Your SlideShare is downloading. ×
Construction Update 10-6-2010
Construction Update 10-6-2010
Construction Update 10-6-2010
Construction Update 10-6-2010
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Construction Update 10-6-2010

164

Published on

Published in: Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
164
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. From: Brandon Valdez To: David Ficklin - OnGoal Rory O’Connor – OnGoal Office: Kansas City Lee Turner – OnGoal Date: 10.6.2010 Andy Heitmann – Turner Dave Dudzik - Turner Re: Wizards Stadium Project Update – Week of 10.4.2010 Current Activities this Week: Foundations: Area 4 Field Level – Foundations for “infill” area between Column Lines 39-1 are ongoing. Concrete Flatwork: Area 3 Field Level – Concrete for slab-on-grade up to Stair 1 will be placed this week. Field Level Area 3 – Concrete slab-on grade prep is ongoing to column line 4. Masonry: Area 1 – Field level masonry installation is ongoing in Area H, G, F, E and D. Area 2/3 – Concourse building masonry installation is ongoing. Steel Erection: Area 4 – Steel erection for “infill” area is ongoing (Sequence 3-3). Truss installation has started. Area 2 – Steel joist and metal decking installation for concourse buildings is ongoing. Canopy decking Field Level Area 3 – Masonry in Section D is installation is ongoing. Canopy gutter enclosure framing ongoing. installation is ongoing. Roofing and Sheetmetal: Area 1 – Permanent roofing installation at West Building is ongoing. Area 2/3 – Canopy gutter installation is ongoing. Area 4 – Trusses 41 and 42 being set and connected. 1 more truss remains (40 Line). Building the Future
  • 2. Metal Stud Framing: Area 1 – Metal stud framing for Field, Concourse, Suite and Press Levels are ongoing. Exterior metal stud framing and sheathing installation is ongoing at Field, Suite, and Press Levels. Glass: Area 1 - Curtainwall framing and glass installation is ongoing at West Building on west, south and east Field Level Area 4 – Structural steel and elevations. South “wing” framing has started. foundations are ongoing at Cauldron Club. MEP Rough-in: Area 3 – Underground MEP rough-in is ongoing. West Building - Ductwork installation on Concourse, Suite and Press Levels are ongoing. Plumbing rough-in is ongoing on Suite and Press Levels. Fire Protection rough-in is ongoing on Concourse, Suite and Press Levels. Electrical rough-in is ongoing on Concourse, Suite and Press Levels. Projected Activities occurring next Week: Area 3 – Shot of the Canopy decking installation that has started on the east side. Foundations: Area 3/4 Field Level – Foundations for “infill” area Between Column Lines 39-1 will be complete. Concrete Flatwork: Area 3 Field Level – Concrete placement for Slab-on Grade from lower dock area to Column Line 1. Area 3 and 4 Field Level – Installation of on-grade seating risers and intermediate stairs will continue. Masonry: Area 1 – Curtainwall “wing” framing at south Area 1 – Field level masonry installation will continue in end is being constructed. Area H, G, F, E and D. Area 2/3 – Concourse building masonry installation will continue. Building the Future
  • 3. Structural Steel Erection: Area 4 – Structural steel erection for “infill” area will be ongoing. Area 2 – Steel joist and metal decking installation for concourse buildings will continue. Canopy decking installation will continue. Canopy gutter enclosure framing installation will continue. Roofing and Sheetmetal: Area 1 – Permanent roofing installation at West Field – Installation of the Storm Loop around Building will continue. Area 3 – Canopy gutter installation playing field has started. will continue. Metal Stud Framing: Area 1 – Metal stud framing for Field, Concourse, Suite and Press Levels will continue. Exterior Framing and sheathing installation will continue. Glass: Area 1 – Curtain Framing and Glass installation around West Building will continue. Curtainwall framing on Suite and Press Level balconies will continue. Curtainwall framing at Field Side of Main Concourse will continue. MEP Rough-in: Area 1 – Shot of the west building showing MEP Rough-in at Concourse, Suite and Press Levels will the progress of the exterior envelope. continue. Ductwork installation on Concourse, Suite, and Press Level will continue. Fire Sprinkler installation will continue on Concourse, Suite and Press Levels. Building the Future
  • 4. Additional Photos: Area 3– On-grade seating installation is Area 3 – Burnished CMU wall topped out at ongoing at north elevation. Stair 1. Concourse Level Area 3 – Canopy gutter and Area 1 – Concrete in Stair 9 is placed. gutter enclosure framing is ongoing. Area 2 – Shot of the Canopy decking and Area 4 – Shot of Column Line 42 truss be gutter at the SE corner. raised into place. Building the Future

×