Your SlideShare is downloading. ×
0
Winter Bim Forum Bim After Construction Final
Winter Bim Forum Bim After Construction Final
Winter Bim Forum Bim After Construction Final
Winter Bim Forum Bim After Construction Final
Winter Bim Forum Bim After Construction Final
Winter Bim Forum Bim After Construction Final
Winter Bim Forum Bim After Construction Final
Winter Bim Forum Bim After Construction Final
Winter Bim Forum Bim After Construction Final
Winter Bim Forum Bim After Construction Final
Winter Bim Forum Bim After Construction Final
Winter Bim Forum Bim After Construction Final
Winter Bim Forum Bim After Construction Final
Winter Bim Forum Bim After Construction Final
Winter Bim Forum Bim After Construction Final
Winter Bim Forum Bim After Construction Final
Winter Bim Forum Bim After Construction Final
Winter Bim Forum Bim After Construction Final
Winter Bim Forum Bim After Construction Final
Winter Bim Forum Bim After Construction Final
Winter Bim Forum Bim After Construction Final
Winter Bim Forum Bim After Construction Final
Winter Bim Forum Bim After Construction Final
Winter Bim Forum Bim After Construction Final
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Winter Bim Forum Bim After Construction Final

2,384

Published on

Presentation by Birgitta Foster / Sandia Labs on BIM. Promoted through www.bimworkx.com also located at @bimworkx on Twitter - BIMWorkx.

Presentation by Birgitta Foster / Sandia Labs on BIM. Promoted through www.bimworkx.com also located at @bimworkx on Twitter - BIMWorkx.

Published in: Business, Technology
0 Comments
2 Likes
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
2,384
On Slideshare
0
From Embeds
0
Number of Embeds
3
Actions
Shares
0
Downloads
118
Comments
0
Likes
2
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide
  • Transcript

    • 1. AfterConstruction
      Birgitta Foster
      SSA/Sandia National Labs
    • 2. 1945 : Sandia was created
      1979 :Sandia was made a national laboratory.
      Mission:
      Nuclear stockpile stewardship
      Homeland security
      Antiterrorism/Aviation security
      Tech Transfer
    • 3. www.sandia.gov
    • 4. Four sites ( ~ 1100 bldg, 7M GSF)
      NM (Albuquerque )
      CA (Livermore)
      NV (Tonopah)
      HI (Kauai)
      Sandia NM
      891 Bldgs
      6M GSF
      8700 acres
      Construction : $80 M /YR
    • 5. BIM = Information
      BIM is a database of Building Information.
      • Stores Information
      • 6. Links to information
      ALSO….
      • Extracts information
      • 7. Exchange information
    • BIM after Construction
      Space Planning
      Safety/Security
      Facility Management System - ( FMS)
      Facility Control Systems - (FCS)
      Asset Management applications
      Operation & Maintenance
    • 8. Building Information
      Specifications
      Submittal Information
      Equipment data
      Performance data
      Warranty
      Finishes Information
      O&M manuals
      Panel Schedules
      FCS
    • 9. Building Information Applications
    • 10. BIM : Facilities Management (6D)
    • 11. BIM (6D) : Exchanges Information
      FMS :
      Tririga/ Maximo
    • 12. InformationValue
      Operation
      Construction
      Design
      Planning
      Time
      BIM: Untapped Savings
      $$$$
      $$
      $
    • 13. BIM : Due Diligence Investigation
      Shadow project
      Partnerships
      Software
      Pulsing Industry
      O&M Planning
      Data Integration
    • 14. Accurate As Built Models
      Retrofits
      Migration to BIM
      Attracting new Customers
      BIM : Laser scanning
    • 15. BIM (6D): Bldg Operations Training
      Pantex complex
      Amarillo, Texas.
      (CH2M-Hill)
    • 16. BIM : Untapped Savings
      Inefficiency Costs : $15B/yr
      66% borne by Owners
      Unit cost : $ 0.20/SFT (existing space)
      Est. Costs for Sandia :
      6.0 M GSF
      ~$1.2M / yr
    • 17. BIM : Untapped Savings
      NIST Study Validation:
      “View of the Future “ video
      In-House Planner Survey
      Results
      Saves 2 hours per work order (WO)
      (2 hrs x $50/hr ) x 24,000 WO
      Cost Savings : $2.4 M/year
      Annual Budget : $14M/yr
    • 18. BIM (6D) :Closing the Information Gap
      Paper-based
      Inherent Inefficiencies
      Reentry data
      Multiple databases
      Handoffs
      Locating Information
      But what if it could be like this…………
    • 19.
    • 20. BIM: 6DHow to get started
      Start with O&M group
      What information is needed
      IT and O&M meeting
      FMS Import options
      Selected preferred import format
      Determine fields
      Use on Pilot project
    • 21. BIM: What’s holding Owners back?
      What Owners want :
      Save money
      Centralized Data repository
      Seamless integration with FMS applications
      Save money $$$
      Concerns :
      Education on BIM
      Updating Model information
      O&M Savings are not immediate
      Model sharing
    • 22. BIM:Owners next steps
      Get to know your O&M team
      Investigate integration with
      Facilities Mgt systems
      Building Control systems
      Asset Management system
      Require 6D BIM as a deliverable
      Determine Owner Information needs
      Define 6D BIM data requirements
    • 23. BIM : Sandia Facilities
      SEAMLESS
      INTERFACE
      (Excel -
      Manual)
      INTERFACE
      (Excel – Extracted)
      6D
      Integrated
      MODEL
      FMS
      PHASE A
      PHASE C
      PHASE B
      • Meeting with IT and O&M
      • 24. FMS Import options
      • 25. Selected preferred import format
      • 26. Determine fields
      Use on Pilot project
      Migration plan in process
      Seamless integration – bi directional
      ReceivingIntegrated 6D models
      O&M with models
      Menu
      Integrated 6D model
      Software
      Migration plan ( Road map)
      Internal processes
      BIM team
      Model Management
    • 27. BIMAfter Construction
      QUESTIONS ?
      Birgitta Foster
      btfoste@sandia.gov
    • 28. BIM: 6DHow to get started
      Determine what you need

    ×