ISMI Efficiency Improvement  Initiative:<br />Exploration of Performance Based Improvement strategies and correlation to I...
ISMI primary objective<br />ISMI has recognized Overall Equipment Effectiveness (OEE) rate improvement as a primary target...
ISMI primary objective<br />International Technology Roadmap for Semiconductors (ITRS) requires product performance improv...
ISMI primary objective<br />ISMI interprets efforts by equipment providers to be either inadequate or existent at all.<br />
Improvement by leveraging Web 2.0 strategies<br />Behavioral Scientists have long established performance behavior improve...
Improvement by leveraging Web 2.0 strategies<br />These theories and models are currently being reexamined by leading Univ...
Improvement by leveraging Web 2.0 strategies<br />One approach key is linking Knowledge with Assets and properly applying,...
Training System Solution<br />Integrating key tools and process directly into a social contribution effort leverages intel...
Web 2.0 development<br />Using industry standards<br />Design ‘skeleton’ and apply to emulator frame<br />Solicit SME deve...
KBI specializes in the field of semi-conductor training support<br />10 yrs Semi Conductor equip and process experience<br...
Upcoming SlideShare
Loading in...5
×

Ismi Efficiency Improvement Initiative V5

380

Published on

Brief overview of the ISMI improvement challenge and an under appreciated improvement suggestion.

Published in: Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
380
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "Ismi Efficiency Improvement Initiative V5"

  1. 1. ISMI Efficiency Improvement Initiative:<br />Exploration of Performance Based Improvement strategies and correlation to ISMI goals<br />
  2. 2. ISMI primary objective<br />ISMI has recognized Overall Equipment Effectiveness (OEE) rate improvement as a primary target for improvement opportunity<br />
  3. 3. ISMI primary objective<br />International Technology Roadmap for Semiconductors (ITRS) requires product performance improvements in order to maintain pace with Moore&apos;s Law.<br />
  4. 4. ISMI primary objective<br />ISMI interprets efforts by equipment providers to be either inadequate or existent at all.<br />
  5. 5. Improvement by leveraging Web 2.0 strategies<br />Behavioral Scientists have long established performance behavior improvement theories and models.<br />
  6. 6. Improvement by leveraging Web 2.0 strategies<br />These theories and models are currently being reexamined by leading Universities providing outlines for successful learning solutions .<br />Massachusetts Institute Technology<br />
  7. 7. Improvement by leveraging Web 2.0 strategies<br />One approach key is linking Knowledge with Assets and properly applying, measuring and adjusting until behavior improves.<br />
  8. 8. Training System Solution<br />Integrating key tools and process directly into a social contribution effort leverages intellectual assets<br />Applied knowledge is redistributed for further ‘on demand’ opportunities<br />The ADL standard of distributed Learning is applied, ensuring maximized reuse and distribution <br />
  9. 9. Web 2.0 development<br />Using industry standards<br />Design ‘skeleton’ and apply to emulator frame<br />Solicit SME development input<br />Code and refine SME inputs for delivery in product<br />Convert to full web delivery product<br />
  10. 10. KBI specializes in the field of semi-conductor training support<br />10 yrs Semi Conductor equip and process experience<br />15 yrs Instructional System Design (ISD)<br />SCORM development ready<br />Palbert@KnowledgeBrokerInc.com719-494-6478<br />

×