From:    Brandon Valdez                  To: David Ficklin - OnGoal
                                                      ...
Structural Steel Erection:
 Area 1 – Detailing and decking in sequence 1-3 is ongoing.
 Erection of Steel Sequence 2-1 is ...
Concrete Flatwork:
 Area 1 Field Level – Prep for concrete placement for
 slab-on-grade will continue.

 Area 1 Field Leve...
Additional Photos:




Field Level Area 3 – Cauldron Club field wall   Area 1 – Shot of the West Building from the
reinfor...
Upcoming SlideShare
Loading in...5
×

Weekly Construction Update 07-07-2010

149

Published on

Published in: Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
149
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Weekly Construction Update 07-07-2010

  1. 1. From: Brandon Valdez To: David Ficklin - OnGoal Rory O’Connor – OnGoal Office: Kansas City Lee Turner – OnGoal Date: 7.7.2010 Andy Heitmann – Turner Dave Dudzik - Turner Re: Wizards Stadium Project Update – Week of 7.5.2010 Current Activities this Week: Mass Excavation: Backfilling of on-grade seating is ongoing in Area 2 and Area 3. Site Utilities: Storm Sewer installation (Line 3000) is ongoing along Concourse Level Area 2 – Underground Village West Parkway. plumbing and electrical rough-in for the Concourse Buildings is ongoing. Storm Line Installation (Line 6000 and Sanitary Sewer Line E installation is ongoing on east side of France Family Dive is ongoing. Foundations: Area 3 Field Level – Isolated footing installation is ongoing and is currently to Column Line 3.5. Concrete Flatwork: Area 1 – Mezzanine slab-on deck is complete, Main Concourse structural slab is complete, Suite Level slab Field Level Area 1 – Cast-in-place concrete on deck is complete, Press Level slab on deck is riser installation has started. complete. Field Level Area 1 slab-on-grade is complete from column line 32-29. Structural Steel Erection: Area 1 – Detailing and decking in sequence 1-3 is ongoing. Erection of Steel Sequence 2-1 is ongoing. Field Level Area 1 – Concrete placement for slab-on-grade between column lines 32-29. Building the Future
  2. 2. Structural Steel Erection: Area 1 – Detailing and decking in sequence 1-3 is ongoing. Erection of Steel Sequence 2-1 is ongoing. Underground MEP: Electrical Secondary Distribution is ongoing in Area 3. MEP Rough-in: Area 1 – Shallow electrical and plumbing rough-in will Area 2 –Steel erection in Sequence 2-1 is in continue. full swing. Metal Stud Framing: Area 1 Suite Level – Metal stud framing for Suites is ongoing. Projected Activities occurring next Week: Mass Excavation: Backfilling of on-grade seating areas will continue in Area 3. Site Utilities: Area 1 – Shot of the West Building from the Installation of the Storm Line 6000 on the East Side (France south concourse area. Family Drive) of the site will continue. Deep Underground MEP: Deep Sanitary and Electrical Distribution installation in Area 3 will continue. Foundations: Area 3 Field Level – Foundation installation will continue. Area 4 Mezzanine Level – Foundation Wall installation will continue. Suite Level Area 1 – Metal stud framing for Suites are ongoing. Building the Future
  3. 3. Concrete Flatwork: Area 1 Field Level – Prep for concrete placement for slab-on-grade will continue. Area 1 Field Level – Installation of on-grade seating risers will continue. Structural Steel Erection: Area 1 – Shot from Roof Level showing Erection of Structural Steel in Sequence 2-1 will precast concrete and curvature of steel continue. Decking and detailing in Sequence 2-1 will begin. structure. Erection of the Canopy Trusses will begin. Underground MEP: Electrical Secondary will continue in Area 3. MEP Rough-in: Plumbing and Electrical rough-in for Area 1 Field Level slab on grade will continue. Metal Stud Framing: Area 1 Suite Level – Metal stud framing for Suites will continue. Field Level Area 3 – Foundation installation is ongoing. Area 1 Press Level – Metal stud framing for Suites will begin. Building the Future
  4. 4. Additional Photos: Field Level Area 3 – Cauldron Club field wall Area 1 – Shot of the West Building from the reinforcing in place. northeast. Suite Level Area 1 – Precast tub being picked Suite Level Area 1 – Metal Stud Framing by crane on its way to be installed. installation is ongoing. Suite Level Area 1 – Ironworkers setting and Mezzanine Level Area 4 – Shot of north fastening precast seating tubs. foundation wall installation. Building the Future

×