Your SlideShare is downloading. ×
0
Golden Gate University                         GGU Future Space Program   10.01.12
Strategy: Future Space Program                                                                            Current vs Propo...
Strategy: Future Space Program                                             Current vs Proposed Assignable & Non-Assignable...
Strategy: Future Space Program                                                                         Current vs Proposed...
Strategy: Future Space Program                                                                            Current vs Propo...
Strategy: Future Space Program                                                                                     Current...
Strategy: Future Space Program                                                                            Current vs Propo...
Strategy: Future Space Program                                                                                     Current...
Upcoming SlideShare
Loading in...5
×

10 01-12 ggu-current_vs_future

121

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
121
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "10 01-12 ggu-current_vs_future"

  1. 1. Golden Gate University GGU Future Space Program 10.01.12
  2. 2. Strategy: Future Space Program Current vs Proposed SF by Room Type 240,000 236,321 SF 236,321 SF AVAILABLE 220,000 INSTRUCTION INSTRUCTION Decrease in: 200,000 UNIVERSITY LIBRARY UNIVERSITY LIBRARY Instructional SF 180,000 LAW LIBRARY University Library Book Storage LAW LIBRARY 160,000 Increase in: INTERACTION INTERACTION 140,000 Interaction Spaces Office Spaces 120,000 OFFICE OFFICE Planned Space: 223,885 SF 100,000 Available Space: 12,436 SF USER SUPPORT USER SUPPORT 80,000 60,000 CIRCULATION Proposed Space Program stays CIRCULATION within the existing facility 40,000 envelope. 20,000 BUILDING SUPPORT BUILDING SUPPORT 0 OUTDOOR OUTDOOR Current Proposed proprietary and confidentialGolden Gate University SF Remodel Project - Phase 7: Master Planning & Programming MKTHINK 7
  3. 3. Strategy: Future Space Program Current vs Proposed Assignable & Non-Assignable Count 1,100 1,000 981 929 900 800 ASSIGNABLE (425) 700 ASSIGNABLE Increase number of Assignable (403) Space workstations/areas 600 28,250 SF 500 400 300 NON-ASSIGNABLE NON-ASSIGNABLE (556) (526) 200 100 0 Current Proposed proprietary and confidentialGolden Gate University SF Remodel Project - Phase 7: Master Planning & Programming MKTHINK 7
  4. 4. Strategy: Future Space Program Current vs Proposed Instructional Space 50,000 45,337 SF 45,000 40,000 35,000 Decrease by: 17,279 SF 30,000 28,058 SF 9 Scheduled Classrooms 25,000 54 Rooms Allows latent space to be (50 Scheduled) allocated to other programs and resources. Over half of 20,000 a floor at GGU. 15,000 41 Rooms 10,000 5,000 0 Current Proposed proprietary and confidentialGolden Gate University SF Remodel Project - Phase 7: Master Planning & Programming MKTHINK 7
  5. 5. Strategy: Future Space Program Current vs Proposed Assignable Space 45,000 39,938 SF 40,000 36,236 SF 35,000 Allocate space for adjunct faculty. 30,000 28,250 SF 25,000 54 Rooms Increase by: 20,000 (50 Scheduled) 3,702 SF 15,000 41 Rooms 10,000 5,000 0 Current Proposed proprietary and confidentialGolden Gate University SF Remodel Project - Phase 7: Master Planning & Programming MKTHINK 7
  6. 6. Strategy: Future Space Program Current vs Proposed Admin SpaceGOLDEN GATE UNIVERSITY2012 FUTURE SPACE PROGRAM ASSIGNABLE UNIVERSITY BACK TO MAINAGENO SCHOOL OF BUSINESS Head Count SFCLOSED 27 3,187SHARED 78 856TEAM 14 896NO DEDICATED SPACE 1 0SUBTOTAL 120 4,939SCHOOL OF LAW Head Count SFCLOSED 67 7,893SHARED 58 580TEAM 47 3,284NO DEDICATED SPACE 166 0 Refer to AssignableSUBTOTAL 338 11,757 Space ProgramSCHOOL OF TAX AND ACCOUNTING Head Count SFCLOSED 16 1,977SHARED 39 504TEAM 8 512NO DEDICATED SPACE 3 0SUBTOTAL 66 2,993UNDERGRADUATE Head Count SFCLOSED 11 1,359SHARED 12 158TEAM 4 256NO DEDICATED SPACE 8 0SUBTOTAL 35 1,773UNIVERSITY - STAFF AND ADMINISTRATION Head Count SFCLOSED 59 7,556SHARED 5 126TEAM 166 10,912NO DEDICATED SPACE 16 0SUBTOTAL 246 18,594GGU TOTAL 805 40,056 proprietary and confidentialGolden Gate University SF Remodel Project - Phase 7: Master Planning & Programming MKTHINK 7
  7. 7. Strategy: Future Space Program Current vs Proposed Interaction Space 35,000 31,011 SF 30,000 25,000 Increase by: 21,001 SF 10,010 SF 28,250 SF 20,000 Create more conference/meeting/ group study rooms. 54 Rooms 67 Rooms (50 Scheduled) Provide new faculty/staff 15,000 lounge. SBA, SGA, Cafe in 40 Jessie 45 Rooms remain the same. 10,000 41 Rooms 5,000 0 Current Proposed proprietary and confidentialGolden Gate University SF Remodel Project - Phase 7: Master Planning & Programming MKTHINK 7
  8. 8. Strategy: Future Space Program Current vs Proposed Library Space 40,000 37,103 SF 35,000 11,987 SF 29,987 SF 30,000 4,871 SF Decrease dedicated University Library Program by: 25,000 28,250 SF 7,116 SF - Reduce book storage by 6,240 SF 20,000 54 Rooms - 3,916 SF allocated to Interaction (50 Scheduled) programs, with Library affiliation 15,000 - 2 Learning Support Service rooms counted in Interaction 25,116 SF 25,116 SF 41 Rooms - Note: All staff counted in Assignable 10,000 space - New collaborative interaction spaces 5,000 counted in Interaction 0 Current Proposed proprietary and confidentialGolden Gate University SF Remodel Project - Phase 7: Master Planning & Programming MKTHINK 7
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×