Case Study: Puttinginformation at theheart of your businessBT 2nd Data Centre           Jetse Pettinga           Head of I...
St. Antoniusziekenhuis                                     Overvecht                       Oudenrijn                      ...
St. Antoniusziekenhuis                                                             Overvecht                              ...
St. Antoniusziekenhuis                                                                  Overvecht                     2013...
St. Antoniusziekenhuis                     2013                                     Blaricum                              ...
St. Antoniusziekenhuis    • 5.500 Employees                3.500 Desktops    • 250 Specialists                600 Server...
What do we offer?    •Hospital    -    A comprehensive and specialized healthcare    -    Top Medical healthcare 7 days a ...
Why a second data centre?    • Healthcare process is becoming increasingly reliant of ICT    • Hospital is a 7 x 24 hour b...
Research NEN7510 February 2010                                                              "Besides the recommendation pr...
Requirements for external data centre    • National procurement requirements "Shared Server Centre" Santeon (2008 - 2010)B...
Requirements for external data centre    • National procurement requirements "Shared Server Centre" Santeon (2008 - 2010) ...
Requirements for external data centre    •National procurement requirements "Shared Server Centre" Santeon (2008 - 2010)  ...
Requirements for external data centre    •National procurement requirements "Shared Server Centre" Santeon (2008 - 2010)  ...
Why BT    • Was already on shortlist Santeon (2008-2010)    • Data centre near primary data centre of St. Antonius Hospita...
Technical Infrastructure                                                                                                  ...
Technical Infrastructure                                                                                                  ...
Technical Infrastructure                                                                                                  ...
Technical Infrastructure            Policlinic                                                                            ...
Technical Infrastructure            Policlinic                                                                            ...
To Think About    • Building your own datacentre is not cheaper    • Power & Cooling (Racks versus Blades versus Location)...
Thank You
Upcoming SlideShare
Loading in...5
×

Case Study: Putting information at the heart of your business

349

Published on

Presentation by Jetse Pettinga, Head of ICT Systems Management

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
349
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Case Study: Putting information at the heart of your business

  1. 1. Case Study: Puttinginformation at theheart of your businessBT 2nd Data Centre Jetse Pettinga Head of ICT Systems Management
  2. 2. St. Antoniusziekenhuis Overvecht Oudenrijn NieuwegeinBT 2nd Data Centre 1
  3. 3. St. Antoniusziekenhuis Overvecht Blaricum Policlinic Vleuterweide Dental Surgery Utr.-De Meern Oudenrijn Nieuwegein Policlinic HoutenBT 2nd Data Centre 2
  4. 4. St. Antoniusziekenhuis Overvecht 2013 Blaricum Policlinic Vleuterweide Dental Surgery Utr.-De Meern Oudenrijn Utrecht Nieuwegein Policlinic HoutenBT 2nd Data Centre 3
  5. 5. St. Antoniusziekenhuis 2013 Blaricum Policlinic Overvecht Dental Surgery Utr.-De Meern Policlinic Oudenrijn Utrecht Nieuwegein Policlinic HoutenBT 2nd Data Centre 4
  6. 6. St. Antoniusziekenhuis • 5.500 Employees  3.500 Desktops • 250 Specialists  600 Servers / 250 Tera Byte • 150 junior Doctors  700 Applications Blaricum • 880 Beds  7 * 24 Hours • 550.000 policlinic visits Policlinick Overvecht Dental Surgery Utr.-De Meern Policlinic Oudenrijn Utrecht Nieuwegein Policlinic HoutenBT 2nd Data Centre 5
  7. 7. What do we offer? •Hospital - A comprehensive and specialized healthcare - Top Medical healthcare 7 days a week, 24 hours a day - Policlinics at 6 locations - Short waiting lists - Highly specialized and motivated medical staff and nurses - The latest treatment techniques and equipment •Research and Development •Antonius Academy • ZiekenhuisBT 2nd Data Centre 6
  8. 8. Why a second data centre? • Healthcare process is becoming increasingly reliant of ICT • Hospital is a 7 x 24 hour business • Requirements for continuity and availability of ICT services are high • Laws and regulations • ……. and other institutionsBT 2nd Data Centre 7
  9. 9. Research NEN7510 February 2010 "Besides the recommendation priority to any of the External audits identified risks and a plan to implement related measures, a number of measures in the opinion of TNO have a priority that would need immediate attention: "Realize an alternative location for the central computer room, or reserve capacity as an interim solution within a commercial datacenter " datacentreBenchmark scenarios EPD - October 2010 EHR"The main improvements at St. Antonius are working with acontinuous improvement in quality-oriented methodology,provisions for the continuity and contingency of the EHRsystem" Financial Statement Audit "ICT Developments" November 2010 "The Antonius does not have a continuity or disaster recovery and contingency arrangements for business to continue in case of emergencies. Antonius can currently only fall back on the backup tapes " "If by an emergency the systems in Antonius are no longer available, the business will be hit." The current measures are not sufficient to ensure continuity. The cost to recreate the environment may be substantially " "We recommend to ensure that adequate security measures have been taken inin continuity measures have been taken the event of an emergency andand to test them periodically." the event of an emergency periodic testing." BT 2nd Data Centre 8
  10. 10. Requirements for external data centre • National procurement requirements "Shared Server Centre" Santeon (2008 - 2010)BT 2nd Data Centre 9
  11. 11. Requirements for external data centre • National procurement requirements "Shared Server Centre" Santeon (2008 - 2010) • Distance preferably up to 35 km “…… but at least a Boeing 747 + 10 meters” 1,3 KmBT 2nd Data Centre 10
  12. 12. Requirements for external data centre •National procurement requirements "Shared Server Centre" Santeon (2008 - 2010) • Distance preferably up to 35 km “…… but at least a Boeing 747 + 10 meters” 1,3 KmBT 2nd Data Centre 11
  13. 13. Requirements for external data centre •National procurement requirements "Shared Server Centre" Santeon (2008 - 2010) • Distance preferably up to 35 km • Must be monitored and occupied 7 x 24 hours • Equipped with emergency power, redundant power and cooling • Redundantly connected with primary data centre with dark fiber • Maintain our current provider’s fiber ring • Solution sufficiently scalable to the future • 24 hours site access by our own IT staff • Infrastructure only, applications in-house • “Telehousing”BT 2nd Data Centre 12
  14. 14. Why BT • Was already on shortlist Santeon (2008-2010) • Data centre near primary data centre of St. Antonius Hospital • Good appearance (1st impression facility and people) • Their offering was the best if you include line cost • Growth opportunities and continuity into the future • The offered square metersBT 2nd Data Centre 13
  15. 15. Technical Infrastructure 2010 Overvecht Oudenrijn Managed 1 Gbit Ring Nieuwegein hp ProLiant DL585 hp ProLiant DL585 U ID U ID 2 1 D le S plex up x im 0 0 1 1 0 2 1 3 2 1 D le S plex up x im 0 0 1 1 0 2 1 3 hp ProLiant DL585 hp ProLiant DL585 U ID U ID 2 1 D le S plex up x im 0 0 1 1 0 2 1 3 2 1 D le S plex up x im 0 0 1 1 0 2 1 3BT 2nd Data Centre 14
  16. 16. Technical Infrastructure 2011 Overvecht Oudenrijn Managed 1 Gbit Ring Nieuwegein BT Nieuwegein hp ProLiant DL585 hp ProLiant DL585 U ID U ID hp ProLiant DL585 hp ProLiant DL585 U ID U ID 2 1 D le S plex up x im 0 0 1 1 0 2 1 3 2 1 D le S plex up x im 0 0 1 1 0 2 1 3 2 1 D le S plex up x im 0 0 1 1 0 2 1 3 2 1 D le S plex up x im 0 0 1 1 0 2 1 3 hp ProLiant DL585 hp ProLiant DL585 U ID U ID hp ProLiant DL585 hp ProLiant DL585 U ID U ID 2 1 D le S plex up x im 0 0 1 1 0 2 1 3 2 1 D le S plex up x im 0 0 1 1 0 2 1 3 2 1 D le S plex up x im 0 0 1 1 0 2 1 3 2 1 D le S plex up x im 0 0 1 1 0 2 1 3BT 2nd Data Centre 15
  17. 17. Technical Infrastructure 2011 Overvecht Oudenrijn Managed 1 Gbit Ring Nieuwegein BT Nieuwegein hp ProLiant DL585 hp ProLiant DL585 U ID U ID hp ProLiant DL585 hp ProLiant DL585 U ID U ID 2 1 D le S plex up x im 0 0 1 1 0 2 1 3 2 1 D le S plex up x im 0 0 1 1 0 2 1 3 2 1 D le S plex up x im 0 0 1 1 0 2 1 3 2 1 D le S plex up x im 0 0 1 1 0 2 1 3 hp ProLiant DL585 hp ProLiant DL585 U ID U ID hp ProLiant DL585 hp ProLiant DL585 U ID U ID 2 1 D le S plex up x im 0 0 1 1 0 2 1 3 2 1 D le S plex up x im 0 0 1 1 0 2 1 3 2 1 D le S plex up x im 0 0 1 1 0 2 1 3 2 1 D le S plex up x im 0 0 1 1 0 2 1 3BT 2nd Data Centre 16
  18. 18. Technical Infrastructure Policlinic 2013 Overvecht Policlinic Oudenrijn Utrecht (Leidscherijn) Managed 1 Gbit Ring Nieuwegein BT Nieuwegein hp ProLiant DL585 hp ProLiant DL585 U ID U ID hp ProLiant DL585 hp ProLiant DL585 U ID U ID 2 1 D le S plex up x im 0 0 1 1 0 2 1 3 2 1 D le S plex up x im 0 0 1 1 0 2 1 3 2 1 D le S plex up x im 0 0 1 1 0 2 1 3 2 1 D le S plex up x im 0 0 1 1 0 2 1 3 hp ProLiant DL585 hp ProLiant DL585 U ID U ID hp ProLiant DL585 hp ProLiant DL585 U ID U ID 2 1 D le S plex up x im 0 0 1 1 0 2 1 3 2 1 D le S plex up x im 0 0 1 1 0 2 1 3 2 1 D le S plex up x im 0 0 1 1 0 2 1 3 2 1 D le S plex up x im 0 0 1 1 0 2 1 3BT 2nd Data Centre 17
  19. 19. Technical Infrastructure Policlinic 2013 Overvecht Policlinic Oudenrijn Utrecht (Leidscherijn) Managed 1 Gbit Ring Nieuwegein BT Nieuwegein Overlay Transport Virtualization hp ProLiant DL585 hp ProLiant DL585 U ID U ID hp ProLiant DL585 hp ProLiant DL585 U ID U ID 2 hp ProLiant DL585 1 D le S plex up x im 0 0 1 1 0 U ID 2 1 3 2 hp ProLiant DL585 1 D le S plex up x im 0 0 1 1 0 U ID 2 1 3 OTV 2 hp ProLiant DL585 1 D le S plex up x im 0 0 1 1 0 U ID 2 1 3 2 hp ProLiant DL585 1 D le S plex up x im 0 0 1 1 0 U ID 2 1 3 (Both Datacentres in the same network) 2 1 D le S plex up x im 0 0 1 1 0 2 1 3 2 1 D le S plex up x im 0 0 1 1 0 2 1 3 2 1 D le S plex up x im 0 0 1 1 0 2 1 3 2 1 D le S plex up x im 0 0 1 1 0 2 1 3 Fibre ChannelBT 2nd Data Centre 18
  20. 20. To Think About • Building your own datacentre is not cheaper • Power & Cooling (Racks versus Blades versus Location) • Redundant fiber connections over completely seperated lines • Take your time and plan it wellBT 2nd Data Centre 19
  21. 21. Thank You
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×