of Individuals 150 Total seating: 927 (1:3) University Library seating: 169 (1:14) 100 (44 carrels) 436 seats Law Library seating: 491 (1:2) General seating (incl. 40 Jessie): 267 (1:9) 50 Average class load: 725 0 8 AM 10 AM 12 PM 2 PM 4 PM 6 PM Time Plaza 2 3 4 5 6 Jessie Data taken from 3/28/12 (W), 4/3/12 (Tu), 4/12/12 (Th) proprietary and confidential Golden Gate University SF Remodel Project - Phase 7: Master Planning & Programming MKTHINK 4
    5. 5. Objective 4: University Library Conceptual Programming Seating Options 20% of average class load Option 1 Option 2 Option 3 Collaborative: 21 (15%) Collaborative: 44 (30%) Collaborative: 80 (55%) Collaborative Individual: 44 (30%) Individual: 80 (55%) Individual: 21 (15%) Group study room: 80 (55%) Group study room: 21 (15%) Group study room: 44 (30%) Seats: 145 40% of average class load Option 1 Option 2 Option 3 Collaborative: 44 (15%) Collaborative: 87 (30%) Collaborative: 160 (55%) Individual: 87 (30%) Individual: 160 (55%) Individual: 44 (15%) Group study room: 160 (55%) Group study room: 44 (15%) Group study room: 87 (30%) Seats: 290 Individual 60% of average class load Option 1 Option 2 Option 3 Collaborative: 65 (15%) Collaborative: 131 (30%) Collaborative: 239 (55%) Individual: 131 (30%) Individual: 239 (55%) Individual: 65 (15%) Group study room: 239 (55%) Group study room: 65 (15%) Group study room: 131 (30%) Seats: 435 Group study room proprietary and confidentialGolden Gate University SF Remodel Project - Phase 7: Master Planning & Programming MKTHINK 5
    6. 6. Space Study: High-Density Book Storage
    7. 7. Objective 4: University Library Conceptual Programming Print Volumes Projections Current total print volumes: 74,810 Assumed growth rate per year: 0% (0 volumes) Projected print volumes in 10 years: 68,810 (-6,000 volumes) Reference collection (15%) 10,322 (520 SF of standard shelving required, excluding perimeter) Circulating collection (85%) 58,489 proprietary and confidentialGolden Gate University SF Remodel Project - Phase 7: Master Planning & Programming MKTHINK 7
    8. 8. Objective 4: University Library Conceptual Programming High-Density Book Storage Option: Multi-Level Standard Shelving FLOOR 1 1,334 SF Perimeter FLOOR 2 1,334 SF Number Unit Shelves Volumes SF per Total SF % of SF per LF Collection of Shelves Height Depth per LF unit required Floor 1 6 82” 10’ 8 2.48 0.4 1,473 91% Floor 2 6 82” 10’ 8 2.48 0.4 1,473 proprietary and confidentialGolden Gate University SF Remodel Project - Phase 7: Master Planning & Programming MKTHINK 8
    9. 9. Objective 4: University Library Conceptual Programming High-Density Book Storage Option: Single Level Compact Shelving FLOOR 1 1,334 SF Perimeter Number Unit Shelves Volumes SF per Total SF % of SF per LF Collection of Shelves Height Depth per LF unit required Floor 1 7 84” 12’ 8 5.16 0.19 1,417 94% proprietary and confidentialGolden Gate University SF Remodel Project - Phase 7: Master Planning & Programming MKTHINK 9
    10. 10. Objective 4: University Library Conceptual Programming High-Density Book Storage Option: Multi-Level Compact Shelving FLOOR 1 1,334 SF Perimeter FLOOR 2 1,334 SF Number Unit Shelves Volumes SF per Total SF % of SF per LF Collection of Shelves Height Depth per LF unit required Floor 1 6 82” 10’ 8 2.48 0.4 709 190% Floor 2 6 82” 10’ 8 2.48 0.4 709 proprietary and confidentialGolden Gate University SF Remodel Project - Phase 7: Master Planning & Programming MKTHINK 10
    11. 11. Objective 4: University Library Conceptual Programming Future Conceptual Organizational Model Silence Noisy Staff Lounge/ Workroom Book Instruction Room Library Staff Storage Gathering/ Meeting/ Lounge/ Storage Individual & Book Browsing QUIET ZON E Reference/ Collaborative Circulation Study Space Desk Individual Learning Support Study Space Services Restrooms Collaborative Study Rooms Collaborative Study Rooms R EG UL AR AC C ES S EX TEN DED AC C ESS proprietary and confidentialGolden Gate University SF Remodel Project - Phase 7: Master Planning & Programming MKTHINK 11

    ×