Asbestos Removal London Case Study – Financial

  • 527 views
Uploaded on

Deconstruct UK Limited has launched a series of Slideshare Presentations to demonstrate their asbestos removal capabilities in the London and surrounding areas.

Deconstruct UK Limited has launched a series of Slideshare Presentations to demonstrate their asbestos removal capabilities in the London and surrounding areas.

More in: Business
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
527
On Slideshare
0
From Embeds
0
Number of Embeds
2

Actions

Shares
Downloads
1
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. Deconstruct UK Limited Deconstruct is a specialist provider of site enablement services, using the latest innovation and processes to transform and prepare sites for development. With a commitment to delivering excellence we offer an unparalleled level of service. Financial Case StudyRemoval of asbestos insulation board cladding to beams within ceiling void at a High Street bank in Brighton. Client: Environtec Ltd Location: High Street Bank, Brighton Contractor: Deconstruct UK Ltd Completion Date: December 2011 Sector: Financial ZERO HARM THROUGH ZERO TOLERANCE
  • 2. About the Project:During a recent Asbestos Management Survey, asbestos insulation board cladding wasidentified to the structural beams within the first floor office area.Deconstruct were selected by the client’s consultant to remove the asbestos whilst thisbusy branch remained operational.Under fully controlled conditions, it was first necessary to remove the underlyingmineral fibre ceilings and insulation.Removal of the asbestos insulation board was then completed before the area wassubjected to rigorous clearance testing by the client’s consultant. ZERO HARM THROUGH ZERO TOLERANCE
  • 3. Project Challenges:The branch is located on a busy town centre street and access was very limited. It wasimperative that the branch remained fully operational and that trading was not affectedby our works. The asbestos removal operation was therefore completed over a series ofnights.Access had to be maintained to staff welfare areas during the course of the works.Services within the working area remained live and our operatives had to be extremelycareful when working around and cleaning these.Space at the branch was very limited and it was necessary to utilise a modulardecontamination unit as opposed to a traditional mobile unit. ZERO HARM THROUGH ZERO TOLERANCE
  • 4. List of Services: Services provided by Deconstruct UK Ltd: Deconstruction Services Demolition Services Enabling Works Asbestos Removal Services ✓ Asbestos Surveying Services Ground Works Services Piling Services Steelwork Installations Builders Works Emergency Dangerous Structures Temporary Works “All of the services above are provided by Deconstruct UK Limited.” ZERO HARM THROUGH ZERO TOLERANCE