02/03/2012Participatory land use planning           in practice           Jean‐Christophe Castella               Jeremy Bo...
02/03/20122009 PLUP Manual (MAF‐NLMA)principles for PLUP implementation     Participation ‐ for improved legitimacy of the...
02/03/2012                          Village meeting         PLUP introduction to the village         Selection of the 12 m...
02/03/2012                                      PLUP Fiction role play                                 Eliciting PLUP Para...
02/03/2012Eliciting PLUP Parameters                                    5
02/03/2012                   Simulation ‐ Zoning  Landscape design: an iterative negotiation process                      ...
02/03/2012Scenario exploration    Land grabbing scenario       REDD+ scenario                                     7
02/03/2012              STEP 2. Village zoning• Building a 3D model of the village landscape• D li  Delineating village bo...
02/03/2012Building the 3D model                                9
02/03/2012       10
02/03/2012Delineating village boundariesDelineating village boundaries                                        11
02/03/2012GPS surveyGPS survey                    12
02/03/2012       13
02/03/2012                                         Village boundaries – GPS verification                                  ...
02/03/2012Zones delineation                           15
02/03/2012Zones delineation                           16
02/03/2012Cost‐benefit assessment                                 17
02/03/20123.2 – Village zoning– Kumban zoning                                             18
02/03/2012                Village cluster – Land Use Planຄວາມສໍາຄັນຂອງການເຊື່ອມຕໍ່ກິດຈະກໍາການສົ່ງເສີມ             ກັບວຽກງາ...
02/03/2012        ຂັ້ນຕອນໃນການວາງແຜນພັດທະນາບ້ານ• ຊາວບ້ານຈະມີແຜນການນໍາໃຊ້ທີດິນແຕ່ລະປະເພດຕາມທີ່  ເຂົາເຈົ້າໄດ້ກໍານົດຂື້ນ ປະເພ...
02/03/2012                      Finalizing maps             Preparing PLUP agreement• Signed by village head, land office,...
02/03/2012               Final village meeting• Reporting PLUP results to villagers and neighboring villages.        Thank...
Upcoming SlideShare
Loading in …5
×

Mapping_padetc

615 views

Published on

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
615
On SlideShare
0
From Embeds
0
Number of Embeds
6
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Mapping_padetc

  1. 1. 02/03/2012Participatory land use planning in practice Jean‐Christophe Castella Jeremy Bourgoin Successive stages in PLUP action‐research 2009 – Diagnostic study Muongmuay – Viengkham Sopchia Phonxay S hi – Ph 6 villages each Partners: Landscape Mosaics &  TABI, both SDC funded 2010 – Action‐research Muongmuay – Viengkham 6 villages Partners: Landscape Mosaics,  URDP SIDA URDP‐SIDA 2011 – Up‐scaling, extension Viengkham District  25 villages Partners: Agrisud‐EU 2012 – Consolidation Large projects NUDP‐GIZ, IFAD 1
  2. 2. 02/03/20122009 PLUP Manual (MAF‐NLMA)principles for PLUP implementation Participation ‐ for improved legitimacy of the process outcomes Integration ‐ scale (rationalizing land use plans across scales),  g ( g p ), ‐ knowledge (conservation‐development trade‐offs) ‐ multiple stakeholders’ perspectivesBUT lack of methodological support ‐> inappropriate on‐the‐ground practicesLestrelin G., Bourgoin J., Bouahom B., Castella J.-C. (2011) Measuring participation: Case studies on village land-use planning in northern Lao PDR.Applied Geography 31:950-958.Lestrelin G., Castella J.-C., and Bourgoin J. (2012) Territorialising sustainable development: The politics of land-use planning in the Lao People’sDemocratic Republic. Journal of Contemporary Asia (in press) ການຈັດຕັ້ງປະຕິບັດ-ສຶກສາຄົ້ນຄວ້າ ເພືອສະໜັບສະໜັບ ່ ການມີສ່ວນຮ່ວມຂອງປະຊາຊົນພາຍໃນທ້ອງຖິ່ນ ‘ຈັດກິດຈະກໍາການວາງແຜນນໍາໃຊ້ທີ່ດິນແບບມີສ່ວນຮ່ວມ’: ຈັດຕັ້ງ ແລະ ອໍານວຍຄວາມສະດວກໃນ ການຫຼິ້ນເກມ ເພື່ອເປັນການທໍາຄວາມເຂົ້າໃຈເຖິງສັກກະຍາພາບທາງດ້ານເສດຖະກິດ ແລະ ສງແວດລອມ ທກຽວພນເຖງການການດເຂດນາໃຊທດນ ສິ່ງແວດລ້ອມ ທີ່ກ່ຽວພັນເຖິງການກໍານົດເຂດນໍາໃຊ້ທີ່ດນ ິ ແບບຈໍາລອງການມີສ່ວນຮ່ວມ 3 ມິຕ: ພາຍໃຕ້ການສະເໜີທັດສະນີຍະພາບທາງພື້ນທີ່ ິ ແລະ ການປຶກສາຫາລື ກ່ຽວກັບຂອບເຂດຊາຍແດນ ກັບພາກສ່ວນທີ່ກຽວຂ້ອງທີ່ແຕກ ່ ຕ່າງກັນ ສ້າງແບບຈໍາລອງໃນການເຈລະຈາຕໍ່ລອງກັນ ໂດຍການນໍາໃຊ້ຄອມພິວເຕີ້ ເພື່ອປະເມີນຜົນກະທົບ ໃນການວາງແຜນຈັດການຄຸ້ມຄອງການນໍາໃຊ້ທີ່ດິນ ໃນລະດັບບ້ານ ແລະ ກຸ່ມບ້ານ 2
  3. 3. 02/03/2012 Village meeting PLUP introduction to the village Selection of the 12 members of the Village Land  Management Committee (VLMC)   g ( ) ‐ Balanced sample of social classes, gender and ethnicity Social‐economic dataHousehold  surveyVillage socio-economic data and land tenure analysis g yFocus groups (men and women separately)• Village problem census• Wood and NTFP mapping• Wildlife management• Population trends 3
  4. 4. 02/03/2012 PLUP Fiction role play Eliciting PLUP ParametersBourgoin J. and Castella J-C. (2011) ‘PLUP Fiction’: Landscape simulation for participatory land-use planning in northern Lao PDR.Mountain Research and Development 31(2): 78-88. 4
  5. 5. 02/03/2012Eliciting PLUP Parameters 5
  6. 6. 02/03/2012 Simulation ‐ Zoning  Landscape design: an iterative negotiation process 6
  7. 7. 02/03/2012Scenario exploration Land grabbing scenario REDD+ scenario 7
  8. 8. 02/03/2012 STEP 2. Village zoning• Building a 3D model of the village landscape• D li Delineating village boundaries ti ill b d i• Negotiating the village’s future on the 3D model using  the knowledge acquired during the landscape  simulation (PLUP Fiction) Building the 3D model 8
  9. 9. 02/03/2012Building the 3D model 9
  10. 10. 02/03/2012 10
  11. 11. 02/03/2012Delineating village boundariesDelineating village boundaries 11
  12. 12. 02/03/2012GPS surveyGPS survey 12
  13. 13. 02/03/2012 13
  14. 14. 02/03/2012 Village boundaries – GPS verification Village zoning/planning Engage villagers in iterative zoning negotiations Village socio‐ Planning on P3DM economic data in  Zones relation to land‐use Iterations 1 Capture – camera 2 Digitize – GIS … ‐> Areas n Cost/benefit  assessment Final Consensual planBourgoin J, Castella J.C., Pullar D., Lestrelin G., Bouahom B. (2012) Toward a land zoning negotiation support platform: “Tips and tricks”for participatory land use planning in Laos. Landscape and Urban Planning 104: 270– 278. 14
  15. 15. 02/03/2012Zones delineation 15
  16. 16. 02/03/2012Zones delineation 16
  17. 17. 02/03/2012Cost‐benefit assessment 17
  18. 18. 02/03/20123.2 – Village zoning– Kumban zoning 18
  19. 19. 02/03/2012 Village cluster – Land Use Planຄວາມສໍາຄັນຂອງການເຊື່ອມຕໍ່ກິດຈະກໍາການສົ່ງເສີມ ກັບວຽກງານ ວດຮ• ເພື່ອໃຫ້ແຜນການ ການນໍາໃຊ້ທີ່ດິນທີ່ໄດ້ກໍານົດຂື້ນ ປະກດຜນເປນຈງ ປະກົດຜົນເປັນຈິງ• ຮູບແບບການເຊື່ອມຕໍ່ ກິດຈະກໍາການສົ່ງເສີມກັບ ວຽກງານ ວດຮ ກດຈະກາການ ກິດຈະກໍາການ ບານ ້ ແຜນພັດທະນາບ້ານ ສົ່ງເສີມໂດຍ: ຫ້ອງການ ກະສິກໍາ ເມືອງ 19
  20. 20. 02/03/2012 ຂັ້ນຕອນໃນການວາງແຜນພັດທະນາບ້ານ• ຊາວບ້ານຈະມີແຜນການນໍາໃຊ້ທີດິນແຕ່ລະປະເພດຕາມທີ່ ເຂົາເຈົ້າໄດ້ກໍານົດຂື້ນ ປະເພດດິນ ກິດຈະກໍາທີ່ຕ້ອງການເຮັດ ພືດຄົງທີ່ ອ້ອມຮົ້ວສວນປູກພືດຄົງທີ່ດ້ວຍໜາມໝາກຈັບ. ຢາກປູກພືດຊະນິດໃໝ່ສໍາລັບໃຊ້ເກືອສັດລ້ຽງ , ປັບປຸງດິນ ແລະ ພືດໝູນວຽນ ປູກພືດເປັນສິນຄ້າ. ຢາກປູກກາເຟ ແລະ ໝາກນໍ້າມັນ , ຢາກຂະຫຍາຍເນື້ອທີ່ປູກ ສວນປູກ ໄມ້ສັກ ເຂດລ້ຽງສັດ ສ້າງເຂດປູກຫຍ້າລ້ຽງສັດ ນາ ປບປຸງລະບບຊນລະປະທານ; ເພມເນອທນາຂນອກໃຫໄດ 9.6 ປັບປງລະບົບຊົນລະປະທານ; ເພີ່ມເນື້ອທີ່ນາຂຶນອີກໃຫ້ໄດ້ 9 6 ້ ຮຕ ສວນ ຢາກສົ່ງເສີມການເຮັດສວນຄົວ ກິດຈະກໍາການສົ່ງເສີມ ໂດຍ: ບ້ານ ແຜນພັດທະນາບ້ານ ຫ້ອງການ ກະສິກໍາເມືອງ ຂັ້ນຕອນໃນການວາງແຜນພັດທະນາບ້ານ(ຕໍ່)• ຂັ້ນຕອນການເຮັດໃຫ້ແຜນພັດທະນາບ້ານກາຍມາ ເປັນກິດຈະກໍາການສົ່ງເສີມປະເພດດິນ ກິດຈະກໍາທີ່ຕອງການເຮັດ ້ ພາກສ່ວນທີ່ຈະໃຫ້ການສະໜັບສະໜູນ ໂຄງການອາກຼີຊຸດຈະຊ່ອຍໜາມໝາກຈັບໃຫ້ສະເພາະເຂດປູກ ພືດຄົງທີ່ ອ້ອມຮົ້ວສວນປູກພືດຄົງທີ່ດ້ວຍໜາມໝາກຈັບ. ຫຍ້າໄວ້ລ້ຽງສັດເທົ່ານັ້ນ. ຢາກປູກພືດຊະນິດໃໝ່ສໍາລັບໃຊ້ເກືອສັດລ້ຽງ ແລະ ປັບປຸງດິນ. (ຊາວບ້ານບໍ່ສົນໃຈກ່ຽວກັບພືດທີ່ຊ່ວຍຟື້ນຟູປ່າເລົ່າຍ້ອນພວກ ໂຄງການອາກຼີຊຸດຈະສະໜອງແນວພັນພ້ອມຈັດເຝິກອົບຮົມກ່່ຽວພືດໝູນວຽນ ເຂົາເຄີຍມີປະສົບການໃນການປູກຖົ່ວແຮ ແລ້ວບໍ່ໄດ້ຮັບຜົນຫຍັງ ກັບຖົ່ວສະໄຕໂລ ຫຍ້າລູຊີ, ກິນີ ໆລໆ ມາແລ້ວ). ຕ້ອງການຄວາມຊ່ວຍເຫຼືອຈາກຫ້ອງການກະສິກໍາ ຫຼື ໂຄງການໃຫ້ ຢາກປູກກາເຟ , ໝາກນໍ້າມັນ ແລະ ຢາກຂະຫຍາຍເນື້ອທີ່ປູກໄມ້ ູ ສວນປູກ ປ ສະໜອງແນວພນໃຫ້ ພອມທງຈາຍຄາຜນຜະລດລວງໜາໃຫເຄງ ັ ໃ ້ ັ ່ ່ ຜົ ຜ ິ ່ ້ ໃ ້ ິ່ ສັກ ໜຶ່ງ.ເຂດລ້ຽງສັດ ສ້າງເຂດປູກຫຍ້າລ້ຽງສັດ ຕ້ອງການໃຫ້ຫ້ອງການກະສິກໍາ ຫຼື ໂຄງການສົ່ງເສີມດ້ານແນວພັນ ນາ ປັບປຸງລະບົບຊົນລະປະທານ; ເພີ່ມເນື້ອທີ່ນາຂຶ້ນອີກໃຫ້ໄດ້ 9.6 ຕ້ອງການຄວາມຊ່ວຍເຫຼືອດ້ານລະບົບຊົນລະປະທານ ແລະ ຮຕ. ຈັກຂຸດຈາກຫ້ອງການກະສິກໍາ ຫຼື ໂຄງການ. ໂຄງການອາກຼີຊຸດຈະເຝິກອົບຮົມດ້ານເຕັກນິກການປູກ ພ້ອມທັງ ສວນ ຢາກສົ່ງເສີມການເຮັດສວນຄົວ ສະໜອງແນວພັນໃຫ້ແກ່ຄອບຄົວທີ່ສົນໃຈ. 20
  21. 21. 02/03/2012 Finalizing maps Preparing PLUP agreement• Signed by village head, land office, agriculture & forest office,  district governor• Description of boundaries• Ri ht Rights and rules d l• … conservation agreement? 21
  22. 22. 02/03/2012 Final village meeting• Reporting PLUP results to villagers and neighboring villages. Thank you for your attention 22

×