Meeting minutes

323 views
223 views

Published on

Published in: Business, Sports
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
323
On SlideShare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
6
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Meeting minutes

  1. 1. Meeting Minutes 1 Date 5 June 2013 Location Taylor’s Lakeside University, Library Member Present All Dateline 9 June 2013 Agenda Search possible site to build the building Research about what to build in the building. What is needed in Taylors Lakeside University? Discussion The site was nearby the basketball court which was 40m x 40m. The basement of the site is 40m and 30m on the ground. We discussed about doing franchise business such as McDonald, a bowling centre and many more Miss Norma decided that a building approval from ‘pusatpermainan/pusathiburan’ is needed to build the sports. Action Yap Yong Xing and Anthony Chew Kevin Lee Hee Xian and Tan Wen Hao
  2. 2. Meeting Minutes 2 Date 21 June 2013 Location Taylor’s Lakeside University, food court Member Present All Dateline 23 June 2013 Agenda Draw out the plan and elevation of the building Calculate the cost of the building Draw out the infrastructures and building structures for the quantity surveyor to calculate the building cost. Discussion We differentiated our respective works in the meeting. Anthony will be the architect. He will draw the building plan and elevations. After that, he will be researching about the authority and getting their As for Yap Yong Xing, he is the client and also the engineer. He will have to take care of the infrastructure and building structures. Tan Wen Hao will be the contractor. He will be the builder for the buildings, so he has to buy the materials for the building and use construction machines such as excavator, tractor loader and more. Other than that, he will hire workers to work for him. Lastly, Kevin Lee Hee Xian will be the quantity surveyor. He will calculate the cost of the building and report it to the client.
  3. 3. approvals. Action Anthony Chew Yap Yong Xing Tan Wen Hao Kevin Lee Hee Xian

×