1. March 20
KHA
Per
Dat
Nat
Ma
Add
Tele
Lan
Me
Em
Edu
Bach
5 Ye
Grad
Pro
Over
const
Exper
prepa
mater
engin
client
obser
malls,
mosq
015
ALED RE
rsonal Profi
te of Birth: S
tionality: Egy
arital Status:
dress: 4C, St
ephone: +20
nguages: Ara
Eng
ember of: Egy
Fe
Af
ail:kagroudy
ucation
helor’s degre
ears, overall g
duation Proj
ofessional E
18 Years of
ruction docu
rienced in ide
aration of in
rials, finishe
eering elem
t in obtain
rvation of wo
, office bui
ues, and edu
Handling and
Preparation
Design appro
Design deve
Materials inv
Setting time
for team me
Technical re
Coordination
Supervision
methods of
Documentat
Data gatheri
Design by M
EFAAT
ile
September 2
yptian.
Married.
reet 199, De
0100 39 6666
abic, Mother
glish, Writte
yptian Syndi
ederation of A
filiate Societ
y@gmail.com
ee in Archite
grade (Good
ect “World T
Experiences
f Experience
uments, zoni
entifying fun
nformation r
s, equipmen
ments into u
ing bids an
ork during co
ldings, bank
ucational bu
d supervising
of technical
oach setting
lopment for
vestigation,
frame and l
embers in acc
viewing arch
n with specia
of finishes
statements.
tion of existi
ing, analysis
Models.
ELAGR
0th 1973.
egla District,
60 , +20122 7
Tongue.
n and Spoke
cate of Engin
Arab Enginee
ty of Enginee
m
ecture, Facult
d).
Trade Centre
s
e in architec
ing, building
nctional and
regarding ex
nt, and const
unified desig
nd awardin
onstruction,
ks, resident
ildings.
g different te
proposals a
for competi
on‐going pr
selection an
ist of deliver
cordance wit
hitecture doc
alty consulta
works carr
ng buildings
and prepara
ROUDY
Elmaadi, Cai
730 9444
en (Very Goo
neers 13/352
ers 16/79515
ers UAE 12‐2
ty of Enginee
e“ Distinction
ctural plann
codes, and b
spatial requ
xisting proje
truction time
gn; preparing
ng construct
including pu
ial complex
eams and dif
nd budget es
itions or for c
ojects throu
d details gen
rables for dif
th contractu
cuments aga
ants, client’s
ied out at
.
ation of tech
ro.
od).
28.
5.
46.
ering, Cairo U
n 94.2%.
ing, design,
building mat
uirements of
cts; design,
e; planning l
g scale draw
tion contra
ublic building
es, wareho
fferent proje
stimation.
conceptual d
gh different
neration.
fferent proje
ual obligation
ainst codes &
requirement
site in acco
nical researc
University (Ju
applying kn
terials.
new project
specificatio
layout of pro
wings for bu
cts, conduc
gs, industria
uses, resort
ects.
design phase
phases.
ect’s stages a
ns and ethics
& regulation.
ts and codes
ordance with
ches.
uly96)
nowledge of
ts or renovat
ns, estimate
oject and int
uilding; repr
cts periodic
l buildings, s
ts, touristic
e.
and tasks bre
s of professio
s & regulatio
h specificati
1
f design,
tion, and
ed costs,
tegrating
resenting
c on‐site
shopping
villages,
eak down
on.
ns.
ions and
2. March 2015 2
Employment History
2008‐Date, ECG Engineering Consultants Group S.A. Cairo, Egypt; Principal Architect &
Deputy Architecture Department Manager for Smart Village branch, Responsibilities include
supervising the architectural engineering team as deputy architectural department manager;
Designs for ECG projects and ensuring compliance with the planned objectives, implementing
specific architectural works in accordance with project work program; organizing and managing
the work of architects and draftsmen; providing relevant architectural engineering support
and/or advice to project teams; verifying that all architectural design, drawings and documents
are to current codes and standards and in accordance with Company policies and standards;
liaising with consulting engineers, and/or contractors on all implementation matters for the
following projects:
▪ Warehouse Park – Design Consultancy, KAEC‐IV, KSA.
The Project is a part of King Abdullah Economic City (KAEC), as the Employer intends to develop
and operate the first pre‐built warehouse facilities in KAEC located in a gated and secured
Industrial Valley (IV) community for logistics, storage & distribution, light manufacturing and
assembly projects targeting a wide range of businesses including local and international tenants
as the main objective of the Scope is to provide an attractive, flexible and efficient design to
follow the highest quality, sustainability and aesthetics standards.
▪ Phase 2 of New Natural Gas Liquid (NGL) Support Campus at Mesaieed, Qatar.
The New NGL Support Campus is being developed on a 330,383 m2 area, located at south west of
Masaieed Industrial City along Sea line Road. The campus is built on L‐shaped strip of land
consisting of new NGL laboratory, new administration & canteen building, mosque, central
workshop, transport depot, fuel vending facility, warehouses and stores.
▪ General Directorate of Military Works (GDMW) Riyadh Medical Complex, KSA.
ECG scope of work included detailed design of the Core Medical Hospital and Emergency Medical
Center, Oncology Hospital and Outpatient Clinic, Polyclinic and Day Surgery, Central Laboratory,
Pharmacy, Medical Administration Building and Conference Center, par king structure,
infrastructure design for medical and service zone, infrastructure design for main roads of
residential and university zones and utilities buildings.
▪ Atlantic Industries Cairo Concentrate Plant Fire Protection, Egypt.
The client entrusted ECG with a broad scope of work to construct a fire protection system for
their plant. The project scope comprised design firefighting water tank and flammable material
storage design, and construction supervision of the fire protection system for the Coca‐Cola
(Atlantic Industries) concentration plant.
▪ Holdipharma, Pharmaceutical Plants for CID & Kahira Companies, 6th
of October City, Egypt.
The project comprises the construction of two new pharmaceutical plants for HoldiPharma on a
land area of 140,000 m2, CID pharmaceutical plant (75,000 m²) and Kahira Pharmaceutical plant
(65,000 m²),The two new pharmaceutical plants shall be constructed on Holdipharma new land
area in 6th of October city on a land area of 65 000 m² for CID plant and 75 000 m² for Kahira
plant.
▪ Prototype Buildings ‐ Interior Ministry – KSA.
Shop drawing preparation and full coordination for prototype buildings for the Ministry of
Interior in Saudi Arabia for project main contractor.
3. March 2015 3
▪ National Bank of Egypt – Nabq& Makram Ebied Tower Branches, Egypt.
Design, coordination and detailed design drawings of two (2) branches in Nabq & Makram Ebied
Tower.
▪ Eldomiaty Administration Building (Domiatec), Elobour City, Egypt.
Design, coordination and detailed design drawings of a new 3‐storey office building 3 500 m²
area, fence and ancillary building.
▪ Alexandria East Waste Water Treatment Plant, Alexandria, Egypt.
Architectural shop drawings of the project consists of two parts, The first part of rehabilitation
and extension work to provide primary treatment for an additional average raw wastewater
inflow of 190,000 m³/day, The second part will improve the treatment process to the secondary
level and has been designed to handle an average raw sewage inflow of 800,000 m³/day.
▪ Le Méridien Pyramids Hotel, Elharam, Egypt.
Under Le Méridien Pyramids Hotel project, ECG was engaged in the renovation of the existing
hotel building Conceptual design of Guest Wing elevations, the wing of 172 rooms as extension
for Le Méridien Pyramids Hotel.
▪ Design Services for Madinaty Projects, Madinaty, Egypt.
Shop drawing preparation and full coordination for Central services area at city of international
standards in Egypt". Madinaty is a city built on 8 thousand Feddans.
▪ Provision of Power Supply for PS 4&5, Sudan.
Design & Detailed design preparation of pump stations 4&5 from the National Electrical
Corporation (NEC) grid and step it down before the tie‐in to the existing system.
▪ El Sewedy Electric Administrative Building, New Cairo, Egypt
Design Development and detailed design preparation fully coordinated to build an administrative
building over a land area of about 7,260 m2 located in New Cairo, Egypt. The building comprises
two basements each 6600 m², a ground floor and six above ground floors each 1,815 m². The
ground and above ground floors are built over 25% of land area.
▪ Al‐Dammam International Specialty Hospital, Al‐Dammam, KSA.
Architectural conceptual design development and coordination of Al‐Dammam International
Specialty Hospital, The large‐scale, triple‐tower medical complex aims to deliver state‐of‐the‐art
medical care to Saudi citizens and foreign expatriates, over total built‐up area of 120,000 m², the
400‐bed general hospital displays a wide spectrum of core departments.
▪ Marine and Infrastructure Works for Aladabeya Port, Red Sea, Egypt.
Shop drawing preparation and full coordination for buildings, water tanks, services and fences of
Aladabya Port
▪ OQYANA World First, Dubai, UAE.
Technical reviewing of architecture drawings through Design Phases of OQYANA World First, The
project is an archipelago of man‐made islands making up the countries of Australasia on THE
WORLD Project. OQYANA, the world's first fully master planned island retreat extends over a
total area 2 million m² of seawater comprising of twenty (20) reclaimed islands with an upland
area of 417,000 m² , The Islands lie 4 km off the coast of Dubai.
4. March 2015 4
2006‐2008, CDC Community Design Collaborative (PhD Abdelhalim Ibrahim). Cairo, Egypt;
Senior Architect. Responsibilities included design; implementing architectural works (planning,
data collection, design, working drawings, tender documents, etc.) in accordance with the
working program of a project; organizing and managing the works of assigned architects;
verifying that all architectural designs and drawings are to current codes and standards; liaising
with consulting engineers and/or contractors on all matters necessary for the implementation of
the work program of a project in addition to preparation of presentations for the following
projects:
▪ Mudon Cities of Arabia, Dubai, UAE
Mudon, meaning 'cities' in Arabic, will incorporate five historic cities, main duty as member of the
design team member and as team leader of the project at the schematic design phase for
Damascus, and Marrakech city centers‐ within one large city. The architecture of each of the
cities will resemble its real‐life counterpart, include Residential buildings, Retail stores, Cafés,
Restaurants and Hotel with an authentic living experience and a modern luxurious lifestyle.
▪ Shindagha Heritage Oasis, Dubai, UAE.
Taking part as designer at the Shindagha Heritage Oasis, The public park located at Al Shindagha
village or neighborhood at the northern side at the mouth of Dubai's creek, the park comprising
small museum amphitheater, kids’ areas, café & family areas.
▪ AKF ( Elkhalediah ) Estate House and Farm, Delta, Egypt
Senior Designer of AKF Estate House and Farm & Horses Ranch located at Egypt delta the total
area of 140 feddans.
▪ Elzohour Club Competition, New Cairo, Egypt.
Member of the design team winning the first prize of Elzohour Club Competition.
1998‐2006, A.Moez & Moh.Hegazy (AMMH), Engineering Consultants, Junior to Senior
Design Architect. Responsibilities included: data collection; site supervision; architectural design;
working drawings and detailing as well as coordination between engineering disciplines.
▪ Academy Of Judiciary Studies, 6th
of October City, Egypt.
Member of the design team winning the first prize of The Academy Of Judiciary Studies, also
member of design developing team generating the working drawings and details of the project at
different project phases, the project located at the main central area at 6th
of October city, The
project comprising Conference halls, administration, library, three judicial collages and 300 rooms
hotel on a land area of 50 feddans.
▪ Maadi City Centre, New Cairo, Egypt.
Member of the Design, Design Development and Supervision teams at Maadi City Centre Mall &
Maadi City Centre Extension.
▪ Alexandria City Centre, Alexandria, Egypt.
Member of the Design, Design Development and Supervision teams at Alexandria City Centre
Mall & Maadi City Centre Extension.
▪ Carrefour Dandy Mall, Cairo Alexandria Desert Road, Egypt.
Member of the detailed design and site supervision of Carrefour fit out at Dandy Mall.
5. March 2015 5
▪ Bin Rashid Residential & Commercial Complex, Bur Dubai Bus Terminal, Elghubaiba, UAE.
Member of the Design and Design Development team duties included generating Elevations and
details of the complex.
▪ Grand Egyptian Museum, Elharam, Egypt.
▪ Nad Elhamaar Mosque, UAE.
Member of the design team, Minaret design and detailed design for the mosque.
1996‐1998, CDC Community Design Collaborative (PhD Abdelhalim Ibrahim) . Cairo, Egypt; Part
time junior designer, Participated in preparing designs, preliminary and working drawings for
Imam Mohamed Bin Soaud Mosque, Elderayah KSA; Eltameer Commercial center Riyadh; KSA;
Ibb University competition, Ibb, Yemen; Egyptian Consulate, Jeddah KSA; Ministry of Health
Completion second prize, Riyadh KSA.
Training Courses and Fairs
BAU 2015 & Bautec Architectural Materials Trade fair.
Warehouse Logistics and storage requirements planning.
Decision Making & Problem Solving.
Introduction to Fire Safety.
Introduction to HVAC Systems for architects.
Personal Skills
Computer Skills: (AutoCAD ‐ ArchiCad ‐ Adobe Photoshop ‐ Microsoft Office).
Manual Skills: (Water Colouring ‐ Model Making).
Referees
Arch/ Adel Saleh, Architecture Department Manager ECG +2 01067700210
Arch/ Ehab Abdelaziz Design Manager CDC +2 0100 506 21 88.
Eng/ Ibrahim Hegazy Vice President AMMH +2 0122 216 46 39.
Hobbies:
Sports (Fishing ‐ Football ‐ Squash ‐ Swimming ‐ Horseback Riding).
Reading Books & Listening to Music
6. 23/02/2015 04:06CV
NATIONALITY
KHALED ELSAYED R. M. ELAGROUDY
EG
LANGUAGES
AB and EN Fluent
GE Fair
EDUCATION AND PROFESSIONAL QUALIFICATION
BSC , ARCH ENG , CAIRO , 1996
ARCHITECTMember of the Egyptian Syndicate of Since 1996
2126
2114
2039
1835
1977
1883
Projects
29/01/2015
25/12/2014
25/09/2014
07/08/2014
24/07/2014
06/02/2014
From To
29/01/2015
29/01/2015
02/10/2014
21/08/2014
18/09/2014
02/10/2014
M Month
0.1
1.1
0.3
0.3
0.1
3.5
Tot M Month
1.6
19.1
89.5
157.7
4.7
266.9
4.35%
5.60%
0.36%
0.18%
2.33%
1.30%
% RoleProj No
SCHOOL CAMPUS IN AL-MUHAMMDIYAH DISTRICT
JEDDAH
KAEC - IV - WAREHOUSE PARK - DESIGN
CONSULTANCY
UNILEVER FACTORY
PUBLIC PROSECUTION OFFICE BUILDING
AL ANDALUS MIXED USE TOWER
TWO TOWERS IN LUSAIL AREA
The project is existing steel structured building. The approximate foot print area is 5,412 m2 and the total built up area is 13,500 m2. The site is located at the 4th industrial zone in 6th
of October industrial city consisting of the following areas (A buffer warehouse/stocking area, Process area, Packing hall, Loading area, Amenities).
With a built-up area of 14,772m2, the building consists of a ground floor and 5 floors. The building floors are designed as open-space areas to accommodate the Authority's
requirements and comprise various departments with associated services; Attorney General's office; administrative offices; a main conference hall with capacity of 200 persons; VIP
reception hall; waiting areas; additional three elevators, male/female restrooms, male/female prayer rooms, snack kitchen, exit stairs and service elevators.
With a total BUA of 48,000m2 and Plot Area of 8,000m2, the project consists of a mixed-use tower with two basements and no height restrictions, encompassing 5-star hotel
(Millennium Hotel), hotel apartments in addition to a commercial area.
The project comprised the design of two mixed use towers of plots (5870m2) located in the corner of two major roads within the development. The total Built-up Area: 20545m2.
Over 19 Years of Experience ( 7 Years with ECG ) in..........
Task M Month %
-
DATE OF BIRTH
20/09/1973
EXPERIENCE
7. 23/02/2015 04:06CV
1772
1770
1729
0582
1345
1499
1594
0859
1538
1233
Projects
27/09/2012
24/05/2012
22/12/2011
07/04/2011
31/03/2011
31/03/2011
17/02/2011
13/01/2011
06/01/2011
06/01/2011
From To
06/11/2014
01/11/2012
07/03/2013
07/04/2011
07/04/2011
31/03/2011
27/09/2012
27/01/2011
06/01/2011
15/12/2011
M Month
16.4
2.9
2.1
0.0
0.1
0.1
3.9
0.1
0.1
0.3
Tot M Month
788.9
1274.0
181.3
412.5
215.1
197.5
54.6
2339.9
316.5
139.9
2.07%
0.22%
1.16%
0.01%
0.05%
0.03%
7.15%
0.01%
0.02%
0.20%
% RoleProj No
PHASE 2 OF NEW NATURAL GAS LIQUID (NGL) SUPPORT
CAMPUS AT MESAIEED
GENERAL DIRECTORATE OF MILITARY WORKS (GDMW)
RIYADH MEDICAL COMPLEX
ATLANTIC INDUSTRIES CAIRO CONCENTRATE PLANT
FIRE PROTECTION
WHO OFFICE BUILDING
MILLENNIUM RESORT HOTEL, RH002 - MINA AL-ARAB
SODIC EASTOWN NEW CAIRO BLOCKS 3-4-C-9
HOLDIPHARMA NEW PHARMACEUTICAL PLANTS FOR
CID & KAHIRA COMPANIES
Ministry of Communications and Information Technology at
Smart Village
Horus New Pharmaceutical Plant
CONCORDIA OFFICE BUILDING AT SMART VILLAGE
The facility consists of new NGL laboratory, new administration building, canteen building, mosque, central workshop, transport depot, fuel vending facility, warehouse and stores.
The facility includes new NGL laboratory building including metallurgy and corrosion laboratory, finished product laboratory, sulphur laboratory, gas chromatograph laboratory,
analytical laboratory, physical laboratory and environmental laboratory.
ECG scope of work included detailed design of the Core Medical Hospital and Emergency Medical Center, Oncology Hospital and Outpatient Clinic, Polyclinic and Day Surgery, Central
Laboratory, Pharmacy, Medical Administration Building and Conference Center, parking structure, infrastructure design for medical and service zone, infrastructure design for main
roads of residential and university zones and utilities buildings.
The project scope comprised design and construction supervision of the fire protection system for the CocaCola (Atlantic Industries) concentration plant.
A new multi-storey office building for the WHO Eastern Mediterranean Regional office. The building complex offers a built-up area of 29,500 m2 to be constructed in two phases
13,750 m2 and 15,750 m2 respectively.
The resort stretches over a 50,000m2 plot area whilst entertaining a vast 840m beach perimeter. The luxury five-star beach development encompasses two village clusters unveiling
300 rooms/suites and a series of entertainment amenities.
Blocks "3,4,C,9" is set amongst the heart of Eastown. About 80,270m2 BUA (Commercial = 71,278m2, Retail = 8,992m2). They form a square and are linked in the center by the 3,4,C &
9 Central Square.
The project comprised the construction of two new pharmaceutical plants on a land area of 140,000m2, CID pharmaceutical plant (75,000m2) and Kahira Pharmaceutical plant
(65,000m2). ECG scope includes underground water tanks, wastewater treatment plants, roads, service buildings, fences, landscape, administration buildings, laboratories,
warehouses and other facilities.
The project comprised the design, management, and construction supervision of the 40-acre MCIT Complex in Smart Village along the Cairo-Alexandria Desert Road. The complex
encompasses a series of buildings including the Administration Building, the Training Center; the National Center for Documentation of Civilization and National Heritage; the Center of
Organization of Communication Infrastructure; and Union of Communications and Data Technology. The complex buildings are currently undergoing a major development to be LEED
certified.
Over a land area of 125,000m2 and with a built-up area of 64,000m2, the pharmaceutical plant's main production area includes solid production, sterile production and penicillin
production and auxiliary buildings. The project's development will be completed by the year 2021 over 3 phases aiming to achieve an annual solid production capacity of 2.5 billion
tablet and 1.38 Billion capsules and sterile production of 126 Million ampoules (< 10 ml) and 2.2 Million ampoules (<60 ml).
A new building consisting of two (2) basements, ground floor and five (5) floors with foot print area (1,000 m2).
Task M Month %
8. 23/02/2015 04:06CV
1181
1541
1351
1119
1346
1444
1151
1437
1010
1379
1354
Projects
30/12/2010
22/07/2010
24/06/2010
18/03/2010
24/12/2009
17/12/2009
01/10/2009
10/09/2009
06/08/2009
07/05/2009
19/03/2009
From To
06/01/2011
16/06/2011
22/07/2010
29/12/2011
25/10/2012
17/12/2009
08/10/2009
17/06/2010
27/08/2009
21/05/2009
02/02/2012
M Month
0.1
3.8
0.1
1.8
0.7
0.1
0.2
0.5
0.1
0.2
4.6
Tot M Month
17989.3
107.2
72.1
556.9
260.6
468.0
314.9
119.2
132.7
6.9
129.5
0.00%
3.58%
0.17%
0.32%
0.25%
0.01%
0.06%
0.39%
0.05%
3.34%
3.56%
% RoleProj No
QUALITY CONTROL FOR THE CONSTRUCTION OF
MADINATY SEVERAL COMPONENTS
PROTOTYPE BUILDINGS - INTERIOR MINISTRY - KSA
National Bank of Egypt - Assiut & Red Sea Branches
DOMIATEC GROUP ADMINISTRATION BUILDING
Alexandria East Wastewater Treatment Plant
PALM HILLS GOLF EXTENSION PROJECT
Le Meridien Pyramids Hotel
DESIGN SERVICES FOR MADINATY PROJECTS
Alexandria Chemicals Terminal (ALX-CT) Plant
PROVISION OF POWER SUPPLY FOR PS 4&5
EL SEWEDY CABLES ADMINISTRATIVE BUILDING
The project comprised the construction of Madinaty villas and apartments encompassing 364 apartment buildings in the first area, 109 apartment buildings in the sixth area, 1105 villas
in villa area, and all related infrastructure for these areas.
Shop drawing preparation for eleven prototype buildings for the Ministry of Interior in Saudi Arabia.
Construction, renovation and upgrading of two (2) branches in Assiout and Red Sea region. The reconstruction process comprises elevations' cladding replacement, interior
refurbishment, and mechanical/electrical/ plumping system.
The project consists of one (1) building with a total foot print of 3,500 m2 comprising basement (3,200m2), ground floor (3,500m2), first floor (3,500m2) and pyramid sky light above
roof.
The project comprised the provision of consultancy services, preparing permit and construction documents for the construction of about 1,100 villas and townhouses in addition to
preparing the infrastructure networks for the entire project.
The project comprised the renovation of the existing hotel building, associated recreational area, and supporting facilities. Entertaining a land area of 1,631m2, the hotel building
included two basements, a ground floor, three typical floors, and a roof floor with plant room for chillers and cooling towers. ECG was also involved in the development of a 126-room
guest wing extension.
The project components comprised 13 chemical storage tanks of capacities ranging from 850-2,100m3. At the harbor quay, a chemical receiving station was set up to secure
conveyance of industrial chemicals to the chemicals storage tanks via 3 extended piggable pipelines. Other terminal elements included a truck loading station; nitrogen generators; a
cutting-edge control unit adopting a programmable logic controller system; an administration building housing a control room and laboratory; along with all other service utilities.
Over a land area of about 7,260m2 , the building comprises two basements 6,000m2, a ground floor and six above ground floors 1,815m2. The ground and above ground floors are
built over 25% of land area.
Task M Month %
9. 23/02/2015 04:06CV
0060
1457
1391
0040
Projects
18/08/2011
22/04/2010
30/04/2009
13/03/2008
From To
15/11/2012
03/06/2010
29/01/2015
05/02/2015
M Month
0.2
1.0
4.7
23.6
Tot M Month
456.6
345.3
112.4
98514.0
0.03%
0.28%
4.20%
0.02%
% RoleProj No
ECG MANUALS
National Bank of Egypt - Greater Cairo Branches (2)
MARINE AND INFRASTRUCTURE WORKS FOR ALADABEYA PORT
..
The project comprised the design, construction as well as renovation of the bank's branches. The reconstruction process comprises elevations' cladding replacement, interior
refurbishment, and mechanical/electrical/plumping system.
The project comprised harbor engineering and infrastructure works for Aladabeya Port, Suez.
Proposal From To M Month Total M Month % RoleProp No
Others
1376
1177
1137
1191
Projects
19/02/2009
15/01/2009
27/11/2008
27/03/2008
From To
19/03/2009
15/01/2009
27/11/2008
29/01/2009
M Month
1.1
0.1
0.1
7.4
Tot M Month
61.7
311.8
3316.7
231.2
1.72%
0.04%
0.00%
3.22%
% RoleProj No
Al-Dammam International Specialty Hospital
Medical Building Complex - Qassim University
CAIRO FESTIVAL CITY
OQYANA World First
The triple-tower medical complex stretches over a total built-up area of 120,000m2. The 400-bed, 10-storey general hospital displays a wide spectrum of core departments such as
Emergency; Radiology; Laboratories; Pharmacy; Cath Lab; Endoscopy; Surgery; Sterilization; Maternity; Nursery; Intensive Care; and Physical Therapy. Ease of circulation is viably
secured between all hospital components. In addition, there are 56 out-patient clinics, a series of centers engaged in Cardiology; In Vitro Fertilization; Kidney Dialysis and
Labor/Delivery. Supporting departments comprise Administrative, Maintenance, Custodian Services, Laundry departments, Central Kitchen and the electromechanical ancillary building.
Other luxury hospital amenities entail royal suites; health clubs featuring gyms, dry saunas, jacuzzis, steam rooms, and massage chambers; a banquet hall; restaurants and
cafeterias; and a 6-storey garage.
With a total built-up area of 138,000m2 and total land area of 110,000m2 the complex comprises three faculties, in addition to two Nursing faculties and common facilities serving all
buildings. All faculties surround and have direct access to a four-storey Central Building. The sky-lit structure is a large atrium acting as an entertainment platform entailing an
exhibition hall, coffee shops, cafeterias, prayer facilities, and space for student activities.
With a footprint area of nearly 140,000m2, the masterpiece centre takes on several special themes including a cinema complex, a gourmet hypermarket, restaurants and cafes, a food
court, 250 retail shops, in addition to family entertainment centre. The retail village comprises ten buildings accommodating 70 retail units that surround a romantic lake. Outdoor leisure
attractions uncover a palm tree-lined promenade and a park entertaining luxurious landscaped gardens. Total car parking space area amounts to 210,000m2 furnishing over 7,000
slots.
The World's first fully master planned island retreat extends over a total area of 2 million m2 of seawater comprising 20 reclaimed islands with an upland area of 420,000m2. OQYANA
is destined to be a fully harmonized mixed-use lifestyle through a mixture of sea view luxury units with a total built-up area of 771,000m2 including ocean beach villas, coastal beach
villas, canal homes, coral water homes, marina apartments, reef seaside apartments, penthouse apartments and serviced apartments, complimented with commercial and cultural
activities, yacht club, community services, aquarium, five hotels, state-of-the-art spa in addition to ferry terminals and marinas.
Task M Month
Task M Month
%
%
9.73%4.40.418/12/201411/12/20149015 KAEC - IV - WAREHOUSE PARK - DESIGN CONSULTANCY
10. 23/02/2015 04:06CV
Proposal From To M Month Total M Month % RoleProp No
9.80%
6.52%
13.04%
1.11%
100.00%
7.19%
6.33%
0.65%
6.38%
6.36%
8.45%
3.33%
3.30%
5.26%
3.68%
2.29%
2.88%
6.67%
7.69%
0.95%
100.00%
0.46%
0.69%
4.35%
8.91%
10.53%
1.74%
4.23%
0.5
0.5
0.2
0.9
0.1
1.4
0.8
1.5
1.9
2.2
0.7
2.7
0.9
0.4
1.4
1.3
9.4
1.3
0.7
3.2
0.1
2.2
1.4
0.7
1.0
0.4
3.5
1.9
0.1
0.0
0.0
0.0
0.1
0.1
0.1
0.0
0.1
0.1
0.1
0.1
0.0
0.0
0.0
0.0
0.3
0.1
0.0
0.0
0.1
0.0
0.0
0.0
0.1
0.0
0.1
0.1
04/12/2014
04/12/2014
09/10/2014
18/09/2014
18/09/2014
11/09/2014
04/09/2014
04/09/2014
25/09/2014
11/09/2014
17/07/2014
14/08/2014
10/07/2014
08/05/2014
03/10/2013
12/09/2013
05/09/2013
01/08/2013
30/05/2013
16/05/2013
02/05/2013
29/11/2012
04/10/2012
20/09/2012
13/09/2012
06/09/2012
17/05/2012
26/04/2012
04/12/2014
04/12/2014
09/10/2014
18/09/2014
11/09/2014
11/09/2014
04/09/2014
04/09/2014
21/08/2014
07/08/2014
17/07/2014
10/07/2014
03/07/2014
01/05/2014
03/10/2013
12/09/2013
15/08/2013
01/08/2013
30/05/2013
16/05/2013
25/04/2013
29/11/2012
04/10/2012
20/09/2012
13/09/2012
16/08/2012
10/05/2012
19/04/2012
9549
9560
9391
9303
9313
9300
9281
9235
9018
9185
9151
9120
9115
8913
8288
8228
7860
8125
8012
7970
7835
7176
7398
7342
7321
7247
6898
6765
SPA DESIGN CONSULTANCY SERVICES FOR
ONE NILE AVENUE ?THE NILE CORNICHE?
PROJECT,
MEGA ARABIA LOW/MEDIUM VOLTAGE SWITCH GEARS FACTORY IN
KAEC
AL DAHRA KOHINOOR RICE MILL PROJECT
FIRE WATER SYSTEM FOR NORTH PIER PUMPING AND MONITORING
STATION
MUBARAK ALKABEER PORT BUILDINGS
BAHRAIN WASTE TO ENERGY PLANT
ECS FOR SPORTS COMPLEX AT OPERATIONS CAMP SHAH
CONSULTANCY SERVICE FOR GATEWAY TOWERS AT THE PEARL
QATAR
DESIGN OF LIGHT INDUSTRIAL UNITS
ARCHITECTURAL CONCEPT DESIGN SERVICES FOR AL OULA COMPLEX
- NILE DOMA
ENGINEERING FOR TIER 2 OIL SPILL RESPONSE CENTER AT ZIRKU
ISLAND
MOI KAP 02 PACKAGE C - DETAILED DESIGN SERVICES
CIVIL ENGINEERING & FOUNDATION DESIGN FOR GULF OF EL ZAYT II
120MW WIND FARM
5TH DISTRICT SCHOOL - NEW CAIRO
CONSTRUCTION SERVICES OF NEW BONJORNO COFFEE FACTORY
DEVELOPMENT AND UPGRADE OF TREATMENT PLANT
BARWA NEW CAIRO PROJECT PHASE 1
CENTRALIZED CUSTOM INSPECTION AREA
RENOVATION FOR EPCI GF PLANT IN BANE SWAIF
TUNDUMA BORDER POST
MAF
UNIVERSAL LOGISTICS CENTRE
RETAIL CENTER AT KHAMIS MUSHAIT- KSA
PRINCE BANDAR TOWERS
SOPC - NEW ADMINSTRATION BUILDING
ABC BANK
DESIGN COMPITITION FOR SERVICES COMPOUND AT NEW INDUTRIAL
AREA, QATAR
DETAILED DESIGN & ENGINEERING SERVICES FOR CONTAINER
11. 23/02/2015 04:06CV
Proposal From To M Month Total M Month % RoleProp No
15.22%
0.78%
1.01%
2.63%
6.87%
10.00%
16.00%
3.60%
12.50%
5.16%
11.54%
10.00%
17.11%
22.22%
16.13%
11.38%
4.82%
0.42%
7.69%
6.29%
43.75%
2.08%
13.51%
7.14%
8.77%
1.50%
1.18%
7.14%
0.5
6.4
29.6
4.6
1.3
0.4
0.5
1.1
1.0
8.7
0.5
0.7
0.8
0.3
0.6
1.2
0.8
21.2
0.4
1.6
0.2
0.5
0.4
0.6
0.6
2.0
4.2
1.0
0.1
0.0
0.3
0.1
0.1
0.0
0.1
0.0
0.1
0.4
0.1
0.1
0.1
0.1
0.1
0.1
0.0
0.1
0.0
0.1
0.1
0.0
0.0
0.0
0.1
0.0
0.1
0.1
12/04/2012
05/04/2012
26/04/2012
28/02/2013
15/03/2012
23/02/2012
22/03/2012
16/02/2012
09/02/2012
26/01/2012
29/12/2011
22/12/2011
08/12/2011
08/12/2011
01/12/2011
01/12/2011
17/11/2011
24/11/2011
03/11/2011
03/11/2011
20/10/2011
29/09/2011
15/09/2011
08/09/2011
11/08/2011
30/06/2011
23/06/2011
30/06/2011
12/04/2012
05/04/2012
29/03/2012
22/03/2012
08/03/2012
23/02/2012
23/02/2012
09/02/2012
02/02/2012
29/12/2011
22/12/2011
15/12/2011
08/12/2011
08/12/2011
01/12/2011
24/11/2011
17/11/2011
17/11/2011
03/11/2011
20/10/2011
13/10/2011
29/09/2011
15/09/2011
08/09/2011
11/08/2011
30/06/2011
23/06/2011
23/06/2011
6931
6869
6020
6851
6833
6802
6785
6757
6596
6019
6622
6593
6585
6581
6578
6553
6543
6529
6524
6505
6474
6445
6396
6383
6293
6137
6228
6243
TERMINAL
GOVERNMENTAL COMPLEX IN MAKKAH
SHAHANIYA WORKSHOP DEVELOPMENT
QATAR EMIRI NAVAL FORCES BASE BUILDINGS PACKAGE
DEVELOPMENT OF ISF CAMP AT DUHAIL - PRELIMINARY PHASE WORKS
CPC02
QATAR THEME/WATER PARK PROJECT-AL WAKRAH
DESIGN SERVICES FOR AL SHESHAA HOTEL
ANJUM HOTEL - BACK OF THE HOUSE
ARABELLA COMPLEX
HORIZONTAL AND VERTICAL INFRASTRUCTURES AT THE UN
REGIONAL SERVICE CENTER
NEW DOHA PORT PROJECT BUILDING PACKAGES
CONSULTANCY SERVICES FOR COLD STORAGE IN ERBIL
UPGRADE OF THE FIRE ALARM AND FIRE FIGHTING SYSTEM FOR ABU
ZAABAL FERTILIZERS AN
EXPANSION OF INDUSTRIAL AREA SEWAGE TREATMENT PLANT
WAREHOUSE FIRE PROTECTION UPGRADE
CONSULTANCY SERVICES FOR DOHA GRAND PARK HOTEL
SUMAYSIMAH COAST GUARD BASE - TENDERING FOR LAND DESIGN
SEVEN BUILDINGS IN LUSAIL AREA
STAGE II PHASE II OF EL GABAL EL ASFAR WASTE WATER
TREATMENT PLANT
HEALTH CLUB AT KHALIDIYA
RAMEDA PHARMACEUTICAL PLANT MODERNIZATION
NDIA CITY PROJECT-DESIGN OF FIVE BUILDINGS
3 VILLAS
LIFE SAFETY AND SECURITY UPGRADE FOR THE EXXONMOBIL
BUILDING,CAIRO
RIO RESORTS - HURGHADA
INMA OFFICE AND SHOPPING CENTER
GULSAN EGYPT PLANT
EPCC FOR NEW TREATMENT PLANT AND FACILITIES IN SUDAN
CONSULTANCY SERVICES FOR WHO BUILDING
12. 23/02/2015 04:06CV
Proposal From To M Month Total M Month % RoleProp No
17.24%
3.23%
9.52%
6.81%
7.04%
5.71%
12.00%
10.00%
50.00%
3.85%
9.61%
28.57%
17.56%
5.26%
11.02%
8.70%
6.35%
2.63%
11.11%
100.00%
21.05%
3.45%
2.38%
3.30%
1.43%
12.00%
9.00%
1.79%
11.25%
3.03%
15.38%
7.50%
4.45%
0.3
0.3
0.8
1.9
0.7
0.3
0.8
0.5
0.1
0.5
2.3
0.3
1.3
1.1
1.2
0.9
0.6
0.8
0.8
0.0
0.4
0.9
0.4
0.9
0.7
0.5
1.0
2.2
0.8
3.0
0.6
0.4
3.4
0.0
0.0
0.1
0.1
0.0
0.0
0.1
0.0
0.1
0.0
0.2
0.1
0.2
0.1
0.1
0.1
0.0
0.0
0.1
0.0
0.1
0.0
0.0
0.0
0.0
0.1
0.1
0.0
0.1
0.1
0.1
0.0
0.1
16/06/2011
19/05/2011
19/05/2011
28/04/2011
31/03/2011
17/03/2011
17/03/2011
17/03/2011
10/03/2011
17/03/2011
10/03/2011
24/02/2011
03/03/2011
20/01/2011
13/01/2011
30/12/2010
06/01/2011
15/07/2010
29/07/2010
08/07/2010
22/07/2010
01/07/2010
17/06/2010
17/06/2010
27/05/2010
13/05/2010
29/04/2010
15/04/2010
08/04/2010
25/03/2010
11/03/2010
01/04/2010
14/01/2010
16/06/2011
19/05/2011
12/05/2011
31/03/2011
24/03/2011
17/03/2011
17/03/2011
10/03/2011
10/03/2011
10/03/2011
03/03/2011
24/02/2011
17/02/2011
20/01/2011
13/01/2011
30/12/2010
23/12/2010
15/07/2010
15/07/2010
08/07/2010
08/07/2010
24/06/2010
17/06/2010
17/06/2010
27/05/2010
06/05/2010
15/04/2010
08/04/2010
01/04/2010
18/03/2010
11/03/2010
11/03/2010
07/01/2010
6225
6157
6134
6053
5788
6015
6024
6029
6012
6021
5980
5953
5965
5922
5909
5677
5843
5453
5526
5354
5488
5506
5494
5485
5451
5381
5336
5330
5320
5075
5232
5266
5102
COURT IN JEDDAH-KSA
KAFD - KING ABDULLA FINANCIAL DISTRICT
NEW PHARMA FACTORY
DOMIATEC OFFICE BUILDING MODIFICATION
RENOVATION PROJECT - UNFPA REGIONAL OFFICE CAIRO - PRE-
QUALIFICATION OF ARCHITEC
DESIGN MODIFICATION OF THE ONYX PROJECT
NAJAF RESIDENTIAL COMPLEX
NIKKI BEACH RESORT
HOUSING AND DORMS - SAUDI MINISTRY OF INTERIOR
KATTAMEYA PLAZA - LANDSCAPE PACKAGE
AL-MANAFIE COMPLEX TOWERS - MECCA
CFC ELECTROMECHANICAL SHOP DRAWINGS
SAUDI RAILWAY PROJECT - STATION AND MOSQUE WORKS
TEEGAN PROJECT PHASE 1
NDIA AIRPORT CITY - AOR
RESIDENTIAL AND COMMERCIAL TOWER IN JEDDAH
PROGLASS FACTORY AND ADMIN BUILDING
PS 16 SEWERAGE CATCHMENT
MINISTRY OF FINANCE REGIONAL TRAINING CENTER
PREQUALIFICATION FOR NASR GARDENS PROJECT
PROTOTYPE BUILDINGS - INTERIOR MINISTRY - KSA
UEICEO JUICE PLANT
ENERGY CITY QATAR (ECQ 11) - MENA OFFICE BUILDING
MCS LEAL AND CONTROL HEADQUARTER BUILDING PROJECT
MARDIVE OFFICE BUILDING
NEW GIZA - MGM HOTEL (DESIGN SERVICES)
BARWA CITY PHASE 1
RETAIL BUILDINGS -ZONE 1 - CITY GATE NEW CAIRO PROJECT
CITY GATE SUB-ZONES 2A, 3A, 8A AND 9A
HELIOPOLIS CLUB UNDERGROUND CAR PARK
NEW TELECOM BLDG, SECURITY BLDG AND ROADS
MSGC GYPSUM MANUFACTURING PLANT
AL RUWAIS REDEVELOPMENT, JEDDAH: DETAILED PLANNING &
13. 23/02/2015 04:06CV
Proposal From To M Month Total M Month % RoleProp No
TRAINING COURSES
YearCourse Location
Time Sheet orientation for new hires
Introduction to Fire Safety
Library Orientation for new hires
HPL PANELS
Fire Prevention and Protection
Decision Making & Problem Solving
English Language
Accounting for Non Accounting
Team Building Soft Skills Training Course
BAUTEC International Trade Fair for Building & Construction Technology
Elevator Calculations
Making Online Meetings Using Webex
Introducation to HVAC Systems_ARCH
2008
2008
2008
2008
2009
2009
2010
2010
2010
2014
2014
2014
2014
EG
EG
EG
EG
EG
ECG
EG
EG
EG
EG
EG
EG
EG
4.50%
11.11%
18.75%
11.93%
7.25%
8.82%
11.94%
5.57%
11.04%
16.94%
5.33%
18.52%
12.50%
2.9
0.3
0.5
5.0
0.7
0.3
0.7
4.8
1.5
1.2
1.7
1.1
0.3
0.1
0.0
0.1
0.6
0.1
0.0
0.1
0.3
0.2
0.2
0.1
0.2
0.0
17/12/2009
12/11/2009
10/09/2009
03/09/2009
02/07/2009
02/07/2009
11/06/2009
23/04/2009
23/04/2009
29/01/2009
15/01/2009
22/01/2009
08/01/2009
26/11/2009
05/11/2009
03/09/2009
30/07/2009
02/07/2009
02/07/2009
04/06/2009
16/04/2009
26/03/2009
22/01/2009
15/01/2009
08/01/2009
08/01/2009
5070
5059
4978
4953
4897
4891
4829
4744
4765
4672
4507
4640
4658
INFRASTRUCTURE DESIGN
TAKREER SEA WATER INTAKE -(SWI-III) - PROJECT
NEW OFFICE TOWER ADJACENT TO TALLAT MOSTAFA
HEADQUARTERS
SUNTERRA RETAIL AND RESORT
GASSI TOUIL (FEED) - GAS PLANT IN ALGERIA
ART WORKSHOP CENTRE - TAJURA
UPGRADING OF OCL STORES
OUTDOOR COOLING - CULTURE VILLAGE PROJECT
PORTO PHOENICE MARSA ALAM
EPIC OF HV NETWORK IN DUKHAN
ALYANBOH DETERGENT PLANT
6TH OF OCTOBER CITY CENTER MALL - ARCHITECT OF THE RECORD
LUXOR FOUR SEASONS HOTEL
RAJHI STEEL DEVELOPMENT