Your SlideShare is downloading. ×

Memo wizards 08-25-2010

209

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
209
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. From: Brandon Valdez To: David Ficklin - OnGoal Rory O’Connor – OnGoal Office: Kansas City Lee Turner – OnGoal Date: 8.25.2010 Andy Heitmann – Turner Dave Dudzik - Turner Re: Wizards Stadium Project Update – Week of 8.23.2010 Current Activities this Week: Mass Excavation: Backfilling of foundations are ongoing in Area 3. Site Utilities: Tie in of domestic and fire line services are being tied in on the east side of France Family Drive. Area 3 – Connection of the domestic water Foundations: and fire sprinkler service lines. Area 3 Field Level – Foundation installation continues on the east side of the site. Concrete Flatwork: Area 2 – Prep work for next slab pour is complete from Column Line 15 – 12. Structural Steel Erection: Area 2 – Main Canopy Truss Erection are set to Column Line 12. Field Level Area 4 – Excavation of North Field wall footing. Precast Concrete: Area 3 – Precast erection is nearly complete to Column Line 1. Underground MEP: Area 3 - Deep underground Plumbing is ongoing. MEP Rough-in: Area 3 – Shallow electrical and plumbing rough-in is ongoing. Ductwork installation on Suite and Press Levels are ongoing. Plumbing rough-in is ongoing on Suite and Area 3 – Precast tread/riser erection is nearly complete. Building the Future
  • 2. Press Levels. Fire Protection rough-in is ongoing on Suite and Press Levels. Metal Stud Framing: Area 1 – Metal stud framing for Field, Concourse, Suite and Press Levels are ongoing. Masonry: Area 2 – Canopy Truss erection is ongoing in Area 1 Field Level – Masonry wall installation is ongoing Sequence 2-2 (installation of Truss at 12- in Areas F, G and H. Line shown). Area 3 Concourse Level – Picture framing is ongoing for south/east concourse buildings. Projected Activities occurring next Week: Site Utilities: Gas Service installation will begin on France Family Drive. Deep Underground MEP: Deep Plumbing installation will continue in Area 3. Area 1 – Shot of the West Building from Foundations: Column Line 1 (Field Level). Area 4 Field Level – Foundation installation will continue at north field walls. Concrete Flatwork: Area 2 Field Level – Concrete placement for Slab-on Grade between Column Lines 15 - 12. Area 1, 2 and 3 Field Level – Installation of on-grade seating risers and intermediate stairs will continue. Structural Steel Erection: Area 2 – Canopy truss installation at South side of Stadium Will continue. Area 3 – Canopy Truss installation will begin. Mezzanine Level Area 1 – Metal Stud Framing has started at the VIP Area. Underground MEP: Deep underground plumbing will continue in Area 3. Building the Future
  • 3. MEP Rough-in: MEP Rough-in at Suite and Press Levels will continue. Ductwork installation on Press Level will continue. Fire Sprinkler installation will continue on Suite and Press Levels. Metal Stud Framing: Area 1 – Metal stud framing for Field, Concourse, Suite and Press Levels will continue. Area 1 – Installation of curtainwall framing at West Building is ongoing. Roof Level Area 1 – West parapet wall framing is ongoing. Building the Future
  • 4. Additional Photos: Concourse Level Area 1 – Terrace Area Field Level Area 1 – Concrete placement for concrete placement is nearly complete. Stair 11 foundation walls. Area 2 – Shot looking at south elevation of Concourse Level Area 1 – South concourse Stadium. platform concrete being finished. Concourse Level Area 3 – Masonry “picture Field Level Area 3 – Cast-in-place concrete framing” at East Concourse Buildings. riser installation at east seating. Building the Future

×