Our Addition Process

280 views

Published on

Good Homes and Additions adds a family room and master bath to our home.
December 3, 2010 - January 28, 2011

Published in: Art & Photos
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
280
On SlideShare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Our Addition Process

  1. 1. Good Homes & Additions<br />adds a family room<br />and master bathroom<br />to our home<br />December 3, 2010 – January 28, 2011<br />
  2. 2. BEFORE<br />
  3. 3. Day 1<br />Officially underway!<br />
  4. 4. Taking off the deck<br />
  5. 5. Digging the hole<br />
  6. 6. Our dirt piles<br />
  7. 7. The foundation<br />
  8. 8.
  9. 9. Day 2<br />Special delivery<br />
  10. 10. The cinder block arrives<br />
  11. 11.
  12. 12.
  13. 13. More piles in the yard<br />
  14. 14. Day 3<br />The mason gets to work on the crawl space<br />
  15. 15.
  16. 16.
  17. 17. Day 4<br />The foundation/crawl space walls are complete.<br />
  18. 18.
  19. 19.
  20. 20. Day 5<br />One less pile of dirt in our yard<br />
  21. 21.
  22. 22. The cement mixer arrives.<br />
  23. 23. A floor for the crawl space…<br />
  24. 24. and basement access<br />
  25. 25. Stone for under the eventual patio<br />
  26. 26. Day 6<br />Our steel beam<br />
  27. 27. Lumber for framing is delivered<br />
  28. 28. Ruts in our yard<br />
  29. 29. Day 7<br />We have a floor!<br />
  30. 30. Getting the back wall ready<br />
  31. 31. Setting the wall in place<br />
  32. 32.
  33. 33.
  34. 34. Day 8<br />The shower arrives<br />
  35. 35. The view from the front<br />
  36. 36. All the walls are up!<br />
  37. 37. The bathroom-to-be<br />
  38. 38. Day 9<br />Roof trusses arrive<br />
  39. 39. The house is wrapped and the roof is started.<br />
  40. 40.
  41. 41. Interior view<br />
  42. 42. Day 10<br />The windows arrive...<br />
  43. 43. and are installed.<br />
  44. 44.
  45. 45.
  46. 46. Turning a window into a door<br />
  47. 47. Day 11<br />Pipes and wires<br />
  48. 48.
  49. 49.
  50. 50.
  51. 51. Day 12<br />Shingles on the roof<br />
  52. 52.
  53. 53. Roughing in the HVAC<br />
  54. 54.
  55. 55. Day 13<br />The fireplace is in place.<br />
  56. 56. The “dog house” and vent<br />
  57. 57. Day 14<br />Getting the future doorway ready<br />
  58. 58. Day 15<br />Insulation installation<br />
  59. 59.
  60. 60.
  61. 61.
  62. 62. Day 16<br />Running wires for the speakers<br />
  63. 63.
  64. 64. Siding delivery<br />
  65. 65. Day 17<br />The drywall arrives<br />
  66. 66.
  67. 67.
  68. 68. A tight fit!<br />
  69. 69. The siding gets started<br />
  70. 70.
  71. 71.
  72. 72. Day 18<br />Here comes the door<br />
  73. 73.
  74. 74. Day 19<br />More siding going up<br />
  75. 75.
  76. 76.
  77. 77. Drywall being hung<br />
  78. 78. Day 20<br />
  79. 79.
  80. 80. Day 21<br />Blowing insulation into the ceilings<br />
  81. 81. More siding<br />
  82. 82.
  83. 83. The beginning of the drywall finishing<br />
  84. 84.
  85. 85. Day 22<br />More work on the drywall<br />
  86. 86.
  87. 87. Finishing the siding<br />
  88. 88. More HVAC installation<br />
  89. 89. Day 23<br />And still more drywall finishing<br />
  90. 90. The new furnace<br />
  91. 91. and air conditioner<br />
  92. 92. Shutters on the front<br />
  93. 93. Day 24<br />Even more drywall work<br />
  94. 94.
  95. 95. Day 25<br />Finished and ready for paint!<br />
  96. 96.
  97. 97. Day 26<br />Before the French doors<br />
  98. 98. How they kept the house clean!<br />
  99. 99. New French doors<br />
  100. 100. Window sills<br />
  101. 101. Bathroom - clean and ready for paint<br />
  102. 102. Day 27<br />Insulating the crawl space ceiling<br />
  103. 103. Working on the trim<br />
  104. 104. Trim for the doors<br />
  105. 105. Trim for the windows<br />
  106. 106. Day 28<br />Doors in place<br />
  107. 107. All trimmed and ready for paint<br />
  108. 108. Day 29<br />Plastic over the windows…<br />
  109. 109. and doorway<br />
  110. 110. A coat of primer and painted doors<br />
  111. 111. Gutters going up<br />
  112. 112. Day 30<br />“Thyme” in the bathroom<br />
  113. 113.
  114. 114. The hardwood gets acclimated<br />
  115. 115. Downspout<br />
  116. 116. Day 31<br />“Mild Wind” in the family room<br />and stained boards for the step<br />
  117. 117. Granite fireplace surround is installed<br />
  118. 118. Ready to install the vinyl<br />
  119. 119. The new bathroom floor<br />
  120. 120. Day 32<br />Getting started on the hardwood<br />
  121. 121.
  122. 122. Day 33<br />Family room floor is almost done<br />
  123. 123.
  124. 124. Day 34<br />Steps are built<br />
  125. 125. Baseboard is up<br />
  126. 126. Plumbing is working<br />
  127. 127. Exterior light installed<br />
  128. 128. Day 35<br />Carpet is patched<br />
  129. 129. The little things<br />
  130. 130. Mantel in a box<br />
  131. 131. Day 36<br />Laying out the mantel<br />
  132. 132. More little details<br />
  133. 133. Final HVAC<br />
  134. 134. Day 37<br />“Mocha” on the mantel<br />
  135. 135. Final coat of paint and<br />glass doors uncovered<br />
  136. 136. Clean shower<br />
  137. 137. Freshly painted walls and baseboard<br />
  138. 138. Day 38<br />Finishing touches<br />
  139. 139.
  140. 140. The closet shelving<br />
  141. 141. Mantel up and fireplace working<br />
  142. 142. Day 39<br />The TV is hung<br />
  143. 143. Final plumbing<br />
  144. 144. Day 40<br />Insulating the walls of the crawl space<br />
  145. 145. Inspection complete<br />Time to decorate!<br />
  146. 146. Furniture in place<br />
  147. 147. Epilogue<br />Curtains!<br />
  148. 148. The perfect chair<br />
  149. 149. Our music corner<br />

×