Your SlideShare is downloading. ×
Weekly Construction Update 06-06-2010
Weekly Construction Update 06-06-2010
Weekly Construction Update 06-06-2010
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Weekly Construction Update 06-06-2010

639

Published on

KC Soccer Stadium construction update from Turner Construction.

KC Soccer Stadium construction update from Turner Construction.

Published in: Sports, Business, Education
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
639
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. From: Brandon Valdez To: David Ficklin - OnGoal Rory O’Connor – OnGoal Office: Kansas City Lee Turner – OnGoal Date: 6.2.2010 Andy Heitmann – Turner Dave Dudzik - Turner Re: Wizards Stadium Project Update – Week of 5.31.2010 Current Activities this Week: Mass Excavation: Grading is ongoing in Area 3. Backfilling of on-grade is ongoing in Area 1 and Area 2. Site Utilities: Storm Sewer installation (Line 6000) is ongoing on east side of France Family Drive. Field Level Area 2 – Underground plumbing pipe installed south of C-Line. Sanitary Sewer Line E installation has started on east side of France Family Dive. Foundations: Area 2 Concourse Level – E-Line footing installation is ongoing E-Line wall installation has started. Area 3 Field Level – A-Line wall installation is ongoing Currently to Column Line 7. Area 3 Field Level – Installation of Drilled Piers Concourse Level Area 2 – E-Line wall forms are ongoing. being installed from Column Lines 23-19. Area 4 Mezzanine Level – D-Line grade beam installation is ongoing. Structural Steel Erection: Area 1 – Steel Erection in sequence 1-5 is ongoing and is currently to Column Line 27. Decking/Detailing/Studs/Edge Angle is ongoing in sequence 1-2 and 1-4. Main Concourse Area 1 – Reinforcing steel and underslab MEP rough-in in preparation for concrete slab placement. Building the Future
  • 2. Underground MEP: Deep Sanitary installation is ongoing in Area 2 and Area 3. MEP Rough-in: Plumbing and Electrical rough-in on Concourse Level is ongoing and has started on Suite Level. Projected Activities occurring next Week: Area 1 – Rakers installed at Column Lines 28- Mass Excavation: 32 that support the precast concrete risers. Grading at Area 3 will continue. Site Utilities: Installation of the Storm Line 6000 on the East Side (France Family Drive) of the site will continue. Storm Line 5000 and 4000 will begin. Installation of Sanitary Line E will continue. Deep Underground Plumbing: Deep Sanitary installation in Area 3 will continue. Area 1 – Structural Steel Erection at West Foundations: Building is ongoing in Sequence 1-5 (bays Area 2 Concourse Level – Footing and wall installation 27-32 shown). will continue. Area 3 Field Level – A-Line wall placement will continue. Area 4 Mezzanine Level – Grade beam installation will continue. Structural Steel Erection: Erection of Structural Steel in Sequence 1-5 will continue. Decking/Detailing/Studs/Edge Plates will continue in Sequence 1-4. Field Level Area 2 – Backfill of stage walls are ongoing. Building the Future
  • 3. Additional Photos: Field Level Area 2/3 – Southeast vomitory Field Level Area 3 – Drilled pier installation is walls and A-Line walls being installed. ongoing. Mezzanine Level Area 4 – D-Line footing installation is ongoing from Column Line 33- Field Level Area 2 – East Stage and ramp 37. walls being placed. Concourse Level Area 1 – Edge plate installation at edge of concrete slabs Suite Level Area 1 – Decking, Nelson Studs, ongoing. and Edge Plating installed. Building the Future

×