Your SlideShare is downloading. ×
Microwaves India
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Microwaves India

608
views

Published on


0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
608
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
13
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Indian Microwaves :Aggregate Planning By- Ashutosh Kumar Jha(91011) Deepinder Singh(91016) Divanshu Kapoor(91017) Harsh Agrawal(91022) Nishant Singh(91039) Sweta Agarwal(91059)
  • 2. Case of Aggregate Planning
    • Data is given for “Indian Microwaves” annual production forecasts.
    • Aggregate planning & costing to be done
    • Four production plans are made & least costly one is chosen
  • 3. Four production plans
    • Production Plan 1: Exact Production; Vary Workforce
    • Production Plan 2: Constant Workforce; Vary Inventory and Stockout
    • Production Plan 3: Constant Low Workforce; Subcontract
    • Production Plan 4: Constant Workforce; Overtime
  • 4. Given Data
  • 5. Given Data
  • 6. Aggregate Production Planning Requirements
  • 7. Comparison of Four Plans         Cost Plan 1 Plan 2 Plan 3 Plan 4 Hiring 81,99,000 0 0 0 Layoff 2,20,00,000 0 0 0 Excess inventory 0 60,29,600 0 62,81,400 Shortage 0 84,50,000 0 0 Subconstract 0 0 38,970,000 0 Overtime 0 0 0 33,97,500 Straight time 9,39,00,000 9,39,01,500 6,27,16,500 9,41,98,500   12,40,99,000 10,83,81,100 10,16,96,400 10,38,77,400
  • 8. Thank You

×