Value Stream Transformation:
Achieving Excellence through Leadership Alignment
and Holistic Design

CONNECT
January 8, 2014
Why Value Stream Mapping?
Why Now?

© 2014 The Karen Martin Group, Inc.

To order from Amazon: www.bitly.com/VSMbk
For more information: www.ksmartin.com/VSM

2
Value Stream Mapping’s Roots
•
•
•
•
•

Value
Value Stream
Flow
Pull
Perfection
1996

© 2014 The Karen Martin Group, Inc.

3
Value Stream Defined
Value Stream: All of the activities required to
transform a customer request into a good or service.

Process

Customer
Request

Process

Process

Customer
Receipt
First defined in The Machine That Changed the World,
James Womack, Daniel Jones, & Daniel Roos, 1990.

© 2014 The Karen Martin Group, Inc.

4
Silo-Centric vs. Value Stream Thinking
Function

Function

Function

Function

Support Value Stream
Value stream
segment

Core Value Stream

Value stream
segment

Support Value Stream

© 2014 The Karen Martin Group, Inc.

5
Value Stream Mapping’s Roots

Mike Rother & John Shook
1999

Beau Keyte & Drew Locher
2004

Whenever there is a product for a customer,
there is a value stream.
The challenge lies in seeing it.
© 2014 The Karen Martin Group, Inc.

— Mike Rother & John Shook, Learning to See

6
Value Stream Mapping: Common Failings
•
•
•
•
•
•
•

Using the mapping process solely as a work design exercise
Using the map to make tactical improvements
Creating maps but taking no action
Mapping with an inappropriate team—or no team at all
Creating value stream maps during a kaizen event
Creating maps with no metrics
Mapping without a team charter or not socializing it

© 2014 The Karen Martin Group, Inc.

7
Value Stream Thinking: Strategy Before Tactics
Where am I?
Where do I want
to go?
Which route
should I take?
I-80 option

© 2014 The Karen Martin Group, Inc.

?

?
?
I-40 option

I-70 option

8
Value Stream Mapping Benefit:
Reaching Leadership Consensus

© 2014 The Karen Martin Group, Inc.

9
Value Stream Mapping enables a
mapping team to get ABOVE the work
© 2014 The Karen Martin Group, Inc.

10
VSM Promotes Systems Thinking

Individual Efficiency = Sub-optimization

System Efficiency = Optimal Value Stream Performance
© 2014 The Karen Martin Group, Inc.

11
Work: Degrees of Granularity
Macro
Perspective
•

•
•

Value
Stream

Define strategic
direction (“what”)
Heavy leadership
involvement
Value Stream
Mapping

Process

Process

Micro
Perspective

Process
•

•

Step

© 2014 The Karen Martin Group, Inc.

Step

Step

•

Identify the
tactical “how”
Heavy frontline
involvement
Metrics-Based
Process Mapping

12
Work: Degrees of Granularity
Order Fulfillment Value Stream
Order
Fulfillment

Strategic
Value-stream
Perspective
Quote

Tactical
Process-level
Perspective

© 2014 The Karen Martin Group, Inc.

Design

Produce

Fabricate

Assemble

Ship

13
Value Stream Mapping:
Visualize your Entire Operation on a Single Sheet of Paper

© 2014 The Karen Martin Group, Inc.

14
Basic Value Stream Map:
3 Sections
ABC Technology, Inc.
Current State Value Stream Map
Name of Value Stream Being Mapped
Demand Rate = XX / Year
Name of Value Stream Champion
Mapping Date

1

Customer

1
Information
Flow

IT-1

IT-2

3

2

4

5

6

Process 1

Work
Flow
1 items

Process 3

Process 4

Process 5

Function A

2

Process 2

Function B

Function C

Function D

Function E

5

11

Timeline

LT = 0.5 days
PT = 5 mins.
%C&A = 75%

480 mins.

240 mins.

10 mins.

3

LT = 1 days
PT = 10 mins.
%C&A = 50%

5 mins.

45 items

3
LT = 5 days
PT = 120 mins.
%C&A = 85%

10 items

7

4

LT = 2 days
PT = 30 mins.
%C&A = 99%

LT = 1 days
PT = 15 mins.
%C&A = 95%

5 days

2 days

480 mins.

120 mins.

30 mins.

15 mins.

Total LT = 9.5 days
Total PT = 180 mins.
Activ ity Ratio = 3.9%
Rolled %C&A = 30.0%

© 2014 The Karen Martin Group, Inc.

15
Basic Value Stream Map:
Future State
ABC Technology, Inc.
Future State Value Stream Map
Name of Value Stream Being Mapped
Demand Rate = XX / Year
Name of Value Stream Champion
Mapping Date

1

Customer

IT interface
Standard
work

Error
proof

IT-1

Crosstrain

Modified
approvals
2

Process 1

3

Crosstrain

Process 2

Function A
1 items

IT-2

5

Process 3

Function C
5 items

LT = 1 days
PT = 10 mins.
%C&A = 99%

4

Standard
work

Function E
10 items

3
LT = 2 days
PT = 120 mins.
%C&A = 95%

4
LT = 0.5 days
PT = 30 mins.
%C&A = 95%

1 days

© 2014 The Karen Martin Group, Inc.

2 days

0.5 days

Total LT = 3.5 days

10 mins.

120 mins.

30 mins.

Total PT = 160 mins.
Activity Ratio = 9.5%
Rolled %C&A = 89.3%

16
Basic Value Stream
Future State Performance Metrics
Current State

Projected
Future State

Projected
% Improvement

9.5 days

3.5 days

63.2%

180 minutes

160 minutes

11.1%

Activity Ratio

3.9%

9.5%

143.6%

Rolled % Complete &
Accurate

30.0%

89.3%

197.7%

Metric
Total Lead Time
Total Process Time

User defined
User defined
© 2014 The Karen Martin Group, Inc.

17
Value Stream
Mapping
Executing
Transformation
Plan

© 2014 The Karen Martin Group, Inc.

Making
Specific
Improvements

18
Value Stream Mapping Activity
Phases and Timing
Repeat
Prepare

4 Weeks Prior
to Mapping

© 2014 The Karen Martin Group, Inc.

Understand
Current State

Design
Future State

Develop
Transformation
Plan

Three Consecutive Days

Execute
Transformation
Plan

Following
Mapping

19
Charter: Critical planning, communication, and consensus-building tool
Value Stream Mapping Charter
Scope

Accountable Parties

Logistics

Executive
Allen Ward
Sponsor

Value Stream Capital equipment
Specific Engineer to order, requires both hardware &
Conditions software customization

Event Dates July 24-26, 2013
& Times 8:00 am - 5:00 pm

Value Stream
Nancy Little
Champion

Demand Rate 1,000 per year

Base-camp
Surf's Up - Room A
Location

Facilitator Dave Parks

Trigger Customer submits RFQ
First Step Sales reviews the RFQ

Logistics
Dave Parks
Coordinator

Last Step Production ships product
Boundaries & No new software; only minor changes to existing IT
Limitations systems; no additional staff; no budget changes

Briefing
Attendees
** required
*optional

Improvement Time Future state design is fully realized by
Frame December 31, 2013.

Meals
Continential breakfast & lunch
Provided

** Allen W (COO), Joe M (CIO),
Sal T (VP Sales)
* Bruce R (VP Ops), Carlos P
(HR), Su T (CFO), Bill M (VP CS)

Current State Problems & Business Needs

Briefing
July 24, 25, & 26
Dates &
4:00-5:00 pm
Times

Mapping Team

1 Desire to stay ahead of the competition & deepen customer loyalty.

Function / Title

Name

2 Forecasted growth of 15% for next fiscal year.

1 Sales, Director

3 Unclear & incorrect information flowing through value stream.

2 IT, Director

Diana Marie

4 Lead time for RFQ turnaround = 2 weeks; PO to software dev = 5 weeks

3 Finance, Controller

Dave Gerald

5 (Competition's RFQ LT is 1 wk and PO to delivery is 4 wks)

4 Scrum Master

Ryan Austin

5 Engineering, Vice President

Nancy Little

1 Reduce RFQ lead time by a minimum of 50%.

6 Manufacturing, Director

Ambreen Motiwala

2 Reduce PO to software development lead time by a minimum of 50%.

7 Customer Service, Manager

Danny Tran

3 Improve quality of information flowing throughout value stream.

8 Customer (contract manufacturer)

JR Hunt

4

Contact Information

Sean Michaels

9

Goals & Measurable Target Conditions

5

10

Benefits to Customers & Business

On-Call Support

1 Faster delivery; less hassle; less cost.

Function

Name

2 Better working relationships between sales, estimating & engineering.
3 Freed capacity to absorb additional business w/o increasing staff.

2 Production Supervisor

4

Contact Information

1 Planning / Purchasing, Planner Lourdes Dwyer
3

5

Tom St. James

4

Relevant Data

Agreement

1 Sales effectiveness: RFQ conversion rate.

Executive Sponsor

Value Stream Champion

Facilitator

2 Financial: Estimate-to-actual cost comparison.
3 Operational: LT in segments (RFQ to quote; PO to development).

Signature:

Signature:

Signature:

4

Date:

Date:

Date:

© 2014 The Karen Martin Group, Inc.

20
Charter: Critical planning, communication, and consensus-building tool
Value Stream Mapping Charter
Scope

Accountable Parties

Logistics

Executive
Allen Ward
Sponsor

Value Stream Capital equipment
Specific Engineer to order, requires both hardware &
Conditions software customization

Event Dates July 24-26, 2013
& Times 8:00 am - 5:00 pm

Value Stream
Nancy Little
Champion

Demand Rate 1,000 per year

Base-camp
Surf's Up - Room A
Location

Facilitator Dave Parks

Trigger Customer submits RFQ
First Step Sales reviews the RFQ

Logistics
Dave Parks
Coordinator

Last Step Production ships product
Boundaries & No new software; only minor changes to existing IT
Limitations systems; no additional staff; no budget changes

Briefing
Attendees
** required
*optional

Improvement Time Future state design is fully realized by
Frame December 31, 2013.

Meals
Continential breakfast & lunch
Provided

** Allen W (COO), Joe M (CIO),
Sal T (VP Sales)
* Bruce R (VP Ops), Carlos P
(HR), Su T (CFO), Bill M (VP CS)

Current State Problems & Business Needs

Briefing
July 24, 25, & 26
Dates &
4:00-5:00 pm
Times

Mapping Team

1 Desire to stay ahead of the competition & deepen customer loyalty.

Function / Title

Name

2 Forecasted growth of 15% for next fiscal year.

1 Sales, Director

3 Unclear & incorrect information flowing through value stream.

2 IT, Director

Diana Marie

4 Lead time for RFQ turnaround = 2 weeks; PO to software dev = 5 weeks

3 Finance, Controller

Dave Gerald

5 (Competition's RFQ LT is 1 wk and PO to delivery is 4 wks)

4 Scrum Master

Ryan Austin

5 Engineering, Vice President

Nancy Little

1 Reduce RFQ lead time by a minimum of 50%.

6 Manufacturing, Director

Ambreen Motiwala

2 Reduce PO to software development lead time by a minimum of 50%.

7 Customer Service, Manager

Danny Tran

3 Improve quality of information flowing throughout value stream.

8 Customer (contract manufacturer)

JR Hunt

4

Contact Information

Sean Michaels

9

Goals & Measurable Target Conditions

5

10

Benefits to Customers & Business

On-Call Support

1 Faster delivery; less hassle; less cost.

Function

Name

2 Better working relationships between sales, estimating & engineering.
3 Freed capacity to absorb additional business w/o increasing staff.

2 Production Supervisor

4

Contact Information

1 Planning / Purchasing, Planner Lourdes Dwyer
3

5

Tom St. James

4

Relevant Data

Agreement

1 Sales effectiveness: RFQ conversion rate.

Executive Sponsor

Value Stream Champion

Facilitator

2 Financial: Estimate-to-actual cost comparison.
3 Operational: LT in segments (RFQ to quote; PO to development).

Signature:

Signature:

Signature:

4

Date:

Date:

Date:

© 2014 The Karen Martin Group, Inc.

21
Charter: Critical planning, communication, and consensus-building tool
Value Stream Mapping Charter
Scope

Accountable Parties

Logistics

Executive
Allen Ward
Sponsor

Value Stream Capital equipment
Specific Engineer to order, requires both hardware &
Conditions software customization

Event Dates July 24-26, 2013
& Times 8:00 am - 5:00 pm

Value Stream
Nancy Little
Champion

Demand Rate 1,000 per year

Base-camp
Surf's Up - Room A
Location

Facilitator Dave Parks

Trigger Customer submits RFQ
First Step Sales reviews the RFQ

Logistics
Dave Parks
Coordinator

Last Step Production ships product
Boundaries & No new software; only minor changes to existing IT
Limitations systems; no additional staff; no budget changes

Briefing
Attendees
** required
*optional

Improvement Time Future state design is fully realized by
Frame December 31, 2013.

Meals
Continential breakfast & lunch
Provided

** Allen W (COO), Joe M (CIO),
Sal T (VP Sales)
* Bruce R (VP Ops), Carlos P
(HR), Su T (CFO), Bill M (VP CS)

Current State Problems & Business Needs

Briefing
July 24, 25, & 26
Dates &
4:00-5:00 pm
Times

Mapping Team

1 Desire to stay ahead of the competition & deepen customer loyalty.

Function / Title

Name

2 Forecasted growth of 15% for next fiscal year.

1 Sales, Director

3 Unclear & incorrect information flowing through value stream.

2 IT, Director

Diana Marie

4 Lead time for RFQ turnaround = 2 weeks; PO to software dev = 5 weeks

3 Finance, Controller

Dave Gerald

5 (Competition's RFQ LT is 1 wk and PO to delivery is 4 wks)

4 Scrum Master

Ryan Austin

5 Engineering, Vice President

Nancy Little

1 Reduce RFQ lead time by a minimum of 50%.

6 Manufacturing, Director

Ambreen Motiwala

2 Reduce PO to software development lead time by a minimum of 50%.

7 Customer Service, Manager

Danny Tran

3 Improve quality of information flowing throughout value stream.

8 Customer (contract manufacturer)

JR Hunt

4

Contact Information

Sean Michaels

9

Goals & Measurable Target Conditions

5

10

Benefits to Customers & Business

On-Call Support

1 Faster delivery; less hassle; less cost.

Function

Name

2 Better working relationships between sales, estimating & engineering.
3 Freed capacity to absorb additional business w/o increasing staff.

2 Production Supervisor

4

Contact Information

1 Planning / Purchasing, Planner Lourdes Dwyer
3

5

Tom St. James

4

Relevant Data

Agreement

1 Sales effectiveness: RFQ conversion rate.

Executive Sponsor

Value Stream Champion

Facilitator

2 Financial: Estimate-to-actual cost comparison.
3 Operational: LT in segments (RFQ to quote; PO to development).

Signature:

Signature:

Signature:

4

Date:

Date:

Date:

© 2014 The Karen Martin Group, Inc.

22
Charter: Critical planning, communication, and consensus-building tool
Value Stream Mapping Charter
Scope

Accountable Parties

Logistics

Executive
Allen Ward
Sponsor

Value Stream Capital equipment
Specific Engineer to order, requires both hardware &
Conditions software customization

Event Dates July 24-26, 2013
& Times 8:00 am - 5:00 pm

Value Stream
Nancy Little
Champion

Demand Rate 1,000 per year

Base-camp
Surf's Up - Room A
Location

Facilitator Dave Parks

Trigger Customer submits RFQ
First Step Sales reviews the RFQ

Logistics
Dave Parks
Coordinator

Last Step Production ships product
Boundaries & No new software; only minor changes to existing IT
Limitations systems; no additional staff; no budget changes

Briefing
Attendees
** required
*optional

Improvement Time Future state design is fully realized by
Frame December 31, 2013.

Meals
Continential breakfast & lunch
Provided

** Allen W (COO), Joe M (CIO),
Sal T (VP Sales)
* Bruce R (VP Ops), Carlos P
(HR), Su T (CFO), Bill M (VP CS)

Current State Problems & Business Needs

Briefing
July 24, 25, & 26
Dates &
4:00-5:00 pm
Times

Mapping Team

1 Desire to stay ahead of the competition & deepen customer loyalty.

Function / Title

Name

2 Forecasted growth of 15% for next fiscal year.

1 Sales, Director

3 Unclear & incorrect information flowing through value stream.

2 IT, Director

Diana Marie

4 Lead time for RFQ turnaround = 2 weeks; PO to software dev = 5 weeks

3 Finance, Controller

Dave Gerald

5 (Competition's RFQ LT is 1 wk and PO to delivery is 4 wks)

4 Scrum Master

Ryan Austin

5 Engineering, Vice President

Nancy Little

1 Reduce RFQ lead time by a minimum of 50%.

6 Manufacturing, Director

Ambreen Motiwala

2 Reduce PO to software development lead time by a minimum of 50%.

7 Customer Service, Manager

Danny Tran

3 Improve quality of information flowing throughout value stream.

8 Customer (contract manufacturer)

JR Hunt

4

Contact Information

Sean Michaels

9

Goals & Measurable Target Conditions

5

10

Benefits to Customers & Business

On-Call Support

1 Faster delivery; less hassle; less cost.

Function

Name

2 Better working relationships between sales, estimating & engineering.
3 Freed capacity to absorb additional business w/o increasing staff.

2 Production Supervisor

4

Contact Information

1 Planning / Purchasing, Planner Lourdes Dwyer
3

5

Tom St. James

4

Relevant Data

Agreement

1 Sales effectiveness: RFQ conversion rate.

Executive Sponsor

Value Stream Champion

Facilitator

2 Financial: Estimate-to-actual cost comparison.
3 Operational: LT in segments (RFQ to quote; PO to development).

Signature:

Signature:

Signature:

4

Date:

Date:

Date:

© 2014 The Karen Martin Group, Inc.

23
Value Stream Scoping Diagram
Defining Specific Conditions
Catalog

Configure
to order

Custom
hardware

Engineer
to order

Custom
software

New Product
Development

Both

Capital
Equipment

Golden State
Equipment, Inc.

Catalog
Spares &
subassemblies
Engineer to
order
© 2014 The Karen Martin Group, Inc.

24
Where should the “fenceposts” be?
Function

Activity

Marketing
Sales

Calls on and qualifies customers

Customer

Submits RFQ to sales

Sales

Reviews RFQ

Estimating

Generates quote

Sales

Approve quote

Customer

Accepts quote; submits a PO

Sales

Approves PO

Customer service

Creates SO; compiles spec package

EE/ME design

Designs product; generates BOM

Customer

Approves design

EE/ME design

Forwards design to SW dev

Software Dev

Writes code

Purchasing/Planning

Releases WO; schedules production

Supplier (external)

Delivers materials

Production

Manufactures & ships product

Customer

Installs equipment

Field service
© 2014 The Karen Martin Group, Inc.

Generates sales leads

Conducts 90-day follow-up
25
Who should be on the team, serve on-call,
and attend daily briefings?

© 2014 The Karen Martin Group, Inc.

26
Charter: Critical planning, communication, and consensus-building tool
Value Stream Mapping Charter
Scope

Accountable Parties

Logistics

Executive
Allen Ward
Sponsor

Value Stream Capital equipment
Specific Engineer to order, requires both hardware &
Conditions software customization

Event Dates July 24-26, 2013
& Times 8:00 am - 5:00 pm

Value Stream
Nancy Little
Champion

Demand Rate 1,000 per year

Base-camp
Surf's Up - Room A
Location

Facilitator Dave Parks

Trigger Customer submits RFQ
First Step Sales reviews the RFQ

Logistics
Dave Parks
Coordinator

Last Step Production ships product
Boundaries & No new software; only minor changes to existing IT
Limitations systems; no additional staff; no budget changes

Briefing
Attendees
** required
*optional

Improvement Time Future state design is fully realized by
Frame December 31, 2013.

Meals
Continential breakfast & lunch
Provided

** Allen W (COO), Joe M (CIO),
Sal T (VP Sales)
* Bruce R (VP Ops), Carlos P
(HR), Su T (CFO), Bill M (VP CS)

Current State Problems & Business Needs

Briefing
July 24, 25, & 26
Dates &
4:00-5:00 pm
Times

Mapping Team

1 Desire to stay ahead of the competition & deepen customer loyalty.

Function / Title

Name

2 Forecasted growth of 15% for next fiscal year.

1 Sales, Director

3 Unclear & incorrect information flowing through value stream.

2 IT, Director

Diana Marie

4 Lead time for RFQ turnaround = 2 weeks; PO to software dev = 5 weeks

3 Finance, Controller

Dave Gerald

5 (Competition's RFQ LT is 1 wk and PO to delivery is 4 wks)

4 Scrum Master

Ryan Austin

5 Engineering, Vice President

Nancy Little

1 Reduce RFQ lead time by a minimum of 50%.

6 Manufacturing, Director

Ambreen Motiwala

2 Reduce PO to software development lead time by a minimum of 50%.

7 Customer Service, Manager

Danny Tran

3 Improve quality of information flowing throughout value stream.

8 Customer (contract manufacturer)

JR Hunt

4

Contact Information

Sean Michaels

9

Goals & Measurable Target Conditions

5

10

Benefits to Customers & Business

On-Call Support

1 Faster delivery; less hassle; less cost.

Function

Name

2 Better working relationships between sales, estimating & engineering.
3 Freed capacity to absorb additional business w/o increasing staff.

2 Production Supervisor

4

Contact Information

1 Planning / Purchasing, Planner Lourdes Dwyer
3

5

Tom St. James

4

Relevant Data

Agreement

1 Sales effectiveness: RFQ conversion rate.

Executive Sponsor

Value Stream Champion

Facilitator

2 Financial: Estimate-to-actual cost comparison.
3 Operational: LT in segments (RFQ to quote; PO to development).

Signature:

Signature:

Signature:

4

Date:

Date:

Date:

© 2014 The Karen Martin Group, Inc.

27
Create the Current State Map
Prepare

1.
2.
3.
4.
5.

Understand
Current State

Design
Future State

Develop
Transformation
Plan

Execute
Transformation
Plan

Value stream walk #1
Layout the map
Value stream walk #2
Add map details
Add timeline; calculate
summary metrics
28
Effective Way to Visualize Relationships between
IT Systems and the Operation

© 2014 The Karen Martin Group, Inc.

29
Create the Future State Map
Prepare

Understand
Current State

Design
Future State

Develop
Transformation
Plan

Execute
Transformation
Plan

1. Define the “right work”
2. Make the right work flow
3. Manage the right work

30
How will you realize the future state?
Prepare

Understand
Current State

Develop
Transformation
Plan

Design
Future State

Execute
Transformation
Plan

Value Stream Transformation Plan
Value Stream
Executive Sponsor
Value Stream Champion
Value Stream Mapping Facilitator
Date Created
FS VSM
Block #
2

Measurable Target

Scheduled Review Dates

Outpatient Imaging
Allen Ward

1-Nov-12

Paul Scanner

21-Nov-12

Dave Parks

13-Dec-12

10/18/2012

10-Jan-13

Proposed Countermeasure

Exec.
Method*

Owner

Planned Timeline for Execution
1

2

3

4

5

6

7

8

9

10 11 12

Status

Improve quality of referral to 85%

Implement standard work for referral
process

KE

Sean
Michaels

100%

Reduce lead time between scheduling
and preregistration step to 45 minutes

Cross-train and co-locate work teams

Proj

Dianne
Marie

75%

4

Only one check in per patient

Collect copays in Imaging

KE

Ryan
Austin

50%

4

Reduce wait time in waiting area by 50% Balance work / level demand

KE

Dianne
Marie

50%

6

Eliminate 6 hour lead time associated
with transcription step

Implement voice recognition technology

Proj

Dave
Gerald

50%

7

Eliminate redundant data entry

Auto populate between PACS and
Meditech

Proj

Dave
Gerald

25%

5

Visually managed inventory; no outages
or expired items

5S CT supplies area; implement kanban

KE

Michael
O'Shea

100%

6

Reduce imaging LT to one hour

Value-stream specific radiologists

Proj

Martha
Allen

25%

8

Reduce report delivery LT to 30 minutes

Increase % of physicians receiving
electronic delivery

Proj

Martha
Allen

0%

7

Reduce LT at image review to 1 day

Visual metrics and indicators

JDI

Dave
Gerald

100%

3,4

Agreement
Executive Sponsor

Value Stream Champion

Value Stream Mapping Facilitator

Signature:

Signature:

Signature:

Date:

Date:

Date:

* Execution Method = JDI (Just-do-it), KE (Kaizen Event), or Proj (Project)

31
Where the rubber meets the road…
Prepare

Understand
Current State

Design
Future State

Develop
Transformation
Plan

Execute
Transformation
Plan

• Accountability rests with executive sponsor
• Monthly status meetings
• Adjust plan as new discoveries are made

32
And then repeat…

33
Current State Value Stream Map
Outpatient Imaging Services
Pre-register
Patient

Customer Demand:
15 patients perDay
(Takt Time 1920seconds)
8 hours per day

Schedule
Appointment

Referring
Physician

Hospital

4

3

5

Lead Time = 24 days

2

6

Lead Time = 990 mins.

Cycle Time = 30 mins.
Lead Time = 990 mins.
% C&A = 100 %

Demand = 15 per day

1

Lead Time = 12 mins.

Cycle Time = 11 mins.
Lead Time = 12 mins.
% C&A = 98 %

% C&A = 65 %

CT=Cycle Time
LT=Lead Time
%C&A=% Complete & Accurate

Symposium

E Pay

Excel

ADS

Internet

Meditech

Fax Order
Solutions

Waiting Room
Management
System

PACS

Auto Fax 50%
Us Mail 25%
MD Mailbox 25%
Rework Loop
via Fax 25% of
the time

Check-in
Patient
(Admitting)

Prep
Patient
(Tech)

Check-in
Patient
(Imaging)

Complete
Exam
(Tech)

Transmit
Images
(Tech)

Read/Dictate
Exam
(Radiologist)

Transcribe
Report
(MDI)

Review
Draft/Sign
(Radiologist)

Print
Reports
(Imaging)

Send
Reports
(Imaging)

5 mins.
5

5

5 mins.

Cycle Time = 2 mins.
% C&A = 90 %
0.0833 hrs.

3

0.0833 hrs.
2 mins.

6

Cycle Time = 1 mins.
% C&A = 98 %

45 mins.

2

0.75 hrs.
1 mins.

7

30 mins.

Cycle Time = 10 mins.
% C&A = 100 %

2

0.5 hrs.
10 mins.

8

5 mins.

Cycle Time = 15 mins.
% C&A = 90 %

2

0.0833 hrs.
15 mins.

9

248 mins.

Cycle Time = 3 mins.
% C&A = 100 %

2

10

4.13 hrs.
3 mins.

365 mins.

Cycle Time = 15 mins.
% C&A = 95 %

6

11

6.08 hrs.
15 mins.

960 mins.

Cycle Time = 5 mins.
% C&A = 75 %

2

12

16 hrs.
5 mins.

110 mins.

Cycle Time = 1 mins.
% C&A = 95 %

2

1.83 hrs.
1 mins.

13

120 mins.

Cycle Time = 1 mins.
% C&A = 99 %

6

2 hrs.
1 mins.

14

Cycle Time = 3 mins.
% C&A = 90 %

LT = 32.5 hrs.
3 mins.

CT = 56 mins.
CT/LT Ratio = 2.87%
Rolled First Pass
yield = 29%
Future State Value Stream Map
Outpatient Imaging Services
Standard
Work

Work
Balance

Customer Demand:
15 patients perDay
(Takt Time1920 seconds)
8 hours per day

Co-locate
Schedule appt
Pre-register

Referring
Physician

Hospital

3
Lead Time = 15 days

2

6

Demand = 15 per day

1

Lead Time = 45 mins.

Cycle Time = 11 mins.
Lead Time = 45 mins.
% C&A = 98 %

% C&A = 85 %

Risk
Reduction
(Joint
Commision)

Symposium

E Pay

Excel

Internet

Waiting Room
Management
System

Work
Balancing

Standard
Work

3

35 mins.

4

Cycle Time = 1 mins.
% C&A = 98 %
0.0833 hrs.

2

Complete
Exam
(Tech)

5

20 mins.

Cycle Time = 10 mins.
% C&A = 100 %

0.583 hrs.
1 mins.

2

Transmit
Images
(Tech)

6

5 mins.

Cycle Time = 10 mins.
% C&A = 90 %

0.333 hrs.
10 mins.

Visual
Workplace

Set-up
Reduction

Prep
Patient
(Tech)

Check-in
Patient
(Imaging)

Fax Order
Solutions

PACS

Auto Fax 80%
Us Mail 15%
MD Mailbox 5%
5S

Value Stream
Alignment

Pull System
(Supplies
Kanban)

Remove
Check in
and Reduce
System Access

5 mins.

Meditech

CT=Cycle Time
LT=Lead Time
%C&A=% Complete & Accurate

2

7

120 mins.

2

Review
Draft/Sign
(Radiologist)
420 mins.

Cycle Time = 15 mins.
% C&A = 95 %

2 hrs.
2 mins.

8

Batch
Reductions

Voice
Recognition

Read/Dictate
Exam
(Radiologist)

Cycle Time = 2 mins.
% C&A = 100 %

0.0833 hrs.
10 mins.

Continuous
Flow

2

Print
Reports
(Imaging)

9

2 mins.

Cycle Time = 1 mins.
% C&A = 95 %

7 hrs.
15 mins.

Rework Loop
via Fax 10% of
the time

2

30 mins.

Cycle Time = 1 mins.
% C&A = 99 %

0.0333 hrs.
1 mins.

10

Send
Reports
(Imaging)

6

0.5 hrs.
1 mins.

11

Cycle Time = 3 mins.
% C&A = 90 %

LT = 11.3 hrs.
3 mins.

CT = 43 mins.
CT/LT Ratio = 6.32%
Rolled First Pass
yield = 40%
Outpatient Imaging
Value Stream Improvement Results
Current
State

Improved
State

%
Improvement

LT

32.5 hrs

11.3 hrs

65%

PT
AR
RFPY
# Steps

56 mins
2.9%
29%
14

43 mins*
6.3%
40%
11

23%
117%
38%
21%

100%

25%

75%

Metric

Tech turnover
(annual)

* This reduction (freed capacity) enabled the client to collect $500K more in annual
revenue without incurring additional labor or equipment expenses.
Current State Value Stream Map
Purchasing — Non-repetitive purchases less than $5,000
Supplies Purchasing - Current State VSM

Inititate Req.

1

Originator
31
PT = 10 mins.
C&A = 10%
Supplies
Hard Copy

Form File

File Maker

Quicken

Vendor
Website

Excel

ERP

Data Entry

Review
Budget

2

Review Req.

Finance
PT = 5 mins.
C&A = 60%

0.25 days

4 hrs.

PT = 5 mins.
C&A = 95%

0.5 days
5 mins.

20 Reqs

Review
Requisition

Review
5
Requisition

PT = 5 mins.
C&A = 90%

8 hrs.

PT = 5 mins.
C&A = 100%

1 days
5 mins.

7

10 Reqs

1

PT = 10 mins.
C&A = 95%

4 hrs.

PT = 15 mins.
C&A = 98%

0.5 days
10 mins.

Approve in
ERP

24 hrs.

PT = 5 mins.
C&A = 90%

3 days
15 mins.

Submit PO
to Supplier

8
63 Reqs

9

10
External
Supplier

Corp Purchasing
Manager
1

Admin Asst

Financial Mgr
1
8 hrs.

1 days
5 mins.

Enter
Requisition

Review
6
Requisition

IS Manager
1

1
40 hrs.

5 days
5 mins.

4

Sys Engineer

Supervisor
2

6
2 hrs.

3

Corp Purchasing
6
56 hrs.

PT = 15 mins.
C&A = 98%

7 days
5 mins.

80 hrs.

PT = 20 mins.

10 days
15 mins.

LT = 28.4 days
PT = 65 mins.
AR = 0.477%
RFPY = 4.2%

Customer Demand:
615 requisitions per y ear

PT = Process Time
LT = Lead Time
C&A = % Complete & Accurate
AR = Activ ity Ratio (PT/LT x 100)
RFPY = Rolled First Pass Y ield
Future State Value Stream Map
Purchasing — Non-repetitive purchases less than $5,000
Supplies Purchasing - Future State VSM

Additional
IT access
Enter Req.
in ERP
Integrate Form
File with File
Maker

1

Originator
31
PT=30 mins.
C&A = 85%
Supplies
Requisition
Checklist
Vendor
Websites

File Maker

Cross
Training

Approval

Additional
IT access

2

2

6 hrs.

0.75 days
5 mins.

Place
Order

3

4

5
External
Supplier

6

PT=20 mins.

80 hrs.

PT=20 mins.
C&A = 98%

1 days
5 mins.

Dedicated
Buyers

Corp Purchasing
8 hrs.

PT=5 mins.
C&A = 90%

PT=5 mins.
C&A = 95%

0.5 days

Approve
in ERP
Dept.
Manager
1

Supervisor
4 hrs.

Use budget in place
of Quicken

Auto Notify

Standard
Work for
review

Review
Req.

ERP

10 days
20 mins.

LT = 12.3 days
PT = 30 mins.
AR = 0.508%

Customer Demand:
615 requistions per year

PT = Process T ime
LT = Lead T ime
C&A = % Complete & Accurate
AR = Activity Ratio (PT /LT x 100)
RFPY = Rolled First Pass Yield

RFPY = 71%
Purchasing Process
Projected Results
Current
State

Projected
Future State

%
Improvement

28.4 days

12.3 days

56.7%

65 mins

30 mins

53.8%

Activity Ratio

0.48%

0.51%

6.3%

Rolled %C&A

4.2%

71.0%

1,590%

# Handoffs

10

5

50%

# IT Systems

6

3

50%

Metric

Total Lead Time
Total Process Time

%C&A = Correct & accurate (Quality)
Value Stream Mapping:
As Much Art as Science

© 2014 The Karen Martin Group, Inc.

40
Available Now!

To order from Amazon: www.bitly.com/VSMbk
For more information: www.ksmartin.com/VSM
© 2014 The Karen Martin Group, Inc.

41
For Further Questions
Karen Martin, President
7770 Regents Road #635
San Diego, CA 92122
858.677.6799
ksm@ksmartin.com
Blog & newsletter: www.ksmartin.com/subscribe

© 2014 The Karen Martin Group, Inc.

42

More Related Content

What's hot

Lean Transformation ~ A Journey
Lean Transformation ~ A JourneyLean Transformation ~ A Journey
Lean Transformation ~ A JourneyAnand Subramaniam
 
Value Stream Mapping: From Tool to Management Practice
Value Stream Mapping: From Tool to Management PracticeValue Stream Mapping: From Tool to Management Practice
Value Stream Mapping: From Tool to Management PracticeTKMG, Inc.
 
Value Stream Mapping in Office and Service
Value Stream Mapping in Office and ServiceValue Stream Mapping in Office and Service
Value Stream Mapping in Office and ServiceTKMG, Inc.
 
Clarity First: Process & Performance
Clarity First: Process & PerformanceClarity First: Process & Performance
Clarity First: Process & PerformanceTKMG, Inc.
 
Value Stream Analysis: Beyond the Mechanics - Part 1 (Planning)
Value Stream Analysis: Beyond the Mechanics - Part 1 (Planning)Value Stream Analysis: Beyond the Mechanics - Part 1 (Planning)
Value Stream Analysis: Beyond the Mechanics - Part 1 (Planning)TKMG, Inc.
 
Process Change: Communication & Training Tips
Process Change:  Communication & Training TipsProcess Change:  Communication & Training Tips
Process Change: Communication & Training TipsTKMG, Inc.
 
Lean Leadership: Part 2 of 3
Lean Leadership: Part 2 of 3Lean Leadership: Part 2 of 3
Lean Leadership: Part 2 of 3TKMG, Inc.
 
Lean Leadership - Part 3 of 3
Lean Leadership - Part 3 of 3Lean Leadership - Part 3 of 3
Lean Leadership - Part 3 of 3TKMG, Inc.
 
Value Stream Mapping Project Template by Operational Excellence Consulting
Value Stream Mapping Project Template by Operational Excellence ConsultingValue Stream Mapping Project Template by Operational Excellence Consulting
Value Stream Mapping Project Template by Operational Excellence ConsultingOperational Excellence Consulting
 
Value Stream Mapping: How to Visualize Work & Align Leadership for Organizati...
Value Stream Mapping: How to Visualize Work & Align Leadership for Organizati...Value Stream Mapping: How to Visualize Work & Align Leadership for Organizati...
Value Stream Mapping: How to Visualize Work & Align Leadership for Organizati...TKMG, Inc.
 
Building a Lean Enterprise: Navigating the Common Obstacles to Success
Building a Lean Enterprise: Navigating the Common Obstacles to SuccessBuilding a Lean Enterprise: Navigating the Common Obstacles to Success
Building a Lean Enterprise: Navigating the Common Obstacles to SuccessTKMG, Inc.
 
Clarity First - Problem Solving
Clarity First - Problem Solving Clarity First - Problem Solving
Clarity First - Problem Solving TKMG, Inc.
 
Certified kaizen practitioner v1.0
Certified kaizen practitioner v1.0Certified kaizen practitioner v1.0
Certified kaizen practitioner v1.0Vishy Chandra
 
How to Introduce Operational Excellence in your Organisation?
How to Introduce Operational Excellence in your Organisation?How to Introduce Operational Excellence in your Organisation?
How to Introduce Operational Excellence in your Organisation?Tina Arora
 
Operational Excellence: Getting the most out of your Lean and Six Sigma programs
Operational Excellence: Getting the most out of your Lean and Six Sigma programsOperational Excellence: Getting the most out of your Lean and Six Sigma programs
Operational Excellence: Getting the most out of your Lean and Six Sigma programsWilson Perumal and Company
 
Metrics-Based Process Mapping
Metrics-Based Process MappingMetrics-Based Process Mapping
Metrics-Based Process MappingTKMG, Inc.
 
Value Stream Mapping: What to Do Before You Dive In
Value Stream Mapping: What to Do Before You Dive InValue Stream Mapping: What to Do Before You Dive In
Value Stream Mapping: What to Do Before You Dive InTKMG, Inc.
 

What's hot (20)

13. value stream mapping
13. value stream mapping13. value stream mapping
13. value stream mapping
 
Lean Transformation ~ A Journey
Lean Transformation ~ A JourneyLean Transformation ~ A Journey
Lean Transformation ~ A Journey
 
Value Stream Mapping: From Tool to Management Practice
Value Stream Mapping: From Tool to Management PracticeValue Stream Mapping: From Tool to Management Practice
Value Stream Mapping: From Tool to Management Practice
 
Value Stream Mapping in Office and Service
Value Stream Mapping in Office and ServiceValue Stream Mapping in Office and Service
Value Stream Mapping in Office and Service
 
Clarity First: Process & Performance
Clarity First: Process & PerformanceClarity First: Process & Performance
Clarity First: Process & Performance
 
Value Stream Analysis: Beyond the Mechanics - Part 1 (Planning)
Value Stream Analysis: Beyond the Mechanics - Part 1 (Planning)Value Stream Analysis: Beyond the Mechanics - Part 1 (Planning)
Value Stream Analysis: Beyond the Mechanics - Part 1 (Planning)
 
Process Change: Communication & Training Tips
Process Change:  Communication & Training TipsProcess Change:  Communication & Training Tips
Process Change: Communication & Training Tips
 
Lean Leadership: Part 2 of 3
Lean Leadership: Part 2 of 3Lean Leadership: Part 2 of 3
Lean Leadership: Part 2 of 3
 
Lean Leadership - Part 3 of 3
Lean Leadership - Part 3 of 3Lean Leadership - Part 3 of 3
Lean Leadership - Part 3 of 3
 
Value Stream Mapping Project Template by Operational Excellence Consulting
Value Stream Mapping Project Template by Operational Excellence ConsultingValue Stream Mapping Project Template by Operational Excellence Consulting
Value Stream Mapping Project Template by Operational Excellence Consulting
 
Value Stream Mapping: How to Visualize Work & Align Leadership for Organizati...
Value Stream Mapping: How to Visualize Work & Align Leadership for Organizati...Value Stream Mapping: How to Visualize Work & Align Leadership for Organizati...
Value Stream Mapping: How to Visualize Work & Align Leadership for Organizati...
 
Building a Lean Enterprise: Navigating the Common Obstacles to Success
Building a Lean Enterprise: Navigating the Common Obstacles to SuccessBuilding a Lean Enterprise: Navigating the Common Obstacles to Success
Building a Lean Enterprise: Navigating the Common Obstacles to Success
 
Clarity First - Problem Solving
Clarity First - Problem Solving Clarity First - Problem Solving
Clarity First - Problem Solving
 
Lean Office by Operational Excellence Consulting
Lean Office by Operational Excellence ConsultingLean Office by Operational Excellence Consulting
Lean Office by Operational Excellence Consulting
 
Certified kaizen practitioner v1.0
Certified kaizen practitioner v1.0Certified kaizen practitioner v1.0
Certified kaizen practitioner v1.0
 
How to Introduce Operational Excellence in your Organisation?
How to Introduce Operational Excellence in your Organisation?How to Introduce Operational Excellence in your Organisation?
How to Introduce Operational Excellence in your Organisation?
 
Operational Excellence: Getting the most out of your Lean and Six Sigma programs
Operational Excellence: Getting the most out of your Lean and Six Sigma programsOperational Excellence: Getting the most out of your Lean and Six Sigma programs
Operational Excellence: Getting the most out of your Lean and Six Sigma programs
 
Metrics-Based Process Mapping
Metrics-Based Process MappingMetrics-Based Process Mapping
Metrics-Based Process Mapping
 
Value Stream Mapping: What to Do Before You Dive In
Value Stream Mapping: What to Do Before You Dive InValue Stream Mapping: What to Do Before You Dive In
Value Stream Mapping: What to Do Before You Dive In
 
Lean Process Improvement Techniques
Lean Process Improvement TechniquesLean Process Improvement Techniques
Lean Process Improvement Techniques
 

Viewers also liked

FM Communicator Flyer 215
FM Communicator Flyer 215FM Communicator Flyer 215
FM Communicator Flyer 215Albert Swai
 
Manual utilizare se_w350i_ug_ro
Manual utilizare se_w350i_ug_roManual utilizare se_w350i_ug_ro
Manual utilizare se_w350i_ug_roQuickmobile
 
Ser solidario es.. (IES Isabel Villena)
Ser solidario es.. (IES Isabel Villena)Ser solidario es.. (IES Isabel Villena)
Ser solidario es.. (IES Isabel Villena)consumogusto
 
Invitacion dia de campo beefamaster
Invitacion dia de campo beefamasterInvitacion dia de campo beefamaster
Invitacion dia de campo beefamasterZully Reyes Serrano
 
Using Chef and Vagrant at Gengo
Using Chef and Vagrant at GengoUsing Chef and Vagrant at Gengo
Using Chef and Vagrant at GengoGengo
 
Organisasjonen NITO Studentene
Organisasjonen NITO StudenteneOrganisasjonen NITO Studentene
Organisasjonen NITO StudenteneEmanuel Rygg
 
Direccionamiento ip2
Direccionamiento ip2Direccionamiento ip2
Direccionamiento ip2Gonzalo Ch
 
perspectives du numérique pour la rénovation énergétique
perspectives du numérique pour la rénovation énergétiqueperspectives du numérique pour la rénovation énergétique
perspectives du numérique pour la rénovation énergétiqueDeveko
 
Redes Sociales Web20 Panel De Expertos Jose Salazar Ascencio
Redes Sociales Web20 Panel De Expertos Jose Salazar AscencioRedes Sociales Web20 Panel De Expertos Jose Salazar Ascencio
Redes Sociales Web20 Panel De Expertos Jose Salazar AscencioJordi Sabater Domènech
 
As instituições brasileiras da era vargas
As instituições brasileiras da era vargas As instituições brasileiras da era vargas
As instituições brasileiras da era vargas Marcelo Sevaybricker
 
Freiämter Sagenweg Unterrichtsmaterial Teil 2
Freiämter Sagenweg Unterrichtsmaterial Teil 2Freiämter Sagenweg Unterrichtsmaterial Teil 2
Freiämter Sagenweg Unterrichtsmaterial Teil 2netzpirat
 
Schuco 120
Schuco 120Schuco 120
Schuco 120Schuco
 

Viewers also liked (20)

Historia news 3
Historia news 3Historia news 3
Historia news 3
 
FM Communicator Flyer 215
FM Communicator Flyer 215FM Communicator Flyer 215
FM Communicator Flyer 215
 
Manual utilizare se_w350i_ug_ro
Manual utilizare se_w350i_ug_roManual utilizare se_w350i_ug_ro
Manual utilizare se_w350i_ug_ro
 
Ser solidario es.. (IES Isabel Villena)
Ser solidario es.. (IES Isabel Villena)Ser solidario es.. (IES Isabel Villena)
Ser solidario es.. (IES Isabel Villena)
 
Ch 5 ppt
Ch 5 pptCh 5 ppt
Ch 5 ppt
 
Invitacion dia de campo beefamaster
Invitacion dia de campo beefamasterInvitacion dia de campo beefamaster
Invitacion dia de campo beefamaster
 
Guía de ecodiseño del sistema envase/producto para el sector industrial y de ...
Guía de ecodiseño del sistema envase/producto para el sector industrial y de ...Guía de ecodiseño del sistema envase/producto para el sector industrial y de ...
Guía de ecodiseño del sistema envase/producto para el sector industrial y de ...
 
Using Chef and Vagrant at Gengo
Using Chef and Vagrant at GengoUsing Chef and Vagrant at Gengo
Using Chef and Vagrant at Gengo
 
Organisasjonen NITO Studentene
Organisasjonen NITO StudenteneOrganisasjonen NITO Studentene
Organisasjonen NITO Studentene
 
Direccionamiento ip2
Direccionamiento ip2Direccionamiento ip2
Direccionamiento ip2
 
cap1.2
cap1.2cap1.2
cap1.2
 
Neoferr pinturas
Neoferr pinturasNeoferr pinturas
Neoferr pinturas
 
Egipto, Tierra de Faraones.
Egipto, Tierra de Faraones.Egipto, Tierra de Faraones.
Egipto, Tierra de Faraones.
 
perspectives du numérique pour la rénovation énergétique
perspectives du numérique pour la rénovation énergétiqueperspectives du numérique pour la rénovation énergétique
perspectives du numérique pour la rénovation énergétique
 
NTS USNA 004 MinCIT
NTS USNA 004 MinCITNTS USNA 004 MinCIT
NTS USNA 004 MinCIT
 
Redes Sociales Web20 Panel De Expertos Jose Salazar Ascencio
Redes Sociales Web20 Panel De Expertos Jose Salazar AscencioRedes Sociales Web20 Panel De Expertos Jose Salazar Ascencio
Redes Sociales Web20 Panel De Expertos Jose Salazar Ascencio
 
As instituições brasileiras da era vargas
As instituições brasileiras da era vargas As instituições brasileiras da era vargas
As instituições brasileiras da era vargas
 
Freiämter Sagenweg Unterrichtsmaterial Teil 2
Freiämter Sagenweg Unterrichtsmaterial Teil 2Freiämter Sagenweg Unterrichtsmaterial Teil 2
Freiämter Sagenweg Unterrichtsmaterial Teil 2
 
AulaOPE
AulaOPEAulaOPE
AulaOPE
 
Schuco 120
Schuco 120Schuco 120
Schuco 120
 

Similar to Value Stream Transformation: Achieving Excellence through Leadership Alignment and Holistic Design

Value Stream Mapping: Talk with Omaha Lean User Group
Value Stream Mapping: Talk with Omaha Lean User GroupValue Stream Mapping: Talk with Omaha Lean User Group
Value Stream Mapping: Talk with Omaha Lean User GroupTKMG, Inc.
 
Value Stream Mapping in Non-Manufacturing Environments
Value Stream Mapping in Non-Manufacturing EnvironmentsValue Stream Mapping in Non-Manufacturing Environments
Value Stream Mapping in Non-Manufacturing EnvironmentsTKMG, Inc.
 
How to Improve Performance with Next-Gen Sales Enablement Technology in Finan...
How to Improve Performance with Next-Gen Sales Enablement Technology in Finan...How to Improve Performance with Next-Gen Sales Enablement Technology in Finan...
How to Improve Performance with Next-Gen Sales Enablement Technology in Finan...Perficient, Inc.
 
Metrics-Based Process Mapping
Metrics-Based Process MappingMetrics-Based Process Mapping
Metrics-Based Process MappingTKMG, Inc.
 
Transforming Field Service into a Profit Powerhouse - Spencer Earp (ServiceMa...
Transforming Field Service into a Profit Powerhouse - Spencer Earp (ServiceMa...Transforming Field Service into a Profit Powerhouse - Spencer Earp (ServiceMa...
Transforming Field Service into a Profit Powerhouse - Spencer Earp (ServiceMa...Protectionandmanagement
 
Value Stream Mapping: Case Studies
Value Stream Mapping: Case StudiesValue Stream Mapping: Case Studies
Value Stream Mapping: Case StudiesTKMG, Inc.
 
Real World Results from an Investment in Process / Performance Improvement
Real World Results from an Investment in Process / Performance ImprovementReal World Results from an Investment in Process / Performance Improvement
Real World Results from an Investment in Process / Performance ImprovementDavid Greer - CMMI, LSSBB, ISO, CSM
 
Aligning People, Processes and Technology in Field Service
Aligning People, Processes and Technology in Field ServiceAligning People, Processes and Technology in Field Service
Aligning People, Processes and Technology in Field Servicefieldaware1
 
The C-Suite Data Advantage: How Workday Executives Reduce Costs and Make Bett...
The C-Suite Data Advantage: How Workday Executives Reduce Costs and Make Bett...The C-Suite Data Advantage: How Workday Executives Reduce Costs and Make Bett...
The C-Suite Data Advantage: How Workday Executives Reduce Costs and Make Bett...Workday, Inc.
 
VMWorld 2009 - Gebelin Getting To Yes!
VMWorld 2009 -  Gebelin Getting To Yes!VMWorld 2009 -  Gebelin Getting To Yes!
VMWorld 2009 - Gebelin Getting To Yes!cgebelin
 
Business Performance Management - Process Approach
Business Performance Management - Process ApproachBusiness Performance Management - Process Approach
Business Performance Management - Process ApproachAjay Koul
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate templateSteven Bonacorsi
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate templateSteven Bonacorsi
 
Learn to see, measure and automate with value stream management
Learn to see, measure and automate with value stream managementLearn to see, measure and automate with value stream management
Learn to see, measure and automate with value stream managementLance Knight
 
Sena yuret resume dec 15 2015
Sena yuret   resume dec 15 2015Sena yuret   resume dec 15 2015
Sena yuret resume dec 15 2015Yuret Sena
 
Lean Transformation in Office, Service, and Knowledge Work Enviroments
Lean Transformation in Office, Service, and Knowledge Work EnviromentsLean Transformation in Office, Service, and Knowledge Work Enviroments
Lean Transformation in Office, Service, and Knowledge Work EnviromentsTKMG, Inc.
 

Similar to Value Stream Transformation: Achieving Excellence through Leadership Alignment and Holistic Design (20)

Value Stream Mapping: Talk with Omaha Lean User Group
Value Stream Mapping: Talk with Omaha Lean User GroupValue Stream Mapping: Talk with Omaha Lean User Group
Value Stream Mapping: Talk with Omaha Lean User Group
 
Lean 101
Lean 101Lean 101
Lean 101
 
Value Stream Mapping in Non-Manufacturing Environments
Value Stream Mapping in Non-Manufacturing EnvironmentsValue Stream Mapping in Non-Manufacturing Environments
Value Stream Mapping in Non-Manufacturing Environments
 
How to Improve Performance with Next-Gen Sales Enablement Technology in Finan...
How to Improve Performance with Next-Gen Sales Enablement Technology in Finan...How to Improve Performance with Next-Gen Sales Enablement Technology in Finan...
How to Improve Performance with Next-Gen Sales Enablement Technology in Finan...
 
Metrics-Based Process Mapping
Metrics-Based Process MappingMetrics-Based Process Mapping
Metrics-Based Process Mapping
 
Transforming Field Service into a Profit Powerhouse - Spencer Earp (ServiceMa...
Transforming Field Service into a Profit Powerhouse - Spencer Earp (ServiceMa...Transforming Field Service into a Profit Powerhouse - Spencer Earp (ServiceMa...
Transforming Field Service into a Profit Powerhouse - Spencer Earp (ServiceMa...
 
Value Stream Mapping: Case Studies
Value Stream Mapping: Case StudiesValue Stream Mapping: Case Studies
Value Stream Mapping: Case Studies
 
Real World Results from an Investment in Process / Performance Improvement
Real World Results from an Investment in Process / Performance ImprovementReal World Results from an Investment in Process / Performance Improvement
Real World Results from an Investment in Process / Performance Improvement
 
Aligning People, Processes and Technology in Field Service
Aligning People, Processes and Technology in Field ServiceAligning People, Processes and Technology in Field Service
Aligning People, Processes and Technology in Field Service
 
The C-Suite Data Advantage: How Workday Executives Reduce Costs and Make Bett...
The C-Suite Data Advantage: How Workday Executives Reduce Costs and Make Bett...The C-Suite Data Advantage: How Workday Executives Reduce Costs and Make Bett...
The C-Suite Data Advantage: How Workday Executives Reduce Costs and Make Bett...
 
Prem Dsilva
Prem DsilvaPrem Dsilva
Prem Dsilva
 
CMMI Based Process Improvement ROI
CMMI Based Process Improvement ROICMMI Based Process Improvement ROI
CMMI Based Process Improvement ROI
 
PurviSangani_1
PurviSangani_1PurviSangani_1
PurviSangani_1
 
VMWorld 2009 - Gebelin Getting To Yes!
VMWorld 2009 -  Gebelin Getting To Yes!VMWorld 2009 -  Gebelin Getting To Yes!
VMWorld 2009 - Gebelin Getting To Yes!
 
Business Performance Management - Process Approach
Business Performance Management - Process ApproachBusiness Performance Management - Process Approach
Business Performance Management - Process Approach
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
Learn to see, measure and automate with value stream management
Learn to see, measure and automate with value stream managementLearn to see, measure and automate with value stream management
Learn to see, measure and automate with value stream management
 
Sena yuret resume dec 15 2015
Sena yuret   resume dec 15 2015Sena yuret   resume dec 15 2015
Sena yuret resume dec 15 2015
 
Lean Transformation in Office, Service, and Knowledge Work Enviroments
Lean Transformation in Office, Service, and Knowledge Work EnviromentsLean Transformation in Office, Service, and Knowledge Work Enviroments
Lean Transformation in Office, Service, and Knowledge Work Enviroments
 

More from TKMG, Inc.

Clarity the Essence of Lean Management
Clarity the Essence of Lean ManagementClarity the Essence of Lean Management
Clarity the Essence of Lean ManagementTKMG, Inc.
 
Clarity the Essence of Lean Management
Clarity the Essence of Lean ManagementClarity the Essence of Lean Management
Clarity the Essence of Lean ManagementTKMG, Inc.
 
CLEAR Problem-Solving Questions
CLEAR Problem-Solving QuestionsCLEAR Problem-Solving Questions
CLEAR Problem-Solving QuestionsTKMG, Inc.
 
Clarity First: What it is. Why you need it. How to get it.
Clarity First: What it is. Why you need it. How to get it.Clarity First: What it is. Why you need it. How to get it.
Clarity First: What it is. Why you need it. How to get it.TKMG, Inc.
 
Clarity First - You
Clarity First - YouClarity First - You
Clarity First - YouTKMG, Inc.
 
Clarity First: Purpose and Priorities
Clarity First: Purpose and PrioritiesClarity First: Purpose and Priorities
Clarity First: Purpose and PrioritiesTKMG, Inc.
 
Clarity First: Overview (1 of 5 webinars)
Clarity First: Overview (1 of 5 webinars)Clarity First: Overview (1 of 5 webinars)
Clarity First: Overview (1 of 5 webinars)TKMG, Inc.
 
Know How Data is Calculated - OEE example
Know How Data is Calculated - OEE exampleKnow How Data is Calculated - OEE example
Know How Data is Calculated - OEE exampleTKMG, Inc.
 
Daily Management Systems
Daily Management SystemsDaily Management Systems
Daily Management SystemsTKMG, Inc.
 
The Trust Factor: Eliminating Waste with a Reliable System
The Trust Factor: Eliminating Waste with a Reliable SystemThe Trust Factor: Eliminating Waste with a Reliable System
The Trust Factor: Eliminating Waste with a Reliable SystemTKMG, Inc.
 
Metrics Based Process Mapping Discount Code
Metrics Based Process Mapping Discount CodeMetrics Based Process Mapping Discount Code
Metrics Based Process Mapping Discount CodeTKMG, Inc.
 
Building the Fit Organization (with guest presenter Dan Markovitz)
Building the Fit Organization (with guest presenter Dan Markovitz)Building the Fit Organization (with guest presenter Dan Markovitz)
Building the Fit Organization (with guest presenter Dan Markovitz)TKMG, Inc.
 
Lean and the Corporate Agenda with Guest Jacob Stoller
Lean and the Corporate Agenda with Guest Jacob StollerLean and the Corporate Agenda with Guest Jacob Stoller
Lean and the Corporate Agenda with Guest Jacob StollerTKMG, Inc.
 
How to Truly Establish a CI Culture
How to Truly Establish a CI CultureHow to Truly Establish a CI Culture
How to Truly Establish a CI CultureTKMG, Inc.
 
Lean and Your Top & Bottom Lines
Lean and Your Top & Bottom LinesLean and Your Top & Bottom Lines
Lean and Your Top & Bottom LinesTKMG, Inc.
 
Problem Solving: The P in PDSA
Problem Solving: The P in PDSAProblem Solving: The P in PDSA
Problem Solving: The P in PDSATKMG, Inc.
 
Coaching: Asking the Right Questions
Coaching: Asking the Right QuestionsCoaching: Asking the Right Questions
Coaching: Asking the Right QuestionsTKMG, Inc.
 
A3 Management: Effective Problem Solving via PDSA
A3 Management: Effective Problem Solving via PDSAA3 Management: Effective Problem Solving via PDSA
A3 Management: Effective Problem Solving via PDSATKMG, Inc.
 
Respect for People: The Lean Way
Respect for People: The Lean WayRespect for People: The Lean Way
Respect for People: The Lean WayTKMG, Inc.
 
Reducing Resistance to Change
Reducing Resistance to ChangeReducing Resistance to Change
Reducing Resistance to ChangeTKMG, Inc.
 

More from TKMG, Inc. (20)

Clarity the Essence of Lean Management
Clarity the Essence of Lean ManagementClarity the Essence of Lean Management
Clarity the Essence of Lean Management
 
Clarity the Essence of Lean Management
Clarity the Essence of Lean ManagementClarity the Essence of Lean Management
Clarity the Essence of Lean Management
 
CLEAR Problem-Solving Questions
CLEAR Problem-Solving QuestionsCLEAR Problem-Solving Questions
CLEAR Problem-Solving Questions
 
Clarity First: What it is. Why you need it. How to get it.
Clarity First: What it is. Why you need it. How to get it.Clarity First: What it is. Why you need it. How to get it.
Clarity First: What it is. Why you need it. How to get it.
 
Clarity First - You
Clarity First - YouClarity First - You
Clarity First - You
 
Clarity First: Purpose and Priorities
Clarity First: Purpose and PrioritiesClarity First: Purpose and Priorities
Clarity First: Purpose and Priorities
 
Clarity First: Overview (1 of 5 webinars)
Clarity First: Overview (1 of 5 webinars)Clarity First: Overview (1 of 5 webinars)
Clarity First: Overview (1 of 5 webinars)
 
Know How Data is Calculated - OEE example
Know How Data is Calculated - OEE exampleKnow How Data is Calculated - OEE example
Know How Data is Calculated - OEE example
 
Daily Management Systems
Daily Management SystemsDaily Management Systems
Daily Management Systems
 
The Trust Factor: Eliminating Waste with a Reliable System
The Trust Factor: Eliminating Waste with a Reliable SystemThe Trust Factor: Eliminating Waste with a Reliable System
The Trust Factor: Eliminating Waste with a Reliable System
 
Metrics Based Process Mapping Discount Code
Metrics Based Process Mapping Discount CodeMetrics Based Process Mapping Discount Code
Metrics Based Process Mapping Discount Code
 
Building the Fit Organization (with guest presenter Dan Markovitz)
Building the Fit Organization (with guest presenter Dan Markovitz)Building the Fit Organization (with guest presenter Dan Markovitz)
Building the Fit Organization (with guest presenter Dan Markovitz)
 
Lean and the Corporate Agenda with Guest Jacob Stoller
Lean and the Corporate Agenda with Guest Jacob StollerLean and the Corporate Agenda with Guest Jacob Stoller
Lean and the Corporate Agenda with Guest Jacob Stoller
 
How to Truly Establish a CI Culture
How to Truly Establish a CI CultureHow to Truly Establish a CI Culture
How to Truly Establish a CI Culture
 
Lean and Your Top & Bottom Lines
Lean and Your Top & Bottom LinesLean and Your Top & Bottom Lines
Lean and Your Top & Bottom Lines
 
Problem Solving: The P in PDSA
Problem Solving: The P in PDSAProblem Solving: The P in PDSA
Problem Solving: The P in PDSA
 
Coaching: Asking the Right Questions
Coaching: Asking the Right QuestionsCoaching: Asking the Right Questions
Coaching: Asking the Right Questions
 
A3 Management: Effective Problem Solving via PDSA
A3 Management: Effective Problem Solving via PDSAA3 Management: Effective Problem Solving via PDSA
A3 Management: Effective Problem Solving via PDSA
 
Respect for People: The Lean Way
Respect for People: The Lean WayRespect for People: The Lean Way
Respect for People: The Lean Way
 
Reducing Resistance to Change
Reducing Resistance to ChangeReducing Resistance to Change
Reducing Resistance to Change
 

Recently uploaded

MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
PB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal BrandPB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal BrandSharisaBethune
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in PhilippinesDavidSamuel525586
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Doge Mining Website
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 

Recently uploaded (20)

MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
PB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal BrandPB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal Brand
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in Philippines
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 

Value Stream Transformation: Achieving Excellence through Leadership Alignment and Holistic Design

  • 1. Value Stream Transformation: Achieving Excellence through Leadership Alignment and Holistic Design CONNECT January 8, 2014
  • 2. Why Value Stream Mapping? Why Now? © 2014 The Karen Martin Group, Inc. To order from Amazon: www.bitly.com/VSMbk For more information: www.ksmartin.com/VSM 2
  • 3. Value Stream Mapping’s Roots • • • • • Value Value Stream Flow Pull Perfection 1996 © 2014 The Karen Martin Group, Inc. 3
  • 4. Value Stream Defined Value Stream: All of the activities required to transform a customer request into a good or service. Process Customer Request Process Process Customer Receipt First defined in The Machine That Changed the World, James Womack, Daniel Jones, & Daniel Roos, 1990. © 2014 The Karen Martin Group, Inc. 4
  • 5. Silo-Centric vs. Value Stream Thinking Function Function Function Function Support Value Stream Value stream segment Core Value Stream Value stream segment Support Value Stream © 2014 The Karen Martin Group, Inc. 5
  • 6. Value Stream Mapping’s Roots Mike Rother & John Shook 1999 Beau Keyte & Drew Locher 2004 Whenever there is a product for a customer, there is a value stream. The challenge lies in seeing it. © 2014 The Karen Martin Group, Inc. — Mike Rother & John Shook, Learning to See 6
  • 7. Value Stream Mapping: Common Failings • • • • • • • Using the mapping process solely as a work design exercise Using the map to make tactical improvements Creating maps but taking no action Mapping with an inappropriate team—or no team at all Creating value stream maps during a kaizen event Creating maps with no metrics Mapping without a team charter or not socializing it © 2014 The Karen Martin Group, Inc. 7
  • 8. Value Stream Thinking: Strategy Before Tactics Where am I? Where do I want to go? Which route should I take? I-80 option © 2014 The Karen Martin Group, Inc. ? ? ? I-40 option I-70 option 8
  • 9. Value Stream Mapping Benefit: Reaching Leadership Consensus © 2014 The Karen Martin Group, Inc. 9
  • 10. Value Stream Mapping enables a mapping team to get ABOVE the work © 2014 The Karen Martin Group, Inc. 10
  • 11. VSM Promotes Systems Thinking Individual Efficiency = Sub-optimization System Efficiency = Optimal Value Stream Performance © 2014 The Karen Martin Group, Inc. 11
  • 12. Work: Degrees of Granularity Macro Perspective • • • Value Stream Define strategic direction (“what”) Heavy leadership involvement Value Stream Mapping Process Process Micro Perspective Process • • Step © 2014 The Karen Martin Group, Inc. Step Step • Identify the tactical “how” Heavy frontline involvement Metrics-Based Process Mapping 12
  • 13. Work: Degrees of Granularity Order Fulfillment Value Stream Order Fulfillment Strategic Value-stream Perspective Quote Tactical Process-level Perspective © 2014 The Karen Martin Group, Inc. Design Produce Fabricate Assemble Ship 13
  • 14. Value Stream Mapping: Visualize your Entire Operation on a Single Sheet of Paper © 2014 The Karen Martin Group, Inc. 14
  • 15. Basic Value Stream Map: 3 Sections ABC Technology, Inc. Current State Value Stream Map Name of Value Stream Being Mapped Demand Rate = XX / Year Name of Value Stream Champion Mapping Date 1 Customer 1 Information Flow IT-1 IT-2 3 2 4 5 6 Process 1 Work Flow 1 items Process 3 Process 4 Process 5 Function A 2 Process 2 Function B Function C Function D Function E 5 11 Timeline LT = 0.5 days PT = 5 mins. %C&A = 75% 480 mins. 240 mins. 10 mins. 3 LT = 1 days PT = 10 mins. %C&A = 50% 5 mins. 45 items 3 LT = 5 days PT = 120 mins. %C&A = 85% 10 items 7 4 LT = 2 days PT = 30 mins. %C&A = 99% LT = 1 days PT = 15 mins. %C&A = 95% 5 days 2 days 480 mins. 120 mins. 30 mins. 15 mins. Total LT = 9.5 days Total PT = 180 mins. Activ ity Ratio = 3.9% Rolled %C&A = 30.0% © 2014 The Karen Martin Group, Inc. 15
  • 16. Basic Value Stream Map: Future State ABC Technology, Inc. Future State Value Stream Map Name of Value Stream Being Mapped Demand Rate = XX / Year Name of Value Stream Champion Mapping Date 1 Customer IT interface Standard work Error proof IT-1 Crosstrain Modified approvals 2 Process 1 3 Crosstrain Process 2 Function A 1 items IT-2 5 Process 3 Function C 5 items LT = 1 days PT = 10 mins. %C&A = 99% 4 Standard work Function E 10 items 3 LT = 2 days PT = 120 mins. %C&A = 95% 4 LT = 0.5 days PT = 30 mins. %C&A = 95% 1 days © 2014 The Karen Martin Group, Inc. 2 days 0.5 days Total LT = 3.5 days 10 mins. 120 mins. 30 mins. Total PT = 160 mins. Activity Ratio = 9.5% Rolled %C&A = 89.3% 16
  • 17. Basic Value Stream Future State Performance Metrics Current State Projected Future State Projected % Improvement 9.5 days 3.5 days 63.2% 180 minutes 160 minutes 11.1% Activity Ratio 3.9% 9.5% 143.6% Rolled % Complete & Accurate 30.0% 89.3% 197.7% Metric Total Lead Time Total Process Time User defined User defined © 2014 The Karen Martin Group, Inc. 17
  • 18. Value Stream Mapping Executing Transformation Plan © 2014 The Karen Martin Group, Inc. Making Specific Improvements 18
  • 19. Value Stream Mapping Activity Phases and Timing Repeat Prepare 4 Weeks Prior to Mapping © 2014 The Karen Martin Group, Inc. Understand Current State Design Future State Develop Transformation Plan Three Consecutive Days Execute Transformation Plan Following Mapping 19
  • 20. Charter: Critical planning, communication, and consensus-building tool Value Stream Mapping Charter Scope Accountable Parties Logistics Executive Allen Ward Sponsor Value Stream Capital equipment Specific Engineer to order, requires both hardware & Conditions software customization Event Dates July 24-26, 2013 & Times 8:00 am - 5:00 pm Value Stream Nancy Little Champion Demand Rate 1,000 per year Base-camp Surf's Up - Room A Location Facilitator Dave Parks Trigger Customer submits RFQ First Step Sales reviews the RFQ Logistics Dave Parks Coordinator Last Step Production ships product Boundaries & No new software; only minor changes to existing IT Limitations systems; no additional staff; no budget changes Briefing Attendees ** required *optional Improvement Time Future state design is fully realized by Frame December 31, 2013. Meals Continential breakfast & lunch Provided ** Allen W (COO), Joe M (CIO), Sal T (VP Sales) * Bruce R (VP Ops), Carlos P (HR), Su T (CFO), Bill M (VP CS) Current State Problems & Business Needs Briefing July 24, 25, & 26 Dates & 4:00-5:00 pm Times Mapping Team 1 Desire to stay ahead of the competition & deepen customer loyalty. Function / Title Name 2 Forecasted growth of 15% for next fiscal year. 1 Sales, Director 3 Unclear & incorrect information flowing through value stream. 2 IT, Director Diana Marie 4 Lead time for RFQ turnaround = 2 weeks; PO to software dev = 5 weeks 3 Finance, Controller Dave Gerald 5 (Competition's RFQ LT is 1 wk and PO to delivery is 4 wks) 4 Scrum Master Ryan Austin 5 Engineering, Vice President Nancy Little 1 Reduce RFQ lead time by a minimum of 50%. 6 Manufacturing, Director Ambreen Motiwala 2 Reduce PO to software development lead time by a minimum of 50%. 7 Customer Service, Manager Danny Tran 3 Improve quality of information flowing throughout value stream. 8 Customer (contract manufacturer) JR Hunt 4 Contact Information Sean Michaels 9 Goals & Measurable Target Conditions 5 10 Benefits to Customers & Business On-Call Support 1 Faster delivery; less hassle; less cost. Function Name 2 Better working relationships between sales, estimating & engineering. 3 Freed capacity to absorb additional business w/o increasing staff. 2 Production Supervisor 4 Contact Information 1 Planning / Purchasing, Planner Lourdes Dwyer 3 5 Tom St. James 4 Relevant Data Agreement 1 Sales effectiveness: RFQ conversion rate. Executive Sponsor Value Stream Champion Facilitator 2 Financial: Estimate-to-actual cost comparison. 3 Operational: LT in segments (RFQ to quote; PO to development). Signature: Signature: Signature: 4 Date: Date: Date: © 2014 The Karen Martin Group, Inc. 20
  • 21. Charter: Critical planning, communication, and consensus-building tool Value Stream Mapping Charter Scope Accountable Parties Logistics Executive Allen Ward Sponsor Value Stream Capital equipment Specific Engineer to order, requires both hardware & Conditions software customization Event Dates July 24-26, 2013 & Times 8:00 am - 5:00 pm Value Stream Nancy Little Champion Demand Rate 1,000 per year Base-camp Surf's Up - Room A Location Facilitator Dave Parks Trigger Customer submits RFQ First Step Sales reviews the RFQ Logistics Dave Parks Coordinator Last Step Production ships product Boundaries & No new software; only minor changes to existing IT Limitations systems; no additional staff; no budget changes Briefing Attendees ** required *optional Improvement Time Future state design is fully realized by Frame December 31, 2013. Meals Continential breakfast & lunch Provided ** Allen W (COO), Joe M (CIO), Sal T (VP Sales) * Bruce R (VP Ops), Carlos P (HR), Su T (CFO), Bill M (VP CS) Current State Problems & Business Needs Briefing July 24, 25, & 26 Dates & 4:00-5:00 pm Times Mapping Team 1 Desire to stay ahead of the competition & deepen customer loyalty. Function / Title Name 2 Forecasted growth of 15% for next fiscal year. 1 Sales, Director 3 Unclear & incorrect information flowing through value stream. 2 IT, Director Diana Marie 4 Lead time for RFQ turnaround = 2 weeks; PO to software dev = 5 weeks 3 Finance, Controller Dave Gerald 5 (Competition's RFQ LT is 1 wk and PO to delivery is 4 wks) 4 Scrum Master Ryan Austin 5 Engineering, Vice President Nancy Little 1 Reduce RFQ lead time by a minimum of 50%. 6 Manufacturing, Director Ambreen Motiwala 2 Reduce PO to software development lead time by a minimum of 50%. 7 Customer Service, Manager Danny Tran 3 Improve quality of information flowing throughout value stream. 8 Customer (contract manufacturer) JR Hunt 4 Contact Information Sean Michaels 9 Goals & Measurable Target Conditions 5 10 Benefits to Customers & Business On-Call Support 1 Faster delivery; less hassle; less cost. Function Name 2 Better working relationships between sales, estimating & engineering. 3 Freed capacity to absorb additional business w/o increasing staff. 2 Production Supervisor 4 Contact Information 1 Planning / Purchasing, Planner Lourdes Dwyer 3 5 Tom St. James 4 Relevant Data Agreement 1 Sales effectiveness: RFQ conversion rate. Executive Sponsor Value Stream Champion Facilitator 2 Financial: Estimate-to-actual cost comparison. 3 Operational: LT in segments (RFQ to quote; PO to development). Signature: Signature: Signature: 4 Date: Date: Date: © 2014 The Karen Martin Group, Inc. 21
  • 22. Charter: Critical planning, communication, and consensus-building tool Value Stream Mapping Charter Scope Accountable Parties Logistics Executive Allen Ward Sponsor Value Stream Capital equipment Specific Engineer to order, requires both hardware & Conditions software customization Event Dates July 24-26, 2013 & Times 8:00 am - 5:00 pm Value Stream Nancy Little Champion Demand Rate 1,000 per year Base-camp Surf's Up - Room A Location Facilitator Dave Parks Trigger Customer submits RFQ First Step Sales reviews the RFQ Logistics Dave Parks Coordinator Last Step Production ships product Boundaries & No new software; only minor changes to existing IT Limitations systems; no additional staff; no budget changes Briefing Attendees ** required *optional Improvement Time Future state design is fully realized by Frame December 31, 2013. Meals Continential breakfast & lunch Provided ** Allen W (COO), Joe M (CIO), Sal T (VP Sales) * Bruce R (VP Ops), Carlos P (HR), Su T (CFO), Bill M (VP CS) Current State Problems & Business Needs Briefing July 24, 25, & 26 Dates & 4:00-5:00 pm Times Mapping Team 1 Desire to stay ahead of the competition & deepen customer loyalty. Function / Title Name 2 Forecasted growth of 15% for next fiscal year. 1 Sales, Director 3 Unclear & incorrect information flowing through value stream. 2 IT, Director Diana Marie 4 Lead time for RFQ turnaround = 2 weeks; PO to software dev = 5 weeks 3 Finance, Controller Dave Gerald 5 (Competition's RFQ LT is 1 wk and PO to delivery is 4 wks) 4 Scrum Master Ryan Austin 5 Engineering, Vice President Nancy Little 1 Reduce RFQ lead time by a minimum of 50%. 6 Manufacturing, Director Ambreen Motiwala 2 Reduce PO to software development lead time by a minimum of 50%. 7 Customer Service, Manager Danny Tran 3 Improve quality of information flowing throughout value stream. 8 Customer (contract manufacturer) JR Hunt 4 Contact Information Sean Michaels 9 Goals & Measurable Target Conditions 5 10 Benefits to Customers & Business On-Call Support 1 Faster delivery; less hassle; less cost. Function Name 2 Better working relationships between sales, estimating & engineering. 3 Freed capacity to absorb additional business w/o increasing staff. 2 Production Supervisor 4 Contact Information 1 Planning / Purchasing, Planner Lourdes Dwyer 3 5 Tom St. James 4 Relevant Data Agreement 1 Sales effectiveness: RFQ conversion rate. Executive Sponsor Value Stream Champion Facilitator 2 Financial: Estimate-to-actual cost comparison. 3 Operational: LT in segments (RFQ to quote; PO to development). Signature: Signature: Signature: 4 Date: Date: Date: © 2014 The Karen Martin Group, Inc. 22
  • 23. Charter: Critical planning, communication, and consensus-building tool Value Stream Mapping Charter Scope Accountable Parties Logistics Executive Allen Ward Sponsor Value Stream Capital equipment Specific Engineer to order, requires both hardware & Conditions software customization Event Dates July 24-26, 2013 & Times 8:00 am - 5:00 pm Value Stream Nancy Little Champion Demand Rate 1,000 per year Base-camp Surf's Up - Room A Location Facilitator Dave Parks Trigger Customer submits RFQ First Step Sales reviews the RFQ Logistics Dave Parks Coordinator Last Step Production ships product Boundaries & No new software; only minor changes to existing IT Limitations systems; no additional staff; no budget changes Briefing Attendees ** required *optional Improvement Time Future state design is fully realized by Frame December 31, 2013. Meals Continential breakfast & lunch Provided ** Allen W (COO), Joe M (CIO), Sal T (VP Sales) * Bruce R (VP Ops), Carlos P (HR), Su T (CFO), Bill M (VP CS) Current State Problems & Business Needs Briefing July 24, 25, & 26 Dates & 4:00-5:00 pm Times Mapping Team 1 Desire to stay ahead of the competition & deepen customer loyalty. Function / Title Name 2 Forecasted growth of 15% for next fiscal year. 1 Sales, Director 3 Unclear & incorrect information flowing through value stream. 2 IT, Director Diana Marie 4 Lead time for RFQ turnaround = 2 weeks; PO to software dev = 5 weeks 3 Finance, Controller Dave Gerald 5 (Competition's RFQ LT is 1 wk and PO to delivery is 4 wks) 4 Scrum Master Ryan Austin 5 Engineering, Vice President Nancy Little 1 Reduce RFQ lead time by a minimum of 50%. 6 Manufacturing, Director Ambreen Motiwala 2 Reduce PO to software development lead time by a minimum of 50%. 7 Customer Service, Manager Danny Tran 3 Improve quality of information flowing throughout value stream. 8 Customer (contract manufacturer) JR Hunt 4 Contact Information Sean Michaels 9 Goals & Measurable Target Conditions 5 10 Benefits to Customers & Business On-Call Support 1 Faster delivery; less hassle; less cost. Function Name 2 Better working relationships between sales, estimating & engineering. 3 Freed capacity to absorb additional business w/o increasing staff. 2 Production Supervisor 4 Contact Information 1 Planning / Purchasing, Planner Lourdes Dwyer 3 5 Tom St. James 4 Relevant Data Agreement 1 Sales effectiveness: RFQ conversion rate. Executive Sponsor Value Stream Champion Facilitator 2 Financial: Estimate-to-actual cost comparison. 3 Operational: LT in segments (RFQ to quote; PO to development). Signature: Signature: Signature: 4 Date: Date: Date: © 2014 The Karen Martin Group, Inc. 23
  • 24. Value Stream Scoping Diagram Defining Specific Conditions Catalog Configure to order Custom hardware Engineer to order Custom software New Product Development Both Capital Equipment Golden State Equipment, Inc. Catalog Spares & subassemblies Engineer to order © 2014 The Karen Martin Group, Inc. 24
  • 25. Where should the “fenceposts” be? Function Activity Marketing Sales Calls on and qualifies customers Customer Submits RFQ to sales Sales Reviews RFQ Estimating Generates quote Sales Approve quote Customer Accepts quote; submits a PO Sales Approves PO Customer service Creates SO; compiles spec package EE/ME design Designs product; generates BOM Customer Approves design EE/ME design Forwards design to SW dev Software Dev Writes code Purchasing/Planning Releases WO; schedules production Supplier (external) Delivers materials Production Manufactures & ships product Customer Installs equipment Field service © 2014 The Karen Martin Group, Inc. Generates sales leads Conducts 90-day follow-up 25
  • 26. Who should be on the team, serve on-call, and attend daily briefings? © 2014 The Karen Martin Group, Inc. 26
  • 27. Charter: Critical planning, communication, and consensus-building tool Value Stream Mapping Charter Scope Accountable Parties Logistics Executive Allen Ward Sponsor Value Stream Capital equipment Specific Engineer to order, requires both hardware & Conditions software customization Event Dates July 24-26, 2013 & Times 8:00 am - 5:00 pm Value Stream Nancy Little Champion Demand Rate 1,000 per year Base-camp Surf's Up - Room A Location Facilitator Dave Parks Trigger Customer submits RFQ First Step Sales reviews the RFQ Logistics Dave Parks Coordinator Last Step Production ships product Boundaries & No new software; only minor changes to existing IT Limitations systems; no additional staff; no budget changes Briefing Attendees ** required *optional Improvement Time Future state design is fully realized by Frame December 31, 2013. Meals Continential breakfast & lunch Provided ** Allen W (COO), Joe M (CIO), Sal T (VP Sales) * Bruce R (VP Ops), Carlos P (HR), Su T (CFO), Bill M (VP CS) Current State Problems & Business Needs Briefing July 24, 25, & 26 Dates & 4:00-5:00 pm Times Mapping Team 1 Desire to stay ahead of the competition & deepen customer loyalty. Function / Title Name 2 Forecasted growth of 15% for next fiscal year. 1 Sales, Director 3 Unclear & incorrect information flowing through value stream. 2 IT, Director Diana Marie 4 Lead time for RFQ turnaround = 2 weeks; PO to software dev = 5 weeks 3 Finance, Controller Dave Gerald 5 (Competition's RFQ LT is 1 wk and PO to delivery is 4 wks) 4 Scrum Master Ryan Austin 5 Engineering, Vice President Nancy Little 1 Reduce RFQ lead time by a minimum of 50%. 6 Manufacturing, Director Ambreen Motiwala 2 Reduce PO to software development lead time by a minimum of 50%. 7 Customer Service, Manager Danny Tran 3 Improve quality of information flowing throughout value stream. 8 Customer (contract manufacturer) JR Hunt 4 Contact Information Sean Michaels 9 Goals & Measurable Target Conditions 5 10 Benefits to Customers & Business On-Call Support 1 Faster delivery; less hassle; less cost. Function Name 2 Better working relationships between sales, estimating & engineering. 3 Freed capacity to absorb additional business w/o increasing staff. 2 Production Supervisor 4 Contact Information 1 Planning / Purchasing, Planner Lourdes Dwyer 3 5 Tom St. James 4 Relevant Data Agreement 1 Sales effectiveness: RFQ conversion rate. Executive Sponsor Value Stream Champion Facilitator 2 Financial: Estimate-to-actual cost comparison. 3 Operational: LT in segments (RFQ to quote; PO to development). Signature: Signature: Signature: 4 Date: Date: Date: © 2014 The Karen Martin Group, Inc. 27
  • 28. Create the Current State Map Prepare 1. 2. 3. 4. 5. Understand Current State Design Future State Develop Transformation Plan Execute Transformation Plan Value stream walk #1 Layout the map Value stream walk #2 Add map details Add timeline; calculate summary metrics 28
  • 29. Effective Way to Visualize Relationships between IT Systems and the Operation © 2014 The Karen Martin Group, Inc. 29
  • 30. Create the Future State Map Prepare Understand Current State Design Future State Develop Transformation Plan Execute Transformation Plan 1. Define the “right work” 2. Make the right work flow 3. Manage the right work 30
  • 31. How will you realize the future state? Prepare Understand Current State Develop Transformation Plan Design Future State Execute Transformation Plan Value Stream Transformation Plan Value Stream Executive Sponsor Value Stream Champion Value Stream Mapping Facilitator Date Created FS VSM Block # 2 Measurable Target Scheduled Review Dates Outpatient Imaging Allen Ward 1-Nov-12 Paul Scanner 21-Nov-12 Dave Parks 13-Dec-12 10/18/2012 10-Jan-13 Proposed Countermeasure Exec. Method* Owner Planned Timeline for Execution 1 2 3 4 5 6 7 8 9 10 11 12 Status Improve quality of referral to 85% Implement standard work for referral process KE Sean Michaels 100% Reduce lead time between scheduling and preregistration step to 45 minutes Cross-train and co-locate work teams Proj Dianne Marie 75% 4 Only one check in per patient Collect copays in Imaging KE Ryan Austin 50% 4 Reduce wait time in waiting area by 50% Balance work / level demand KE Dianne Marie 50% 6 Eliminate 6 hour lead time associated with transcription step Implement voice recognition technology Proj Dave Gerald 50% 7 Eliminate redundant data entry Auto populate between PACS and Meditech Proj Dave Gerald 25% 5 Visually managed inventory; no outages or expired items 5S CT supplies area; implement kanban KE Michael O'Shea 100% 6 Reduce imaging LT to one hour Value-stream specific radiologists Proj Martha Allen 25% 8 Reduce report delivery LT to 30 minutes Increase % of physicians receiving electronic delivery Proj Martha Allen 0% 7 Reduce LT at image review to 1 day Visual metrics and indicators JDI Dave Gerald 100% 3,4 Agreement Executive Sponsor Value Stream Champion Value Stream Mapping Facilitator Signature: Signature: Signature: Date: Date: Date: * Execution Method = JDI (Just-do-it), KE (Kaizen Event), or Proj (Project) 31
  • 32. Where the rubber meets the road… Prepare Understand Current State Design Future State Develop Transformation Plan Execute Transformation Plan • Accountability rests with executive sponsor • Monthly status meetings • Adjust plan as new discoveries are made 32
  • 34. Current State Value Stream Map Outpatient Imaging Services Pre-register Patient Customer Demand: 15 patients perDay (Takt Time 1920seconds) 8 hours per day Schedule Appointment Referring Physician Hospital 4 3 5 Lead Time = 24 days 2 6 Lead Time = 990 mins. Cycle Time = 30 mins. Lead Time = 990 mins. % C&A = 100 % Demand = 15 per day 1 Lead Time = 12 mins. Cycle Time = 11 mins. Lead Time = 12 mins. % C&A = 98 % % C&A = 65 % CT=Cycle Time LT=Lead Time %C&A=% Complete & Accurate Symposium E Pay Excel ADS Internet Meditech Fax Order Solutions Waiting Room Management System PACS Auto Fax 50% Us Mail 25% MD Mailbox 25% Rework Loop via Fax 25% of the time Check-in Patient (Admitting) Prep Patient (Tech) Check-in Patient (Imaging) Complete Exam (Tech) Transmit Images (Tech) Read/Dictate Exam (Radiologist) Transcribe Report (MDI) Review Draft/Sign (Radiologist) Print Reports (Imaging) Send Reports (Imaging) 5 mins. 5 5 5 mins. Cycle Time = 2 mins. % C&A = 90 % 0.0833 hrs. 3 0.0833 hrs. 2 mins. 6 Cycle Time = 1 mins. % C&A = 98 % 45 mins. 2 0.75 hrs. 1 mins. 7 30 mins. Cycle Time = 10 mins. % C&A = 100 % 2 0.5 hrs. 10 mins. 8 5 mins. Cycle Time = 15 mins. % C&A = 90 % 2 0.0833 hrs. 15 mins. 9 248 mins. Cycle Time = 3 mins. % C&A = 100 % 2 10 4.13 hrs. 3 mins. 365 mins. Cycle Time = 15 mins. % C&A = 95 % 6 11 6.08 hrs. 15 mins. 960 mins. Cycle Time = 5 mins. % C&A = 75 % 2 12 16 hrs. 5 mins. 110 mins. Cycle Time = 1 mins. % C&A = 95 % 2 1.83 hrs. 1 mins. 13 120 mins. Cycle Time = 1 mins. % C&A = 99 % 6 2 hrs. 1 mins. 14 Cycle Time = 3 mins. % C&A = 90 % LT = 32.5 hrs. 3 mins. CT = 56 mins. CT/LT Ratio = 2.87% Rolled First Pass yield = 29%
  • 35. Future State Value Stream Map Outpatient Imaging Services Standard Work Work Balance Customer Demand: 15 patients perDay (Takt Time1920 seconds) 8 hours per day Co-locate Schedule appt Pre-register Referring Physician Hospital 3 Lead Time = 15 days 2 6 Demand = 15 per day 1 Lead Time = 45 mins. Cycle Time = 11 mins. Lead Time = 45 mins. % C&A = 98 % % C&A = 85 % Risk Reduction (Joint Commision) Symposium E Pay Excel Internet Waiting Room Management System Work Balancing Standard Work 3 35 mins. 4 Cycle Time = 1 mins. % C&A = 98 % 0.0833 hrs. 2 Complete Exam (Tech) 5 20 mins. Cycle Time = 10 mins. % C&A = 100 % 0.583 hrs. 1 mins. 2 Transmit Images (Tech) 6 5 mins. Cycle Time = 10 mins. % C&A = 90 % 0.333 hrs. 10 mins. Visual Workplace Set-up Reduction Prep Patient (Tech) Check-in Patient (Imaging) Fax Order Solutions PACS Auto Fax 80% Us Mail 15% MD Mailbox 5% 5S Value Stream Alignment Pull System (Supplies Kanban) Remove Check in and Reduce System Access 5 mins. Meditech CT=Cycle Time LT=Lead Time %C&A=% Complete & Accurate 2 7 120 mins. 2 Review Draft/Sign (Radiologist) 420 mins. Cycle Time = 15 mins. % C&A = 95 % 2 hrs. 2 mins. 8 Batch Reductions Voice Recognition Read/Dictate Exam (Radiologist) Cycle Time = 2 mins. % C&A = 100 % 0.0833 hrs. 10 mins. Continuous Flow 2 Print Reports (Imaging) 9 2 mins. Cycle Time = 1 mins. % C&A = 95 % 7 hrs. 15 mins. Rework Loop via Fax 10% of the time 2 30 mins. Cycle Time = 1 mins. % C&A = 99 % 0.0333 hrs. 1 mins. 10 Send Reports (Imaging) 6 0.5 hrs. 1 mins. 11 Cycle Time = 3 mins. % C&A = 90 % LT = 11.3 hrs. 3 mins. CT = 43 mins. CT/LT Ratio = 6.32% Rolled First Pass yield = 40%
  • 36. Outpatient Imaging Value Stream Improvement Results Current State Improved State % Improvement LT 32.5 hrs 11.3 hrs 65% PT AR RFPY # Steps 56 mins 2.9% 29% 14 43 mins* 6.3% 40% 11 23% 117% 38% 21% 100% 25% 75% Metric Tech turnover (annual) * This reduction (freed capacity) enabled the client to collect $500K more in annual revenue without incurring additional labor or equipment expenses.
  • 37. Current State Value Stream Map Purchasing — Non-repetitive purchases less than $5,000 Supplies Purchasing - Current State VSM Inititate Req. 1 Originator 31 PT = 10 mins. C&A = 10% Supplies Hard Copy Form File File Maker Quicken Vendor Website Excel ERP Data Entry Review Budget 2 Review Req. Finance PT = 5 mins. C&A = 60% 0.25 days 4 hrs. PT = 5 mins. C&A = 95% 0.5 days 5 mins. 20 Reqs Review Requisition Review 5 Requisition PT = 5 mins. C&A = 90% 8 hrs. PT = 5 mins. C&A = 100% 1 days 5 mins. 7 10 Reqs 1 PT = 10 mins. C&A = 95% 4 hrs. PT = 15 mins. C&A = 98% 0.5 days 10 mins. Approve in ERP 24 hrs. PT = 5 mins. C&A = 90% 3 days 15 mins. Submit PO to Supplier 8 63 Reqs 9 10 External Supplier Corp Purchasing Manager 1 Admin Asst Financial Mgr 1 8 hrs. 1 days 5 mins. Enter Requisition Review 6 Requisition IS Manager 1 1 40 hrs. 5 days 5 mins. 4 Sys Engineer Supervisor 2 6 2 hrs. 3 Corp Purchasing 6 56 hrs. PT = 15 mins. C&A = 98% 7 days 5 mins. 80 hrs. PT = 20 mins. 10 days 15 mins. LT = 28.4 days PT = 65 mins. AR = 0.477% RFPY = 4.2% Customer Demand: 615 requisitions per y ear PT = Process Time LT = Lead Time C&A = % Complete & Accurate AR = Activ ity Ratio (PT/LT x 100) RFPY = Rolled First Pass Y ield
  • 38. Future State Value Stream Map Purchasing — Non-repetitive purchases less than $5,000 Supplies Purchasing - Future State VSM Additional IT access Enter Req. in ERP Integrate Form File with File Maker 1 Originator 31 PT=30 mins. C&A = 85% Supplies Requisition Checklist Vendor Websites File Maker Cross Training Approval Additional IT access 2 2 6 hrs. 0.75 days 5 mins. Place Order 3 4 5 External Supplier 6 PT=20 mins. 80 hrs. PT=20 mins. C&A = 98% 1 days 5 mins. Dedicated Buyers Corp Purchasing 8 hrs. PT=5 mins. C&A = 90% PT=5 mins. C&A = 95% 0.5 days Approve in ERP Dept. Manager 1 Supervisor 4 hrs. Use budget in place of Quicken Auto Notify Standard Work for review Review Req. ERP 10 days 20 mins. LT = 12.3 days PT = 30 mins. AR = 0.508% Customer Demand: 615 requistions per year PT = Process T ime LT = Lead T ime C&A = % Complete & Accurate AR = Activity Ratio (PT /LT x 100) RFPY = Rolled First Pass Yield RFPY = 71%
  • 39. Purchasing Process Projected Results Current State Projected Future State % Improvement 28.4 days 12.3 days 56.7% 65 mins 30 mins 53.8% Activity Ratio 0.48% 0.51% 6.3% Rolled %C&A 4.2% 71.0% 1,590% # Handoffs 10 5 50% # IT Systems 6 3 50% Metric Total Lead Time Total Process Time %C&A = Correct & accurate (Quality)
  • 40. Value Stream Mapping: As Much Art as Science © 2014 The Karen Martin Group, Inc. 40
  • 41. Available Now! To order from Amazon: www.bitly.com/VSMbk For more information: www.ksmartin.com/VSM © 2014 The Karen Martin Group, Inc. 41