Your SlideShare is downloading. ×
NG BB 15 MEASURE Roadmap
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

NG BB 15 MEASURE Roadmap

611
views

Published on

Published in: Education, Technology, Business

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
611
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
141
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. UNCLASSIFIED / FOUO UNCLASSIFIED / FOUO National Guard Black Belt Training Module 15 Measure Roadmap UNCLASSIFIED / FOUO UNCLASSIFIED / FOUO
  • 2. UNCLASSIFIED / FOUOCPI Roadmap – Measure 8-STEP PROCESS 6. See 1.Validate 2. Identify 3. Set 4. Determine 5. Develop 7. Confirm 8. Standardize Counter- the Performance Improvement Root Counter- Results Successful Measures Problem Gaps Targets Cause Measures & Process Processes Through Define Measure Analyze Improve Control TOOLS •Process Mapping ACTIVITIES • Map Current Process / Go & See •Process Cycle Efficiency/TOC • Identify Key Input, Process, Output Metrics •Little’s Law • Develop Operational Definitions •Operational Definitions • Develop Data Collection Plan •Data Collection Plan • Validate Measurement System •Statistical Sampling • Collect Baseline Data •Measurement System Analysis • Identify Performance Gaps •TPM • Estimate Financial/Operational Benefits •Generic Pull • Determine Process Stability/Capability •Setup Reduction • Complete Measure Tollgate •Control Charts •Histograms •Constraint Identification •Process Capability Note: Activities and tools vary by project. Lists provided here are not necessarily all-inclusive. UNCLASSIFIED / FOUO
  • 3. UNCLASSIFIED / FOUOTollgate Requirements - Measure NG CPI BLACK BELT TOLLGATE REQUIREMENTS PROJECT DELIVERABLES NGB COMMENTS MEASURE Current State Detailed Process Map / VSM Mandatory VSM (value stream map) Key Input, Process, and Output Metrics Mandatory What to measure Operational Definitions Mandatory What to measure Data Collection Plan Mandatory How, who, when, etc Baseline Statistics Mandatory Center, variation Control Charts Recommended Varies by project Process Capability Analysis Mandatory Ability to meet cust req Measurement System Analysis Mandatory Accuracy of data Estimated Financial & Operational Benefits Mandatory Storyboard / A3 Mandatory 1-page proj summary Barriers/Issues/Risks Mandatory Quick Wins Recommended Lessons Learned Optional UNCLASSIFIED / FOUO
  • 4. UNCLASSIFIED / FOUO What other comments or questions do you have? UNCLASSIFIED / FOUO

×