From:    Brandon Valdez                  To: David Ficklin - OnGoal
                                                      ...
and sheathing installation is ongoing at Field, Suite, and
 Press Levels.

 Masonry:
 Area 1 Field Level – Masonry wall in...
Metal Stud Framing:
 Area 1 – Metal stud framing for Field, Concourse, Suite
 and Press Levels will continue. Exterior Fra...
Additional Photos:




Area 1 – Shot of Suite fronts from roof of      Suite Level Area 1 – Shot looking through
Stadium S...
Upcoming SlideShare
Loading in...5
×

Construction Update 09-8-2010

142

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
142
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "Construction Update 09-8-2010"

  1. 1. From: Brandon Valdez To: David Ficklin - OnGoal Rory O’Connor – OnGoal Office: Kansas City Lee Turner – OnGoal Date: 9.8.2010 Andy Heitmann – Turner Dave Dudzik - Turner Re: Wizards Stadium Project Update – Week of 9.6.2010 Current Activities this Week: Underground Utilities: Area 3 - Deep underground Plumbing continues. on the east side of France Family Drive. Installation of the gas service has commenced. Foundations: Area 4 Field Level – Upper Field wall forms are being Area 3 – Underground plumbing installation installed. is ongoing at the lower dock area. Concrete Flatwork: Area 2 Concourse – Concrete placement for slab at South Concession Buildings is complete to column line 15. Structural Steel Erection: Area 2 – Main Canopy Truss Erection are set to Column Line 6. Area 4 – Structural Steel in Sequence 3-3 is erected to column line 39. Area 2 – CMU wall installation has started at Stage. MEP Rough-in: Area 3 – Shallow electrical and plumbing rough-in is ongoing. Ductwork installation on Suite and Press Levels are ongoing. Plumbing rough-in is ongoing on Suite and Press Levels. Fire Protection rough-in is ongoing on Suite and Press Levels. Electrical rough-in is ongoing on Suite and Press Levels. Metal Stud Framing: Area 1 – Metal stud framing for Field, Concourse, Suite and Press Levels are ongoing. Exterior metal stud framing Area 4 – Structural Steel Erection Sequence 3-3 has been set to column line 39. Building the Future
  2. 2. and sheathing installation is ongoing at Field, Suite, and Press Levels. Masonry: Area 1 Field Level – Masonry wall installation is ongoing in Areas E, F, G and H. Area 1, 2 Concourse Level – Masonry wall installation at Area 3 – Canopy Truss erection is complete Main Concourse Buildings are underway. in Sequence 2-2 (installation of Truss to 6 Line shown). Curtainwall: Area 1 – Curtainwall framing installation will continue at West Elevation. Installation of Curtainwall glass is ongoing. Projected Activities occurring next Week: Underground Utilities: Deep Plumbing installation will continue in Area 3. Foundations: Area 4 Field Level – Foundation wall installation for Main Stair will begin. Field Level Area 3 – Formwork of Main Stair support walls are being set. Concrete Flatwork: Area 3 Field Level – Concrete placement for Slab-on Grade at upper dock area will begin. Prep work for slab- on-grade for lower dock area will begin. Area 3 and 4 Field Level – Installation of on-grade seating risers and intermediate stairs will continue. Structural Steel Erection: Area 2 – Canopy truss installation at East side of Stadium will continue. Area 1 – Filled and polished CMU Block walls MEP Rough-in: at the Stair 4 and Restrooms. MEP Rough-in at Suite and Press Levels will continue. Ductwork installation on Press Level will continue. Fire Sprinkler installation will continue on Suite and Press Levels. Building the Future
  3. 3. Metal Stud Framing: Area 1 – Metal stud framing for Field, Concourse, Suite and Press Levels will continue. Exterior Framing and sheathing installation will continue. Curtainwall: Area 1 – Curtain Framing and Glass installation will continue. Area 1 – Installation of curtainwall framing and Glass at West Building is ongoing. Area 1 – Shot of the west building showing the progress of the canopy decking on trusses. Building the Future
  4. 4. Additional Photos: Area 1 – Shot of Suite fronts from roof of Suite Level Area 1 – Shot looking through Stadium Suite. the glass at Suite Level Club. Concourse Level Area 1 – Masonry Area 1 – Curtainwall framing installation at installation continues on Concourse south face of Club Areas. Buildings. Field Level Area 3 – Installation of cast-in- Field Level Area 3 – Upper dock slab edge place risers continue on east side. formwork is installed. Building the Future

×