SlideShare a Scribd company logo
1 of 7
Join PayCrew, LLC and Clemson University’s
Construction Science Department in a
Research Project that will change the way the
industry has traditionally recruited, trained,
measured and retained Craftsmen in the
construction industry.
Do You Need Quality Construction
Craftsmen?
Attention!
Participants Needed
Self-Performing General Contractors
Subcontractors (AllTrades)
Requirements
 Be committed to the goals of the project.
 Have a computerized accounting system with cost code and
phase capabilities that stores both estimated and actual
quantities.
 Be willing to share the results within the research project’s
participants.
 Be willing to meet bi-weekly via the web and quarterly in a
round table discussion.
 Financially support the project through donations.
Goals of Project
 Establish accurate, timely obtainable field measurements by using a
“Standardized” cost code structure for every project.
 Phases can be ad-hoc and descriptive based on cost code breakdown of
large projects so that shorter spans of time can be realized for
completing cost code goals for team results.
 “Clearly” let each employee see the goals and the results “daily” of what
they are producing.
 Establish a “Standard of Talents” based on each of the “Standardized”
cost codes to measure the daily talents of every employee so he/she
can see their strengths and areas to learn, improve and experience
needed.
 Develop a Incentive system from the results.
 Establish a “Historical Database” for reference by estimators and
human resource personnel.
Results Expected
 Accurate Daily Production Measuring System usingWeb
Technology in conjunction with Database Integration of
Company’sAccounting System.
 Daily Evaluation system that is non-subjective and factual in
recording and reporting each employee’s development of
talents and experience over the their entire Career in the
Construction Industry.
 Build a Shared Production Historical Database for use
by all participants to use for future estimating, profit
improvements, employee recruitment, talent training and
incentives, marketing.
Benefits to Participants
 PayCrew will donate it’sWeb Based Daily Production Software to
Participants for FREE. Participants must meet the “Requirements”
as defined on page 3. (some modification costs may be required to
integrate with your accounting system)
 FREE use of the Shared Production Historical Database
 Publicity during the Research Project with different publications
and articles.
 Input and creation from a research project that will impact and
change the Construction Industry and Create a Pool of Students
wanting to learn aTrade and become tomorrows Career
Craftsmen.
How to Participate
 Contact
Lee A. Clark
864-404-8510
lee@paycrew.com
LinkedIn
PayCrew is a product that has be tested for over 15 years with success. PayCrew was
highlighted at theWOC in LasVegas this year during a 3 hr. seminarTH36 - Create and
Use Custom, Real-Time & Accurate Data Information Systems.
If you would like more information go to www.paycrew.com
A demo of the software can be scheduled anytime by calling or emailing.

More Related Content

What's hot

What's hot (10)

Ahmad_CV
Ahmad_CVAhmad_CV
Ahmad_CV
 
Gaurav_Resume 1
Gaurav_Resume 1Gaurav_Resume 1
Gaurav_Resume 1
 
RESUME 1
RESUME 1RESUME 1
RESUME 1
 
GauravKapshe
GauravKapsheGauravKapshe
GauravKapshe
 
Resume sam kauffman-2021
Resume sam kauffman-2021Resume sam kauffman-2021
Resume sam kauffman-2021
 
Edward passno 2016-2A
Edward passno 2016-2AEdward passno 2016-2A
Edward passno 2016-2A
 
Darby_Spiegel Resume
Darby_Spiegel ResumeDarby_Spiegel Resume
Darby_Spiegel Resume
 
Tarun Dheer_Updated Resume
Tarun Dheer_Updated ResumeTarun Dheer_Updated Resume
Tarun Dheer_Updated Resume
 
Growth engine presentation
Growth engine presentationGrowth engine presentation
Growth engine presentation
 
Canvas Presentation
Canvas PresentationCanvas Presentation
Canvas Presentation
 

Viewers also liked

Linear Programming: The Construction Problem
Linear Programming: The Construction ProblemLinear Programming: The Construction Problem
Linear Programming: The Construction Problembullardcr
 
Lp simplex method example in construction managment
Lp simplex method example in construction managmentLp simplex method example in construction managment
Lp simplex method example in construction managmentNaghamNagham
 
ON Fuzzy Linear Programming Technique Application
ON Fuzzy Linear Programming Technique ApplicationON Fuzzy Linear Programming Technique Application
ON Fuzzy Linear Programming Technique Applicationijsrd.com
 
Vehicle route scheduling and transportation cost minimization in a latex indu...
Vehicle route scheduling and transportation cost minimization in a latex indu...Vehicle route scheduling and transportation cost minimization in a latex indu...
Vehicle route scheduling and transportation cost minimization in a latex indu...IJRES Journal
 
Efficient multicast delivery for data redundancy minimization
Efficient multicast delivery for data redundancy minimizationEfficient multicast delivery for data redundancy minimization
Efficient multicast delivery for data redundancy minimizationJayakrishnan U
 
New microsoft power point presentation
New microsoft power point presentationNew microsoft power point presentation
New microsoft power point presentationRaj Patil
 
Optimizing profit with linear programming model
Optimizing profit with linear programming modelOptimizing profit with linear programming model
Optimizing profit with linear programming modelAmit Deshmukh
 
Application of linear programming techniques to practical
Application of linear programming techniques to practicalApplication of linear programming techniques to practical
Application of linear programming techniques to practicalAlexander Decker
 
Linear Programming on Digital Advertising
Linear Programming on Digital AdvertisingLinear Programming on Digital Advertising
Linear Programming on Digital AdvertisingA. Can Bengisu
 
Linear programming 1
Linear programming 1Linear programming 1
Linear programming 1Rezaul Karim
 
Cost Minimization
Cost Minimization Cost Minimization
Cost Minimization tnblogspot
 
Construction Project Managment Techniques
Construction Project Managment TechniquesConstruction Project Managment Techniques
Construction Project Managment Techniquesguestc8140fe
 
Transportation Problem in Operational Research
Transportation Problem in Operational ResearchTransportation Problem in Operational Research
Transportation Problem in Operational ResearchNeha Sharma
 
Human Resource planning
Human Resource planningHuman Resource planning
Human Resource planningAnything Group
 

Viewers also liked (17)

Linear Programming: The Construction Problem
Linear Programming: The Construction ProblemLinear Programming: The Construction Problem
Linear Programming: The Construction Problem
 
Man prod 1
Man prod 1Man prod 1
Man prod 1
 
Lp simplex method example in construction managment
Lp simplex method example in construction managmentLp simplex method example in construction managment
Lp simplex method example in construction managment
 
20320140507011
2032014050701120320140507011
20320140507011
 
ON Fuzzy Linear Programming Technique Application
ON Fuzzy Linear Programming Technique ApplicationON Fuzzy Linear Programming Technique Application
ON Fuzzy Linear Programming Technique Application
 
Vehicle route scheduling and transportation cost minimization in a latex indu...
Vehicle route scheduling and transportation cost minimization in a latex indu...Vehicle route scheduling and transportation cost minimization in a latex indu...
Vehicle route scheduling and transportation cost minimization in a latex indu...
 
Efficient multicast delivery for data redundancy minimization
Efficient multicast delivery for data redundancy minimizationEfficient multicast delivery for data redundancy minimization
Efficient multicast delivery for data redundancy minimization
 
New microsoft power point presentation
New microsoft power point presentationNew microsoft power point presentation
New microsoft power point presentation
 
Optimizing profit with linear programming model
Optimizing profit with linear programming modelOptimizing profit with linear programming model
Optimizing profit with linear programming model
 
Application of linear programming techniques to practical
Application of linear programming techniques to practicalApplication of linear programming techniques to practical
Application of linear programming techniques to practical
 
Linear Programming on Digital Advertising
Linear Programming on Digital AdvertisingLinear Programming on Digital Advertising
Linear Programming on Digital Advertising
 
Linear programming 1
Linear programming 1Linear programming 1
Linear programming 1
 
Cost Minimization
Cost Minimization Cost Minimization
Cost Minimization
 
Construction Project Managment Techniques
Construction Project Managment TechniquesConstruction Project Managment Techniques
Construction Project Managment Techniques
 
Transportation Problem in Operational Research
Transportation Problem in Operational ResearchTransportation Problem in Operational Research
Transportation Problem in Operational Research
 
Operational reseach ppt
Operational reseach pptOperational reseach ppt
Operational reseach ppt
 
Human Resource planning
Human Resource planningHuman Resource planning
Human Resource planning
 

Similar to Do you need quality construction craftsmen?

Project Report on Employee Management System.docx
Project Report on Employee Management System.docxProject Report on Employee Management System.docx
Project Report on Employee Management System.docxDhineshkumarPrakasam
 
6475- RAILWAY RESERVATION SYSTEM.pdf
6475- RAILWAY RESERVATION SYSTEM.pdf6475- RAILWAY RESERVATION SYSTEM.pdf
6475- RAILWAY RESERVATION SYSTEM.pdfRmsDagi
 
Machine intelligence methodology for large IT projects
Machine intelligence methodology for large IT projectsMachine intelligence methodology for large IT projects
Machine intelligence methodology for large IT projectsJeremy Lehman
 
Using_machine_learning_to_improve_DR_forecasts_-_white_paper
Using_machine_learning_to_improve_DR_forecasts_-_white_paperUsing_machine_learning_to_improve_DR_forecasts_-_white_paper
Using_machine_learning_to_improve_DR_forecasts_-_white_paperTyler Byers
 
MagdaEContosResume
MagdaEContosResumeMagdaEContosResume
MagdaEContosResumeMagda Contos
 
Dynamics Day 2017 Brisbane: Dynamics 365 Field and Project Services
Dynamics Day 2017 Brisbane: Dynamics 365 Field and Project ServicesDynamics Day 2017 Brisbane: Dynamics 365 Field and Project Services
Dynamics Day 2017 Brisbane: Dynamics 365 Field and Project ServicesEmpired
 
Machine intelligence data science methodology 060420
Machine intelligence data science methodology 060420Machine intelligence data science methodology 060420
Machine intelligence data science methodology 060420Jeremy Lehman
 
computer science.docx. Mohit Class 12 follow for more
computer science.docx. Mohit Class 12 follow for morecomputer science.docx. Mohit Class 12 follow for more
computer science.docx. Mohit Class 12 follow for morekimchibhendalbhai070
 

Similar to Do you need quality construction craftsmen? (20)

Chaitra
ChaitraChaitra
Chaitra
 
Project Report on Employee Management System.docx
Project Report on Employee Management System.docxProject Report on Employee Management System.docx
Project Report on Employee Management System.docx
 
CS PRACRICLE.docx
CS PRACRICLE.docxCS PRACRICLE.docx
CS PRACRICLE.docx
 
Krishnan Ramachandran
Krishnan RamachandranKrishnan Ramachandran
Krishnan Ramachandran
 
SwathiMabbu_BA
SwathiMabbu_BASwathiMabbu_BA
SwathiMabbu_BA
 
6475- RAILWAY RESERVATION SYSTEM.pdf
6475- RAILWAY RESERVATION SYSTEM.pdf6475- RAILWAY RESERVATION SYSTEM.pdf
6475- RAILWAY RESERVATION SYSTEM.pdf
 
Saiprakash.B_Resume
Saiprakash.B_ResumeSaiprakash.B_Resume
Saiprakash.B_Resume
 
Kajari_Resume
Kajari_ResumeKajari_Resume
Kajari_Resume
 
Machine intelligence methodology for large IT projects
Machine intelligence methodology for large IT projectsMachine intelligence methodology for large IT projects
Machine intelligence methodology for large IT projects
 
Using_machine_learning_to_improve_DR_forecasts_-_white_paper
Using_machine_learning_to_improve_DR_forecasts_-_white_paperUsing_machine_learning_to_improve_DR_forecasts_-_white_paper
Using_machine_learning_to_improve_DR_forecasts_-_white_paper
 
AnkitResume
AnkitResumeAnkitResume
AnkitResume
 
MagdaEContosResume
MagdaEContosResumeMagdaEContosResume
MagdaEContosResume
 
Dynamics Day 2017 Brisbane: Dynamics 365 Field and Project Services
Dynamics Day 2017 Brisbane: Dynamics 365 Field and Project ServicesDynamics Day 2017 Brisbane: Dynamics 365 Field and Project Services
Dynamics Day 2017 Brisbane: Dynamics 365 Field and Project Services
 
Ajayan_Resume
Ajayan_ResumeAjayan_Resume
Ajayan_Resume
 
Madhu Resume
Madhu ResumeMadhu Resume
Madhu Resume
 
Gowda Resume
Gowda ResumeGowda Resume
Gowda Resume
 
RESUME
RESUMERESUME
RESUME
 
Machine intelligence data science methodology 060420
Machine intelligence data science methodology 060420Machine intelligence data science methodology 060420
Machine intelligence data science methodology 060420
 
suman_s
suman_ssuman_s
suman_s
 
computer science.docx. Mohit Class 12 follow for more
computer science.docx. Mohit Class 12 follow for morecomputer science.docx. Mohit Class 12 follow for more
computer science.docx. Mohit Class 12 follow for more
 

Recently uploaded

HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
Food processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsFood processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsManeerUddin
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxAshokKarra1
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptshraddhaparab530
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfErwinPantujan2
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSJoshuaGantuangco2
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)cama23
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...JojoEDelaCruz
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptxMusic 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptxleah joy valeriano
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 

Recently uploaded (20)

HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
Food processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsFood processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture hons
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptx
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.ppt
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptxMusic 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 

Do you need quality construction craftsmen?

  • 1. Join PayCrew, LLC and Clemson University’s Construction Science Department in a Research Project that will change the way the industry has traditionally recruited, trained, measured and retained Craftsmen in the construction industry. Do You Need Quality Construction Craftsmen? Attention!
  • 2. Participants Needed Self-Performing General Contractors Subcontractors (AllTrades)
  • 3. Requirements  Be committed to the goals of the project.  Have a computerized accounting system with cost code and phase capabilities that stores both estimated and actual quantities.  Be willing to share the results within the research project’s participants.  Be willing to meet bi-weekly via the web and quarterly in a round table discussion.  Financially support the project through donations.
  • 4. Goals of Project  Establish accurate, timely obtainable field measurements by using a “Standardized” cost code structure for every project.  Phases can be ad-hoc and descriptive based on cost code breakdown of large projects so that shorter spans of time can be realized for completing cost code goals for team results.  “Clearly” let each employee see the goals and the results “daily” of what they are producing.  Establish a “Standard of Talents” based on each of the “Standardized” cost codes to measure the daily talents of every employee so he/she can see their strengths and areas to learn, improve and experience needed.  Develop a Incentive system from the results.  Establish a “Historical Database” for reference by estimators and human resource personnel.
  • 5. Results Expected  Accurate Daily Production Measuring System usingWeb Technology in conjunction with Database Integration of Company’sAccounting System.  Daily Evaluation system that is non-subjective and factual in recording and reporting each employee’s development of talents and experience over the their entire Career in the Construction Industry.  Build a Shared Production Historical Database for use by all participants to use for future estimating, profit improvements, employee recruitment, talent training and incentives, marketing.
  • 6. Benefits to Participants  PayCrew will donate it’sWeb Based Daily Production Software to Participants for FREE. Participants must meet the “Requirements” as defined on page 3. (some modification costs may be required to integrate with your accounting system)  FREE use of the Shared Production Historical Database  Publicity during the Research Project with different publications and articles.  Input and creation from a research project that will impact and change the Construction Industry and Create a Pool of Students wanting to learn aTrade and become tomorrows Career Craftsmen.
  • 7. How to Participate  Contact Lee A. Clark 864-404-8510 lee@paycrew.com LinkedIn PayCrew is a product that has be tested for over 15 years with success. PayCrew was highlighted at theWOC in LasVegas this year during a 3 hr. seminarTH36 - Create and Use Custom, Real-Time & Accurate Data Information Systems. If you would like more information go to www.paycrew.com A demo of the software can be scheduled anytime by calling or emailing.