Your SlideShare is downloading. ×
Webinar Bim Forum Bim After Construction Final Copyright Version
Webinar Bim Forum Bim After Construction Final Copyright Version
Webinar Bim Forum Bim After Construction Final Copyright Version
Webinar Bim Forum Bim After Construction Final Copyright Version
Webinar Bim Forum Bim After Construction Final Copyright Version
Webinar Bim Forum Bim After Construction Final Copyright Version
Webinar Bim Forum Bim After Construction Final Copyright Version
Webinar Bim Forum Bim After Construction Final Copyright Version
Webinar Bim Forum Bim After Construction Final Copyright Version
Webinar Bim Forum Bim After Construction Final Copyright Version
Webinar Bim Forum Bim After Construction Final Copyright Version
Webinar Bim Forum Bim After Construction Final Copyright Version
Webinar Bim Forum Bim After Construction Final Copyright Version
Webinar Bim Forum Bim After Construction Final Copyright Version
Webinar Bim Forum Bim After Construction Final Copyright Version
Webinar Bim Forum Bim After Construction Final Copyright Version
Webinar Bim Forum Bim After Construction Final Copyright Version
Webinar Bim Forum Bim After Construction Final Copyright Version
Webinar Bim Forum Bim After Construction Final Copyright Version
Webinar Bim Forum Bim After Construction Final Copyright Version
Webinar Bim Forum Bim After Construction Final Copyright Version
Webinar Bim Forum Bim After Construction Final Copyright Version
Webinar Bim Forum Bim After Construction Final Copyright Version
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Webinar Bim Forum Bim After Construction Final Copyright Version

1,542

Published on

A Presentation by Birgitta Foster relating to BIM.

A Presentation by Birgitta Foster relating to BIM.

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
1,542
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
42
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide
  • Cameup with idea for “cleanrooms” used today Antiterrorism/Aviation security. The familiar walkthrough portals at many airport security checkpoints use Sandia-patented technology to screen airline passengers for explosives.Nuclear stockpile stewardship.Sandia plays a key role in efforts to extend the life of nuclear weapons currently in the nation’s stockpile, most of which were produced 30 to 40 years ago. Sandia is continually evaluating components, subsystems, and system performance to ensure the ongoing safety and reliability of the existing arsenal. created in 1945 as the ordnance design, testing, and assembly arm of Los Alamos. In 1948, Sandia Laboratory, a separate branch of Los Alamos. But the growth continued and the Atomic Energy Commission began to look for an industrial firm to manage the engineering facility. President Harry Truman asked AT&T to accept managerial responsibility of Sandia. Western Electric, AT&T's manufacturing arm, accepted the management role on a no-profit, no-fee basis. On November 1, 1949, Sandia Corporation, a wholly owned subsidiary of Western Electric, began managing Sandia. Sandia was made a national laboratory in 1979. In 1993, Martin Marietta took over Sandia's management contract and two years later merged with Lockheed to become Lockheed Martin.
  • Acres of land mass   Number of buildings   Square footage of buildings   Site population*Albuquerque, N.M. site 8,699   871   5,867,909   10,540 Livermore, Calif. Site 410   71   886,176   1,010 Tonopah Test Range (Nevada) 179,200   107   129,724   24 Kauai Test Facility (Hawaii) 132   54   57,560   2 Leased space @ All Other Locations 0   49   554,871   323 Total188,441  1,152   7,496,240   11,899
  • Clear up confusion about what BIM is“Which means that….”
  • Totally missing today…bi directional information flow.
  • Understanding : need to educate through events like thisPost const– how to integrate into existing applicationsSavings – savings are in the long term, not immediate like design/constRIO: implementation costs could be recovered w/in first 5 yrsModel sharing: Redundant models
  • Now well positioned to : Require 6D BIM as a deliverable
  • Transcript

    • 1. AfterConstruction
      Birgitta Foster
      SSA/Sandia National Labs
      February 19, 2010
    • 2. 1945 : Sandia was created
      1979 :Sandia was made a national laboratory.
      Mission:
      Nuclear stockpile stewardship
      Homeland security
      Antiterrorism/Aviation security
      Tech Transfer
      Copyright 2010 by Birgitta Foster
    • 3. www.sandia.gov
    • 4. Four sites ( ~ 1100 bldg, 7M GSF)
      NM (Albuquerque )
      CA (Livermore)
      NV (Tonopah)
      HI (Kauai)
      Sandia NM
      891 Bldgs
      6M GSF
      8700 acres
      Construction : $80 M /YR
      Copyright 2010 by Birgitta Foster
    • 5. Building Information Models (BIM)
      BIM = Information
      BIM is a database of Building Information
      • Stores Information
      • 6. Links to information
      ALSO….
      • Extracts information
      • 7. Exchange information
    • BIM after Construction
      Space Planning
      Safety/Security
      Facility Management System - ( FMS)
      Facility Control Systems - (FCS)
      Asset Management applications
      Operation & Maintenance
      Copyright 2010 by Birgitta Foster
    • 8. Building Information
      Specifications
      Submittal Information
      Equipment data
      Performance data
      Warranty
      Finishes Information
      O&M manuals
      Panel Schedules
      Building Controls System
      Copyright 2010 by Birgitta Foster
    • 9. Building Information Applications
      Copyright 2010 by Birgitta Foster
    • 10. BIM : Facilities Operations & Maintenance
      Copyright 2010 by Birgitta Foster
    • 11. BIM : Exchanges Information
      FMS :
      Tririga/ Maximo
      Copyright 2010 by Birgitta Foster
    • 12. InformationValue
      Operation
      Construction
      Design
      Planning
      Time
      BIM: Untapped Savings
      $$$$
      $$
      $
    • 13. BIM : Due Diligence Investigation
      Shadow project
      Partnerships
      Software
      Pulsing Industry
      O&M Planning
      Data Integration
      Copyright 2010 by Birgitta Foster
    • 14. Accurate As Built Models
      Retrofits
      Migration to BIM
      Attracting new Customers
      BIM : Laser scanning
      2D
      Copyright 2010 by Birgitta Foster
    • 15. BIM : Bldg Operations Training
      Pantex complex
      Amarillo, Texas.
      (CH2M-Hill)
    • 16. BIM : Untapped Savings
      Inefficiency Costs : $15B/yr
      66% borne by Owners
      Unit cost : $ 0.20/SFT (existing space)
      Est. Costs for Sandia :
      6.0 M GSF
      ~$1.2M / yr
    • 17. BIM : Untapped Savings
      NIST Study Validation:
      “View of the Future “ video
      In-House Planner Survey
      Results
      Saves ~2 hours per work order (WO)
      2 hrs x $50/hr = $100/hr
      24,000 WO/yr
      Cost Savings : $2.4 M/year
      Annual Budget : $14M/yr
      Copyright 2010 by Birgitta Foster
    • 18. BIM :Closing the Information Gap
      Paper-based
      Inherent Inefficiencies
      Reentry data
      Multiple databases
      Handoffs
      Locating Information
      But what if it could be like this…………
      Copyright 2010 by Birgitta Foster
    • 19. Copyright 2010 by Birgitta Foster
    • 20. BIM for OperationsOwners:How to get started
      Start with O&M group
      What information is needed
      IT and O&M meeting
      FMS Import options
      Selected preferred import format
      Determine fields
      Use on Pilot project
      Copyright 2010 by Birgitta Foster
    • 21. BIM : Sandia Facilities
      SEAMLESS
      INTERFACE
      (Excel -
      Manual)
      INTERFACE
      (Excel – Extracted)
      O/O
      Integrated
      MODEL
      FMS
      PHASE A
      PHASE C
      PHASE B
      • Meeting with IT and O&M
      • 22. FMS Import options
      • 23. Selected preferred import format
      • 24. Determine fields
      Use on Pilot project
      Owner/Operator Integrated model
      Software
      Migration plan ( Road map)
      Internal processes
      BIM team
      Model Management
      Migration plan in process
      Seamless integration – bi directional
      Receiving O/O Integrated models
      O&M with models
      Menu
      Copyright 2010 by Birgitta Foster
    • 25. BIM: What’s holding Owners back?
      What Owners want :
      Save money
      Centralized Data repository
      Seamless integration with FMS applications
      Save money $$$
      Concerns :
      Education on BIM
      Updating Model information
      O&M Savings are not immediate
      Model sharing
      Copyright 2010 by Birgitta Foster
    • 26. BIM for Owners :What can the Contractors do?
      Educate the Owner
      BIM = Information
      Focus O&M savings
      Show a model to their O&M team
      Hyperlinks
      “ How much time would this save?”
      Facilities Management System(s)
      Copyright 2010 by Birgitta Foster
    • 27. BIMAfter Construction
      QUESTIONS ?
      Birgitta Foster
      btfoste@sandia.gov
      BIMworkx.com
      Copyright 2010 by Birgitta Foster

    ×