From:    Brandon Valdez                To: David Ficklin - OnGoal
                                                        ...
MEP Rough-in:
 Area 3 – Shallow electrical and plumbing rough-in is
 ongoing. Ductwork installation on Suite and Press Lev...
Concrete Flatwork:
 Area 2 Concourse Level – Concrete placement for Slab-on
 Grade for Main Concourse Buildings will begin...
Additional Photos:




Field Level Area 1 – Curtainwall glass, metal
stud framing and exterior sheathing being
installatio...
Upcoming SlideShare
Loading in...5
×

Construction Update 09-1-2010

247

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
247
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Construction Update 09-1-2010

  1. 1. From: Brandon Valdez To: David Ficklin - OnGoal Rory O’Connor – OnGoal Office: Kansas City Lee Turner – OnGoal Date: 9.1.2010 Andy Heitmann – Turner Dave Dudzik - Turner Re: Wizards Stadium Project Update – Week of 8.30.2010 Current Activities this Week: Mass Excavation: Backfilling of foundations is nearly complete in Area 3. Site Utilities: Tie in of domestic and fire line services are complete on the east side of France Family Drive. Installation of the gas service has commenced. Area 4 – North field wall complete to the Crane Road. Foundations: Area 4 Field Level – Field wall installation up to the crane road is complete. Concrete Flatwork: Area 2 Concourse – Prep work for next slab pour for South Concession Buildings is nearly complete. Area 3 Field Level – Prep work for slab pour at upper dock is nearly complete. Structural Steel Erection: Area 2 – Stage concrete slab placement is Area 2 – Main Canopy Truss Erection are set to Column complete. Line 10. Structural Precast Concrete: Area 3 – Precast tread/riser erection complete. Underground MEP: Area 3 - Deep underground Plumbing is ongoing. Area 3 – Precast tread/riser erection is complete. Building the Future
  2. 2. MEP Rough-in: Area 3 – Shallow electrical and plumbing rough-in is ongoing. Ductwork installation on Suite and Press Levels are ongoing. Plumbing rough-in is ongoing on Suite and Press Levels. Fire Protection rough-in is ongoing on Suite and Press Levels. Electrical rough-in is ongoing on Suite and Press Levels. Metal Stud Framing: Area 2 – Canopy Truss erection is complete Area 1 – Metal stud framing for Field, Concourse, Suite in Sequence 2-2 (installation of Truss to 10 and Press Levels are ongoing. Exterior metal stud framing Line shown). and sheathing installation is ongoing at Field, Suite, and Press Levels. Masonry: Area 1 Field Level – Masonry wall installation is ongoing in Areas F, G and H. Area 3 Concourse Level – Masonry wall installation at Main Concourse Buildings are underway. Curtainwall: Area 1 – Curtainwall framing installation will continue Area 1 – Shot of the West Building from the at West Elevation. Installation of Curtainwall glass is Stage (Field Level). ongoing. Projected Activities occurring next Week: Site Utilities: Gas Service installation will continue on France Family Drive. Deep Underground MEP: Deep Plumbing installation will continue in Area 3. Foundations: Area 4 Field Level – Foundation wall installation for Main Stair will begin. Area 1 – Exterior Metal Stud Framing and sheathing installation ongoing at north side of Stadium Suite. Building the Future
  3. 3. Concrete Flatwork: Area 2 Concourse Level – Concrete placement for Slab-on Grade for Main Concourse Buildings will begin. Area 1, 2 and 3 Field Level – Installation of on-grade seating risers and intermediate stairs will continue. Structural Steel Erection: Area 2 – Canopy truss installation at South side of Stadium Area 1 – Installation of curtainwall framing will continue. Area 3 – Canopy Truss installation will begin. and Glass at West Building is ongoing. Underground MEP: Deep underground plumbing will continue in Area 3. MEP Rough-in: MEP Rough-in at Suite and Press Levels will continue. Ductwork installation on Press Level will continue. Fire Sprinkler installation will continue on Suite and Press Levels. Metal Stud Framing: Area 1 – Metal stud framing for Field, Concourse, Suite and Press Levels will continue. Exterior Framing and Roof Level Area 1 – Installation of decking sheathing installation will continue. on Canopy Trusses has started. Curtainwall: Area 1 – Curtain Framing and Glass installation will continue. Building the Future
  4. 4. Additional Photos: Field Level Area 1 – Curtainwall glass, metal stud framing and exterior sheathing being installation at and above Main Club Area 2 – Shot looking south from roof above Entrance. Stadium Suite. Concourse Level Area 1 – Masonry at Main Concourse Level is underway (Stair 4 Field Level Area 1 – Subroof framing shown). installation is ongoing. Field Level Area 3 – Upper Dock Formwork and MEP rough-in is ongoing in preparation Field Level Area 2 – Masonry installation at for concrete slab placement. Field Level (underneath terrace seating). Building the Future

×