Petro Horison Energy Power Point Presentation
by LithiumStocks on May 07, 2010
- 987 views
>Drill results to date have identified two lithium and rare metal bearing pegmatite dikes that appear at surface and are up to 20 meters wide and having exposed lengths up to 300 meters long. ...
>Drill results to date have identified two lithium and rare metal bearing pegmatite dikes that appear at surface and are up to 20 meters wide and having exposed lengths up to 300 meters long. The deepest drill hole intersected the dikes at 50 meters depth.
Accessibility
Categories
Tags
More...Upload Details
Uploaded via SlideShare as Adobe PDF
Usage Rights
© All Rights Reserved
Statistics
- Favorites
- 1
- Downloads
- 0
- Comments
- 0
- Embed Views
- Views on SlideShare
- 580
- Total Views
- 987