3. Conversation Goals
• Collect information from residents
Sewer backups
Localized flooding (street, yard, basements)
Sidewalk locations (current vs. desired)
Pavement widths
Parking needs (existing vs. desired)
Curbing (vertical vs. sloped)
Tree/planting/landscaping concerns
Curb cuts (existing vs. desired)
4. CSO Terminology
CSO = Combined Sewer Overflow
CB = Catch Basin
CD = Consent Decree
Combined Sewer = pipe w/ storm and sanitary flow
Purpose of sewer separation project is to provide
separate sanitary pipe and separate storm drain
pipe.
5. CSO Program Overview
• September 1998 – Draft CSO Master Plan
• 2000 – Administrative Order from EPA
• December 2005 – CSO Engineering Study
• April 2009 – CD Issued
Nov 2018 – Complete Contract 11 Sewer Separation
Dec 2020 – Eliminate All CSOs
6. CSO Contract 11 Area (feet)
• Mechanic Street (2,000)
• Mascoma Street (840)
• High Street (600)
• Worthen Street (500)
• Cameron Avenue (500)
• Mason Street (520)
• West Street (1,070)
• Child Street (590)
• Granite Street (1,015)
• Young Street (1,300)
• Guyer Street (1,160)
• Bliss Street (370)
• Light Street (600)
7. • Bank Street Extension (1,000)
• Cooper Street (250)
• Bank Street Near Bank Street Extension (200)
9. March 23, 2015 Meeting Area
• Mason Street (520)
• West Street (1,070)
• Child Street (590)
• Granite Street (1,015)
• Young Street (1,300)
• Guyer Street (1,160)
• Bliss Street (370)
• Light Street (600)
10. General Project Overview
• New sanitary, storm, and water pipes
• Maintain esplanade configuration
• Maintain sidewalk configuration
• Retaining walls may be needed
• Add curbing and catch basins
vertical vs. sloped curb
• May modify vertical profile
• Constant roadway width
11. Protection of Trees
• Walkabout with arborist will be conducted.
• Invites via mailing will be forthcoming.
• Contact City staff if you have a concern about a
particular tree or planting.
12. Schedule
• House-To-House Inspections – January 2015
• Virtual Walkabouts – March 2015*
• CCVT/Smoke Testing – March 2015
• Project Area Survey – April 2015
• Preliminary Design – July 2015*
• 75% Design – September 2015*
• Final Construction Documents – March 2016*
• Bid Period – April 2016
• Start Construction – June 2016
• End Construction – December 2017
* Public Meeting
13. Project Contacts
• Christina Hall, City Engineer
Christina.Hall@lebcity.com
603.448.3112
• Mike Lavalla, Director of Public Works
Mike.Lavalla@lebcity.com
603.448.3112
• LebAlert
alert.lebnh.net
• Ryan Wingard, Wright-Pierce Project Manager
Ryan.Wingard@wright-pierce.com
603.430.3728
15. Mason Street
Young to Granite
Approx. Proposed
Component Existing For Discussion
Width 25’ 24’
Esplanade yes (north) yes (north)
Sidewalk yes (north) yes (north)
Drainage CBs Vert. Curb/CBs
16. West Street
Young to Granite
Approx. Proposed
Component Existing For Discussion
Width 22’-25’ 22’
Esplanade yes (north) yes (north)
Sidewalk yes (north) yes (north)
Drainage CBs Vert. Curb/CBs
17. West Street
Granite to High
Approx. Proposed
Component Existing For Discussion
Width 20’-25’ 20’
Esplanade None None
Sidewalk None None
Drainage CBs Slope Curb/CBs
18. Child Street
Young to Granite
Approx. Proposed
Component Existing For Discussion
Width 18’-20’ 20’
Esplanade None None
Sidewalk None None
Drainage CBs Slope Curb/CBs
19. Granite Street
Mason to Mascoma
Approx. Proposed
Component Existing For Discussion
Width 20’ – 35’ 24’
Esplanade Yes (west) Yes (west)
Sidewalk Yes (west) Yes (west)
Partial (east) None
Drainage CBs Curb/CBs
20. Young Street
Hough to Worthen
Approx. Proposed
Component Existing For Discussion
Width 18’ – 26’ 22’
Esplanade None None
Sidewalk Partial (west) None
Drainage CBs Curb/CBs
21. Guyer Street
Young to Granite
Approx. Proposed
Component Existing For Discussion
Width 20’ – 22’ 22’
Esplanade Yes (north) Yes (north)
Sidewalk Yes (north) Yes (north)
Drainage CBs Curb/CBs
22. Guyer Street
Granite to Mascoma
Approx. Proposed
Component Existing For Discussion
Width 15’ – 20’ 20’
Esplanade None None
Sidewalk None None
Drainage CBs Slope Curb/CBs
23. Bliss Avenue/Street
Young to Guyer
Approx. Proposed
Component Existing For Discussion
Width 12’-16’ 16’
Esplanade None None
Sidewalk None None
Drainage CBs Slope Curb/CBs
24. Light Street
Granite to High
Approx. Proposed
Component Existing For Discussion
Width 10’-18’ 12’
Esplanade none none
Sidewalk none none
Drainage CBs Curb/CBs