Your SlideShare is downloading. ×
Mapping cifor
Mapping cifor
Mapping cifor
Mapping cifor
Mapping cifor
Mapping cifor
Mapping cifor
Mapping cifor
Mapping cifor
Mapping cifor
Mapping cifor
Mapping cifor
Mapping cifor
Mapping cifor
Mapping cifor
Mapping cifor
Mapping cifor
Mapping cifor
Mapping cifor
Mapping cifor
Mapping cifor
Mapping cifor
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Mapping cifor

216

Published on

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
216
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
5
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. 02/03/2012Participatory land use planning in practice Jean‐Christophe Castella Jeremy Bourgoin Successive stages in PLUP action‐research 2009 – Diagnostic study Muongmuay – Viengkham Sopchia Phonxay S hi – Ph 6 villages each Partners: Landscape Mosaics &  TABI, both SDC funded 2010 – Action‐research Muongmuay – Viengkham 6 villages Partners: Landscape Mosaics,  URDP SIDA URDP‐SIDA 2011 – Up‐scaling, extension Viengkham District  25 villages Partners: Agrisud‐EU 2012 – Consolidation Large projects NUDP‐GIZ, IFAD 1
  • 2. 02/03/20122009 PLUP Manual (MAF‐NLMA)principles for PLUP implementation Participation ‐ for improved legitimacy of the process outcomes Integration ‐ scale (rationalizing land use plans across scales),  g ( g p ), ‐ knowledge (conservation‐development trade‐offs) ‐ multiple stakeholders’ perspectivesBUT lack of methodological support ‐> inappropriate on‐the‐ground practicesLestrelin G., Bourgoin J., Bouahom B., Castella J.-C. (2011) Measuring participation: Case studies on village land-use planning in northern Lao PDR.Applied Geography 31:950-958.Lestrelin G., Castella J.-C., and Bourgoin J. (2012) Territorialising sustainable development: The politics of land-use planning in the Lao People’sDemocratic Republic. Journal of Contemporary Asia (in press) ການຈັດຕັ້ງປະຕິບັດ-ສຶກສາຄົ້ນຄວ້າ ເພືອສະໜັບສະໜັບ ່ ການມີສ່ວນຮ່ວມຂອງປະຊາຊົນພາຍໃນທ້ອງຖິ່ນ ‘ຈັດກິດຈະກໍາການວາງແຜນນໍາໃຊ້ທີ່ດິນແບບມີສ່ວນຮ່ວມ’: ຈັດຕັ້ງ ແລະ ອໍານວຍຄວາມສະດວກໃນ ການຫຼິ້ນເກມ ເພື່ອເປັນການທໍາຄວາມເຂົ້າໃຈເຖິງສັກກະຍາພາບທາງດ້ານເສດຖະກິດ ແລະ ສງແວດລອມ ທກຽວພນເຖງການການດເຂດນາໃຊທດນ ສິ່ງແວດລ້ອມ ທີ່ກ່ຽວພັນເຖິງການກໍານົດເຂດນໍາໃຊ້ທີ່ດນ ິ ແບບຈໍາລອງການມີສ່ວນຮ່ວມ 3 ມິຕ: ພາຍໃຕ້ການສະເໜີທັດສະນີຍະພາບທາງພື້ນທີ່ ິ ແລະ ການປຶກສາຫາລື ກ່ຽວກັບຂອບເຂດຊາຍແດນ ກັບພາກສ່ວນທີ່ກຽວຂ້ອງທີ່ແຕກ ່ ຕ່າງກັນ ສ້າງແບບຈໍາລອງໃນການເຈລະຈາຕໍ່ລອງກັນ ໂດຍການນໍາໃຊ້ຄອມພິວເຕີ້ ເພື່ອປະເມີນຜົນກະທົບ ໃນການວາງແຜນຈັດການຄຸ້ມຄອງການນໍາໃຊ້ທີ່ດິນ ໃນລະດັບບ້ານ ແລະ ກຸ່ມບ້ານ 2
  • 3. 02/03/2012 Village meeting PLUP introduction to the village Selection of the 12 members of the Village Land  Management Committee (VLMC)   g ( ) ‐ Balanced sample of social classes, gender and ethnicity Social‐economic dataHousehold  surveyVillage socio-economic data and land tenure analysis g yFocus groups (men and women separately)• Village problem census• Wood and NTFP mapping• Wildlife management• Population trends 3
  • 4. 02/03/2012 PLUP Fiction role play Eliciting PLUP ParametersBourgoin J. and Castella J-C. (2011) ‘PLUP Fiction’: Landscape simulation for participatory land-use planning in northern Lao PDR.Mountain Research and Development 31(2): 78-88. 4
  • 5. 02/03/2012Eliciting PLUP Parameters 5
  • 6. 02/03/2012 Simulation ‐ Zoning  Landscape design: an iterative negotiation process 6
  • 7. 02/03/2012Scenario exploration Land grabbing scenario REDD+ scenario 7
  • 8. 02/03/2012 STEP 2. Village zoning• Building a 3D model of the village landscape• D li Delineating village boundaries ti ill b d i• Negotiating the village’s future on the 3D model using  the knowledge acquired during the landscape  simulation (PLUP Fiction) Building the 3D model 8
  • 9. 02/03/2012Building the 3D model 9
  • 10. 02/03/2012 10
  • 11. 02/03/2012Delineating village boundariesDelineating village boundaries 11
  • 12. 02/03/2012GPS surveyGPS survey 12
  • 13. 02/03/2012 13
  • 14. 02/03/2012 Village boundaries – GPS verification Village zoning/planning Engage villagers in iterative zoning negotiations Village socio‐ Planning on P3DM economic data in  Zones relation to land‐use Iterations 1 Capture – camera 2 Digitize – GIS … ‐> Areas n Cost/benefit  assessment Final Consensual planBourgoin J, Castella J.C., Pullar D., Lestrelin G., Bouahom B. (2012) Toward a land zoning negotiation support platform: “Tips and tricks”for participatory land use planning in Laos. Landscape and Urban Planning 104: 270– 278. 14
  • 15. 02/03/2012Zones delineation 15
  • 16. 02/03/2012Zones delineation 16
  • 17. 02/03/2012Cost‐benefit assessment 17
  • 18. 02/03/20123.2 – Village zoning– Kumban zoning 18
  • 19. 02/03/2012 Village cluster – Land Use Planຄວາມສໍາຄັນຂອງການເຊື່ອມຕໍ່ກິດຈະກໍາການສົ່ງເສີມ ກັບວຽກງານ ວດຮ• ເພື່ອໃຫ້ແຜນການ ການນໍາໃຊ້ທີ່ດິນທີ່ໄດ້ກໍານົດຂື້ນ ປະກດຜນເປນຈງ ປະກົດຜົນເປັນຈິງ• ຮູບແບບການເຊື່ອມຕໍ່ ກິດຈະກໍາການສົ່ງເສີມກັບ ວຽກງານ ວດຮ ກດຈະກາການ ກິດຈະກໍາການ ບານ ້ ແຜນພັດທະນາບ້ານ ສົ່ງເສີມໂດຍ: ຫ້ອງການ ກະສິກໍາ ເມືອງ 19
  • 20. 02/03/2012 ຂັ້ນຕອນໃນການວາງແຜນພັດທະນາບ້ານ• ຊາວບ້ານຈະມີແຜນການນໍາໃຊ້ທີດິນແຕ່ລະປະເພດຕາມທີ່ ເຂົາເຈົ້າໄດ້ກໍານົດຂື້ນ ປະເພດດິນ ກິດຈະກໍາທີ່ຕ້ອງການເຮັດ ພືດຄົງທີ່ ອ້ອມຮົ້ວສວນປູກພືດຄົງທີ່ດ້ວຍໜາມໝາກຈັບ. ຢາກປູກພືດຊະນິດໃໝ່ສໍາລັບໃຊ້ເກືອສັດລ້ຽງ , ປັບປຸງດິນ ແລະ ພືດໝູນວຽນ ປູກພືດເປັນສິນຄ້າ. ຢາກປູກກາເຟ ແລະ ໝາກນໍ້າມັນ , ຢາກຂະຫຍາຍເນື້ອທີ່ປູກ ສວນປູກ ໄມ້ສັກ ເຂດລ້ຽງສັດ ສ້າງເຂດປູກຫຍ້າລ້ຽງສັດ ນາ ປບປຸງລະບບຊນລະປະທານ; ເພມເນອທນາຂນອກໃຫໄດ 9.6 ປັບປງລະບົບຊົນລະປະທານ; ເພີ່ມເນື້ອທີ່ນາຂຶນອີກໃຫ້ໄດ້ 9 6 ້ ຮຕ ສວນ ຢາກສົ່ງເສີມການເຮັດສວນຄົວ ກິດຈະກໍາການສົ່ງເສີມ ໂດຍ: ບ້ານ ແຜນພັດທະນາບ້ານ ຫ້ອງການ ກະສິກໍາເມືອງ ຂັ້ນຕອນໃນການວາງແຜນພັດທະນາບ້ານ(ຕໍ່)• ຂັ້ນຕອນການເຮັດໃຫ້ແຜນພັດທະນາບ້ານກາຍມາ ເປັນກິດຈະກໍາການສົ່ງເສີມປະເພດດິນ ກິດຈະກໍາທີ່ຕອງການເຮັດ ້ ພາກສ່ວນທີ່ຈະໃຫ້ການສະໜັບສະໜູນ ໂຄງການອາກຼີຊຸດຈະຊ່ອຍໜາມໝາກຈັບໃຫ້ສະເພາະເຂດປູກ ພືດຄົງທີ່ ອ້ອມຮົ້ວສວນປູກພືດຄົງທີ່ດ້ວຍໜາມໝາກຈັບ. ຫຍ້າໄວ້ລ້ຽງສັດເທົ່ານັ້ນ. ຢາກປູກພືດຊະນິດໃໝ່ສໍາລັບໃຊ້ເກືອສັດລ້ຽງ ແລະ ປັບປຸງດິນ. (ຊາວບ້ານບໍ່ສົນໃຈກ່ຽວກັບພືດທີ່ຊ່ວຍຟື້ນຟູປ່າເລົ່າຍ້ອນພວກ ໂຄງການອາກຼີຊຸດຈະສະໜອງແນວພັນພ້ອມຈັດເຝິກອົບຮົມກ່່ຽວພືດໝູນວຽນ ເຂົາເຄີຍມີປະສົບການໃນການປູກຖົ່ວແຮ ແລ້ວບໍ່ໄດ້ຮັບຜົນຫຍັງ ກັບຖົ່ວສະໄຕໂລ ຫຍ້າລູຊີ, ກິນີ ໆລໆ ມາແລ້ວ). ຕ້ອງການຄວາມຊ່ວຍເຫຼືອຈາກຫ້ອງການກະສິກໍາ ຫຼື ໂຄງການໃຫ້ ຢາກປູກກາເຟ , ໝາກນໍ້າມັນ ແລະ ຢາກຂະຫຍາຍເນື້ອທີ່ປູກໄມ້ ູ ສວນປູກ ປ ສະໜອງແນວພນໃຫ້ ພອມທງຈາຍຄາຜນຜະລດລວງໜາໃຫເຄງ ັ ໃ ້ ັ ່ ່ ຜົ ຜ ິ ່ ້ ໃ ້ ິ່ ສັກ ໜຶ່ງ.ເຂດລ້ຽງສັດ ສ້າງເຂດປູກຫຍ້າລ້ຽງສັດ ຕ້ອງການໃຫ້ຫ້ອງການກະສິກໍາ ຫຼື ໂຄງການສົ່ງເສີມດ້ານແນວພັນ ນາ ປັບປຸງລະບົບຊົນລະປະທານ; ເພີ່ມເນື້ອທີ່ນາຂຶ້ນອີກໃຫ້ໄດ້ 9.6 ຕ້ອງການຄວາມຊ່ວຍເຫຼືອດ້ານລະບົບຊົນລະປະທານ ແລະ ຮຕ. ຈັກຂຸດຈາກຫ້ອງການກະສິກໍາ ຫຼື ໂຄງການ. ໂຄງການອາກຼີຊຸດຈະເຝິກອົບຮົມດ້ານເຕັກນິກການປູກ ພ້ອມທັງ ສວນ ຢາກສົ່ງເສີມການເຮັດສວນຄົວ ສະໜອງແນວພັນໃຫ້ແກ່ຄອບຄົວທີ່ສົນໃຈ. 20
  • 21. 02/03/2012 Finalizing maps Preparing PLUP agreement• Signed by village head, land office, agriculture & forest office,  district governor• Description of boundaries• Ri ht Rights and rules d l• … conservation agreement? 21
  • 22. 02/03/2012 Final village meeting• Reporting PLUP results to villagers and neighboring villages. Thank you for your attention 22

×