Cpl Interiors Plc

889 views

Published on

CPL Interiors plc provide fit-out, refurbishment, new build and design services across the UK.

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
889
On SlideShare
0
From Embeds
0
Number of Embeds
3
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Cpl Interiors Plc

  1. 1. cpl interiors plc cpl interiors plc – company profile
  2. 2. cpl interiors plc We are a specialist company that offer superior property fit-out, design and refurbishment services for owners and occupiers throughout the UK. Our experienced, skilled, and knowledgeable staff work alongside Client professional teams in a considerate and innovative manner; strictly adhering to all Client performance, cost, and programme requirements. project: National Grid
  3. 3. cpl interiors plc company profile latest annual turnover: £21.5 million forecasted ’09 turnover: £22.5 million personnel employed: 65 office locations: west midlands : head office london : city centre constructionline client CPL Interiors score 9.26, feedback rating: national average 8 project: National Grid
  4. 4. cpl interiors plc company structure cpl interiors cpl elements cpl integra fit-out & refurbishment specialist a division of cpl interiors plc fit-out & refurbishment fit-out & refurbishment contractor - special projects specialist sectors: specialist to the motor trade commercial a division of cpl interiors plc government departments a division of cpl interiors plc public bodies education project values £50k to £500k health project values £50k to £3m law & order fire & rescue leisure project values £500k to £6m project: National Grid
  5. 5. cpl interiors plc nationwide coverage recent client projects NICE, London Bristol Primary Care Trust, Bristol Harper Collins, London ADT, Leicester Premier Foods, St Albans Bank of Cyprus, London Barberry Properties, Birmingham Liverpool City Council, Liverpool Unum Provident, London National Grid, Solihull West Midlands Fire Service, Birmingham Deutsche Bank, Birmingham PricewaterhouseCoopers, Hull CSCI, Nottingham Legal & General, Sheffield Hortons’ Estates, Coventry Audi, Brighton NEC Group, Birmingham Victoria & Albert Museum, London Learning & Skills Council, Leicester Loughborough University, Loughborough project: Learning & Skills Council
  6. 6. cpl interiors plc project commitments certainty of quality consistent attention to detail achieving exceptional finishes on time completion to programme to budget providing best value total commitment to health, safety and the environment Project: West Midlands Fire Service
  7. 7. cpl interiors plc commitment to quality dedicated Quality Team directly employed Site Managers, Joiners & Carpenters regular quality inspections & snag free culture post contract survey completed for each project project: Novo Nordisk
  8. 8. cpl interiors plc key differentiators people high levels of commitment genuinely care about the success of your project large proportion of highly skilled directly employed labour understanding of client and project priorities drawing upon proven depth of experience to enable: effective value engineering, cost certainty, and certainty of quality & delivery company structure lean management structure hands-on management team open and trusting approach project: West Point
  9. 9. location duration value solihull 20 weeks £2,400,000 National Grid Full fit-out of National Grid’s existing offices in Solihull. This extensive project incorporated a mix of environments including office areas, conference and meeting rooms, café, gymnasium and wash room facilities.
  10. 10. location duration value leeds 8 weeks £235,000 PricewaterhouseCoopers The full strip-out and fit-out of the occupied second floor of an existing four storey building. Works also included additional minor alterations to the remaining floors. The project was sequenced to ensure that offices remained fully operational throughout the duration of the works.
  11. 11. location duration value west bromwich 20 weeks £1,100,000 Sandwell Mental Health NHS and Social Care Trust A fast-track CAT A and CAT B fit-out of two floors to provide counselling rooms, treatment rooms, administrative areas, kitchens and WC’s. Works included full mechanical and electrical, new walls and partitioning, ceilings, floor finishes, decorations, fixtures and furnishings.
  12. 12. location duration value london 10 weeks £220,000 National Institute for Health & Clinical Excellence A two phased design and refurbishment of existing offices. The first phase, comprising of refurbishment to the reception area and formation of new meeting rooms, was undertaken with out of hours working to ensure the facilities remained fully functional. The second phase, completed during weekend only hours, revived the boardroom and meeting areas.
  13. 13. location duration value Birmingham 20 weeks £3,000,000 West Midlands Fire Service The full fit-out of the new headquarters building for the West Midlands Fire Service to provide a Fire Control Centre with specialist IT installations, stores, EMS, three comms/hub rooms, fitting bays and Safeside areas. CPL Interiors undertook the design of the M&E and the 19 true-to-life scenarios for the creation of the Safeside areas which will be used for educational purposes.
  14. 14. location duration value birmingham 14 weeks £1,100,000 Deutsche Bank The fast track design and build CAT B fit out of four floors for a new overseas investments administrative headquarters. The works to all floors involved the creation of Central Equipment Rooms and Satellite Equipment Rooms for IT systems and the construction of a room in the basement to house a new UPS. The standby generator, UPS and A & B supplies were designed to ensure business continuity.
  15. 15. location duration value bristol 25 weeks £1,400,000 University of Bristol CPL Interiors plc worked closely with the University of Bristol and design team to complete the full refurbishment of an existing library within the Medical Sciences Building. The new library incorporates innovative design concepts to create a 21st century Learning Zone providing IT facilities, group study areas, training suites and café.
  16. 16. location duration value london 20 weeks £1,000,000 120 Moorgate, Redevco UK Ltd The project consisted of the phased Cat A fit-out of 6 floors enabling the Client to remain operational. Works included strip-out to shell and full Cat A fit out to client’s specification, embracing M&E lifts and basement area.
  17. 17. location duration value hull 8 weeks £400,000 PricewaterhouseCoopers The fit-out of two floors of a new four storey building including works to offices areas, meeting rooms, reception and kitchen / vending area.
  18. 18. cpl interiors plc project commitments certainty of quality consistent attention to detail achieving exceptional finishes on time completion to programme to budget providing best value total commitment to health, safety and the environment project: University of Brisol

×