Construction Update 5-12-2010

1,211
views

Published on

KC Soccer Stadium construction update from Turner Construction.

KC Soccer Stadium construction update from Turner Construction.


0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
1,211
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
7
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. From: Brandon Valdez To: David Ficklin - OnGoal Rory O’Connor – OnGoal Office: Kansas City Lee Turner – OnGoal Date: 5.12.2010 Andy Heitmann – Turner Dave Dudzik - Turner Re: Wizards Stadium Project Update – Week of 5.10.2010 Current Activities this Week: Mass Excavation: Grading is ongoing in Area 3. Backfilling of on-grade is ongoing in Area 1. Site Utilities: Installation of the new electrical ductbank is ongoing. Field Level Area 2 – A-Line and Field Wall Storm Sewer installation (Line 6000) is ongoing on Footings ready for concrete placement. east side of France Family Drive. Foundations: Area 2 Field Level – Footing installation will be complete to Column Line 12 by the end of the day. Area 1 Mezzanine Level – Installation of Elevator Pit walls are complete. Area 4 Mezzanine Level – Installation of Drilled Piers are ongoing. Field Level Area 3 – Drilled Pier installation is ongoing. Structural Steel Erection: Area 1 – Steel Erection in sequence 1-1 is nearly complete. Sequence 1-2 has started and is currently being erected in the Column Line 27/26 Bay. Decking is nearly complete in sequence 1-1 on Mezzanine and Concourse Levels. France Family Drive – Storm Line 6000 installation is ongoing. Building the Future
  • 2. Underground Electrical: Secondary service ducts is complete from Electrical Room 01.34.04 south past Column Line 25. Installation of secondary service ducts at Column Line D are ongoing. Projected Activities occurring next Week: Concourse Level Area 1 – Decking installed at Main Club. Mass Excavation: Grading at Truck Dock Area will continue. Site Utilities: Installation of the Storm Line 6000 on the East Side (France Family Drive) of the site will continue. Deep Underground Plumbing: Sanitary in Area 3 will begin. Foundations: Area 1 – Structural Steel Erection at West Area 2 Field Level – Placement of foundation walls east of Building continues. B-Line Columns being Stage will begin. set at Column Lines 26 and 27. Area 3 Field Level – Footing excavation will begin. Structural Steel Erection: Erection of Structural Steel in Sequence 1-2 will continue. Field Level Area 1 – Shot looking north from Concourse Level. Building the Future
  • 3. Additional Photos: Field Level Area 2 – Foundations taking Mezzanine Level Area 1 – VIP Entrance shape at Stage. taking shape. Field Level Area 1 – Shot of the Stadium Concourse Level Area 2 – E-Line Footings Suite from Column Line 30 (Field Level). installed to Column Line 20. Area 1 – Shot looking North West showing Concourse Level Area 2 – Electrical ductbank West Building Structural Steel. installation is ongoing. Building the Future